Water conservancy building connecting structure stable in connection

By using components such as long plates and rubber strips in the connecting structure of water conservancy buildings to block and convert energy to the water flow, combined with the support seat design deep into the ground, the problem of impermissible impact of the connecting structure of water conservancy buildings in the existing technology is solved, significantly improving the stability and tilt resistance of the structure, extending the service life and reducing transportation costs.

CN222648672UActive Publication Date: 2025-03-21山东黄河勘测设计研究院有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420958727.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2025-03-21
Estimated Expiration
2034-05-06

AI Technical Summary

Technical Problem

The existing water conservancy building connection structure fails to provide sufficient protective measures in the connection part of the support seat and the floating dock, making it difficult to deal with the impact of transverse water flow, resulting in the connection being vulnerable to damage, affecting the stability and safety of the structure.

Method used

The connecting structure including support seats, floating docks, vertical blocks, cross boards, round blocks, rubber strips, connecting blocks, long boards and water tanks is adopted. The water flow energy is converted through the direct blocking of water flow and mechanical action of the long board, increasing the structure's resistance to impacts on the transverse water flow, and improving the stability and tilt resistance of the structure through the support seat design deep into the ground.

Benefits of technology

It effectively improves the structure's resistance to lateral water flow impact, ensures the stability of the floating dock, reduces structural damage caused by long-term water flow impact, extends the service life of water conservancy buildings, and reduces transportation costs and installation difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222648672U_ABST
    Figure CN222648672U_ABST
Patent Text Reader

Abstract

The utility model provides a water conservancy building connecting structure stable in connection, and relates to the technical field of connecting structures, the water conservancy building connecting structure comprises a supporting seat, a floating dock and a vertical block are fixedly installed on the top surface of the supporting seat, a cross plate is arranged on the surface of the vertical block in a penetrating mode, and a round block is fixedly installed at one end of the cross plate; a rubber strip is fixedly installed on the surface of the round block, and a connecting block is fixedly installed at the other end of the cross plate. Water flow energy is converted through direct blocking of water flow by the long plates and subsequent mechanical actions, the resistance of the structure to transverse water flow impact is improved, the stability of the landing stage under the water flow impact is guaranteed, the impact force of the water flow can be effectively dispersed and absorbed, and the service life of the landing stage is prolonged. Therefore, structural damage possibly caused by long-term water flow impact can be reduced, the service life of the water conservancy building is prolonged, the arranged water passing groove allows water flow to pass, natural flowing of the water flow is ensured, the working pressure of the long plate is reduced, and practicability is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of connection structures, in particular to a water conservancy building connection structure with stable connection. Background Art

[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. By building water conservancy projects, floods and waterlogging disasters can be prevented, and the amount of water can be regulated and distributed to meet the needs of people's lives and production for water resources. Among them, water conservancy projects usually require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts and fishways.

[0003] Publication No. CN216616265U discloses a stable water conservancy construction connection structure, including a support seat and a floating dock, wherein a limiting groove is provided on the upper surface of the support seat, a limiting rod is provided inside the limiting groove, a fixed slot is provided at the front end of the limiting groove, a fixed plug is provided on the surface of the floating dock, the outer surface of the fixed plug and the lower surface of the fixed slot are provided with engaging teeth, the surface of the fixed plug and the inner part of the fixed slot are provided with limiting holes, a cleaning box is provided at the lower end of the support seat, an electric push rod is provided inside the cleaning box, a movable rod is provided inside the electric push rod, a cleaning rod is provided at the end of the movable rod, and a cleaning brush is provided on the upper surface of the cleaning rod. Although this water conservancy construction connection structure is convenient to disassemble and install, it can be automatically cleaned at the same time, improving the appearance and service life. However, this type of water conservancy building connection structure fails to provide adequate protection measures to cope with the impact of lateral water flow at the connection part between the support base and the floating dock, which makes the connection vulnerable to damage when encountering strong lateral water flow, affecting the stability and safety of the overall structure. At the same time, the water flow generates accumulated pressure at the connection part, aggravating the burden on the structure and reducing its reliability and durability in long-term use. Therefore, improvements are needed. Utility Model Content

[0004] The purpose of the utility model is to solve the technical problems raised in the above background technology.

[0005] The utility model adopts the following technical scheme: a water conservancy building connection structure with stable connection, including a support seat, a floating dock and a vertical block are fixedly installed on the top surface of the support seat, a cross plate is penetrated on the surface of the vertical block, a round block is fixedly installed on one end of the cross plate, a rubber strip is fixedly installed on the surface of the round block, a connecting block is fixedly installed on the other end of the cross plate, a long plate is fixedly installed on the bottom surface of the connecting block, and a sleeve is fixedly installed on the top surface of the support seat.

[0006] Preferably, the surface of the long board is provided with water channels, and the water channels are arranged at equal distances on the surface of the long board. Here, water can be allowed to pass through, ensuring the natural flow of water and reducing the working pressure of the long board.

[0007] Preferably, the size of the inner wall of the sleeve is the same as that of the round block, and the rubber strip fits the inner wall of the sleeve.

