Tunnel second lining waterproof and drainage hot melting gasket adjustable positioning device

By designing an adjustable positioning hot melt washer device, the problem of low spacing accuracy of hot melt washer in traditional construction is solved, and more uniform stress and more efficient construction are achieved.

CN222633251UActive Publication Date: 2025-03-18CHINA RAILWAY 18TH BUREAU GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421385437.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-03-18
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

In traditional tunnel construction, the accuracy of the geotextile hot melt washer spacing is not high, resulting in uneven hanging and affecting the construction quality and progress.

Method used

An adjustable positioning device for tunnel two-lined drainage hot melt washer is designed, adopting plug-in support rod and connecting rod structure, with scales and arc-shaped bayonets, which can adjust its width and length according to the size of the hot melt washer.

Benefits of technology

The accuracy of the spacing of the hot melt washer is improved, the phenomenon of uneven spacing is reduced, the waterproof plate is subjected to uniform stress, the construction quality of secondary lining is improved, the number of construction workers is reduced, and the construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222633251U_ABST
    Figure CN222633251U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel secondary lining waterproof drainage hot melting gasket adjustable positioning device which is composed of a device body, the device body comprises a rhombic frame composed of four supporting rods, the four end corners of the rhombic frame are respectively provided with an arc-shaped bayonet with an outward opening, and the top ends of every two corresponding arc parts of the arc-shaped bayonet are respectively provided with an arc-shaped groove. Connecting rods are connected with each other, and a handle is arranged in the middle of each connecting rod. According to the utility model, the spacing of the geotextile hot-melting washers can be effectively controlled, and the accuracy of the spacing of the hot-melting washers is improved, so that the hanging quality of the geotextile is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to equipment for tunnel construction, in particular to an adjustable positioning device for a tunnel secondary lining waterproof and drainage hot-melt gasket. Background Art

[0002] In traditional construction, the laying of geotextile lining adopts the method of measuring points, manually marking lines, and measuring the spacing between washers. That is, when hanging geotextile lining, workers use measuring points, manually marking lines, and measuring the spacing between washers. The problems are: first, the accuracy of the spacing between washers controlled by workers is not high when hanging geotextile; second, there is arbitrariness in the operation of this method, which makes it difficult to control the spacing of the hot-melt washers of the hung geotextile, the size is uneven, and the accuracy is poor; third, it leads to delays in construction progress, low work efficiency, and affects construction quality. Utility Model Content

[0003] In order to overcome the shortcomings of the above-mentioned prior art, the utility model provides an adjustable positioning device for tunnel secondary lining waterproof hot-melt washers, which can effectively control the spacing of geotextile hot-melt washers during the construction process of hanging geotextile, improve the accuracy of the spacing of hot-melt washers, and thus improve the quality of geotextile hanging.

[0004] The purpose of the utility model is achieved through the following scheme:

[0005] A tunnel secondary lining waterproof hot-melt gasket adjustable positioning device, composed of a device body, the device body includes a diamond-shaped frame composed of four support rods, the four end corners of the diamond-shaped frame are respectively provided with arc-shaped bayonet openings facing outwards, the top ends of every two corresponding arc portions of the arc-shaped bayonet are respectively connected to each other with connecting rods, and the middle of the connecting rod is provided with a handle.

[0006] The support rod is composed of a plug-in outer sleeve and an inner rod structure. A fastener is arranged at the pipe end of the outer sleeve, and a scale is arranged on the rod body of the inner rod.

[0007] The connecting rod is composed of a plug-in outer sleeve and an inner rod structure. A fastener is arranged at the pipe end of the outer sleeve, and a scale is arranged on the rod body of the inner rod.

[0008] The curvature of the arc-shaped bayonet matches the radius of the hot-melt gasket.

[0009] The device body is made of steel material.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] 1. The diamond-shaped frame of the utility model is made according to the designed spacing of the hot-melt gaskets. The support rods and connecting rods adopt a plug-in structure, and their width and length can be adjusted at will. The setting of the scale makes it more effective to improve the accuracy of the gasket spacing, reducing the phenomenon of uneven spacing of the geotextile hot-melt gaskets due to random operation of workers, so that the waterproof board is evenly stressed and the construction quality of the secondary lining is improved.

[0012] 2. This device can position the hot-melt gasket at one time, solving the cumbersome operation procedures of manually marking lines and measuring spacing with a ruler in the prior art. One or two people can operate the positioning device at one time, which can reduce the number of construction workers and improve construction efficiency.

[0013] 3. The utility model is easy to manufacture and can be processed using leftover steel bars, which is low in cost and reduces material waste and can be recycled. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0015] Figure 2 yes Figure 1 Schematic diagram of the plug-in sleeve rod structure.

[0016] Reference numerals: 1 support rod, 2 arc-shaped bayonet, 3 connecting rod, 4 handle fastener 5

[0017] Scale 6 DETAILED DESCRIPTION

[0018] The present invention will be described in further detail below with reference to the accompanying drawings:

[0019] like Figure 1-2As shown: an adjustable positioning device for hot-melt gaskets for waterproofing of the second lining of a tunnel, which is composed of a device body, which is made of steel material, including a diamond-shaped frame composed of four support rods 1, and the support rod 1 is composed of a plug-in outer sleeve and an inner rod structure, a fastener 5 is provided at the pipe end of the outer sleeve, and a scale 6 is provided on the rod body of the inner rod; at the four end corners of the diamond-shaped frame, an arc-shaped bayonet 2 with its opening facing outward is respectively provided, and the curvature of the arc-shaped bayonet 2 described in this embodiment is consistent with the radius of the hot-melt gasket, that is, when the radius of the hot-melt gasket increases, the opening of the arc-shaped bayonet 2 increases accordingly, and vice versa, the top ends of every two corresponding arc portions of the arc-shaped bayonet 2 are respectively connected to each other with a connecting rod 3, that is, the top ends of the arc portions of the two arc-shaped bayonet 2 corresponding to each other in the transverse direction are connected to each other, and the top ends of the arc portions of the two arc-shaped bayonet 2 corresponding to each other in the longitudinal direction are connected to each other. The top ends of the arcs are connected to each other. The connection of the utility model can be welding. The connecting rod 3 is also composed of a plug-in outer sleeve and an inner rod structure. The pipe end of the outer sleeve is provided with a fastener 5, and the rod body of the inner rod is provided with a scale 6; the support rod 1 and the connecting rod 3 of the utility model respectively adopt a plug-in structure, the purpose is to adjust the width and length according to the size of the hot-melt gasket to be installed, and the fastener is provided to fix the outer sleeve and the inner rod to each other; the scale is provided to enable it to more effectively improve the accuracy of the gasket spacing, thereby reducing the uneven spacing of the geotextile hot-melt gaskets due to the arbitrary operation of workers in the prior art, so that the waterproof board is evenly stressed and the construction quality of the secondary lining is improved; in order to make the use of the utility model more convenient, a handle 4 is also provided in the middle of the connecting rod 3.

[0020] The working process of the utility model is:

[0021] After the geotextile is initially positioned, the hot-melt gasket is installed. The installation of the hot-melt gasket requires the cooperation of two people, one person operating and the other assisting. The operator holds a nail gun in one hand and the handle of the hot-melt gasket positioning device in the other hand. After adjusting the position of the positioning device according to the plum blossom arrangement, the fastener is screwed in. The assistant places the hot-melt gasket according to the arc-shaped bayonet at the four corners of the positioning device. After the operator fixes the hot-melt gasket with a nail gun, the next hot-melt gasket is fixed, and the operation is cyclically operated from top to bottom.

[0022] In actual use, the utility model can adjust the length of the support rod and the size of the arc-shaped bayonet according to the requirements of the hot-melt gasket spacing and specifications in the drawings and related documents, and is simple to manufacture and convenient to operate. The number of construction workers is reduced, and the construction efficiency and the accuracy of the hot-melt gasket spacing are effectively improved.

[0023] Although the utility model has been described above in conjunction with the drawings, the utility model is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are merely illustrative and not restrictive. Under the guidance of the utility model, ordinary technicians in this field can also make improvements and modifications without departing from the purpose of the utility model, all of which are within the protection of the utility model.

Claims

1. An adjustable positioning device for hot-melt gaskets for tunnel secondary lining waterproofing and drainage, consisting of a device body, characterized in that: The device body comprises a diamond-shaped frame formed by four supporting rods (1), and arc-shaped bayonet holes (2) opening outward are respectively arranged at the four end corners of the diamond-shaped frame, and the top ends of two corresponding arc portions of the arc-shaped bayonet holes (2) are respectively connected to each other with connecting rods (3), and a handle (4) is arranged in the middle of the connecting rod (3).

2. The adjustable positioning device for hot-melt gaskets for tunnel secondary lining waterproofing and drainage according to claim 1 is characterized by: The support rod (1) is composed of a plug-in outer sleeve and an inner rod structure; a fastener (5) is provided at the pipe end of the outer sleeve, and a scale (6) is provided on the rod body of the inner rod.

3. The adjustable positioning device for hot-melt gaskets for tunnel secondary lining waterproofing and drainage according to claim 1 is characterized by: The connecting rod (3) is composed of a plug-in outer sleeve and an inner rod structure; a fastener (5) is provided at the pipe end of the outer sleeve, and a scale (6) is provided on the rod body of the inner rod.

4. The adjustable positioning device for hot-melt gaskets for tunnel secondary lining waterproofing and drainage according to claim 1 is characterized by: The curvature of the arc-shaped bayonet (2) matches the radius of the hot-melt gasket.

5. The adjustable positioning device for hot-melt gaskets for tunnel secondary lining waterproofing and drainage according to claim 1 is characterized by: The device body is made of steel material.