[0008] Preferably, the cross plate is slidably connected to the vertical block, and the top surface of the vertical block is provided with a chamfer, so that burrs on the top surface of the vertical block can be removed.

[0009] Preferably, a reinforcement mechanism is provided on the side of the support seat, and the reinforcement mechanism includes a slot, the slot is opened on the side of the support seat, an insert is inserted into the inner wall of the slot, a screw hole A is opened on the side of the insert, a screw hole B is opened on the inner wall of the slot, fixing bolts are inserted inside the screw holes A and B, and a plug is fixedly installed on the side of the insert. Here, the installation strength of the support seat can be reinforced.

[0010] Preferably, one end of the plug is a pointed cone structure, and the slot and the plug block are both "T" shaped structures. Here, the plug can be easily inserted.

[0011] Preferably, the slots are arranged at equal distances on the side of the support base.

[0012] Compared with the prior art, the advantages and positive effects of the utility model are:

[0013] 1. The utility model directly blocks the water flow with the long board and converts the water flow energy through the subsequent mechanical action, thereby improving the resistance of the structure to the impact of the lateral water flow and ensuring the stability of the floating dock under the impact of the water flow. Since it can effectively disperse and absorb the impact force of the water flow, it can reduce the structural damage that may be caused by the long-term water flow impact and extend the service life of the water conservancy building. The water trough allows the water flow to pass through, ensuring the natural flow of the water flow, reducing the working pressure of the long board, and having high practicality.

[0014] 2. The utility model significantly increases the stability and anti-tilt ability of the structure through the design of the support base that penetrates into the ground. It is particularly suitable for environments with strong water flow or unstable foundation. Moreover, since the piles can be installed on site, the transportation of large prefabricated components is avoided, which not only reduces the requirements for transportation equipment, but also significantly reduces transportation costs. The on-site installation capability of the piles provides greater flexibility, so that the support base can be adaptively adjusted according to the on-site terrain and soil conditions, thereby increasing the scope of application and having high practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1A schematic diagram of a stable water conservancy building connection structure is provided for the utility model;

[0016] Figure 2 A top view of a stable water conservancy building connection structure is proposed for the utility model;

[0017] Figure 3 The utility model proposes a stable connection structure for water conservancy buildings Figure 2 Enlarged view of point A in the middle;

[0018] Figure 4 An exploded diagram of a stable water conservancy building connection structure is proposed for the utility model;

[0019] Figure 5 The utility model proposes a stable connection structure for water conservancy buildings Figure 4 Enlarged view of point B in the middle.

[0020] Legend:

[0021] 1. Support seat; 2. Floating dock; 3. Vertical block; 4. Piles; 5. Cross plate; 6. Round block; 7. Rubber strip; 8. Connecting block; 9. Long board; 10. Water channel; 11. Sleeve; 12. Slot; 13. Insert block; 14. Screw hole A; 15. Screw hole B; 16. Fixing bolt. DETAILED DESCRIPTION

[0022] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0023] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0024] Embodiment 1

[0025] See also Figure 1-5The utility model provides a technical solution: a water conservancy construction connection structure with stable connection, including a support seat 1, on the top surface of which a floating dock 2 and a vertical block 3 are fixedly installed. A cross plate 5 is provided throughout the surface of the vertical block 3, and the cross plate 5 is slidably connected with the vertical block 3 by means of a slide groove, providing a stable and reliable guide to ensure that the cross plate 5 can slide smoothly under the impact of water flow. A chamfer is provided on the top surface of the vertical block 3 to reduce friction and facilitate the smooth movement of the cross plate 5. A round block 6 is fixedly installed at one end of the cross plate 5, and a rubber strip 7 is fixedly installed on the surface of the round block 6. The rubber strip 7 can be made of silicone, natural rubber or other materials with a high friction coefficient, and is used to increase the friction with the inner wall of the sleeve 11, thereby effectively offsetting the impact of the water flow.

[0026] See also Figure 1-5 , the other end of the cross plate 5 is fixedly installed with a connecting block 8, and the bottom surface of the connecting block 8 is fixedly installed with a long plate 9. The surface of the long plate 9 is provided with a water trough 10, and the water troughs 10 are arranged at equal distances on the surface of the long plate 9, so that the water flow can pass smoothly, reducing the direct impact pressure on the long plate 9. The top surface of the support seat 1 is fixedly installed with a sleeve 11, and the size of the inner wall of the sleeve 11 is the same as that of the round block 6. When encountering a lateral water flow impact, the long plate 9 can block the water flow, and the long plate 9 can drive the cross plate 5 to slide in the vertical block 3, and the cross plate 5 can then drive the round block 6 to slide in the sleeve 11, and the round block 6 drives the rubber strip 7 to rub the inner wall of the sleeve 11. At this time, the friction force generated can offset the impact force of the water flow, so that the rubber strip 7 and the inner wall of the sleeve 11 fit tightly. The sleeve 11 can be made of stainless steel, aluminum alloy or other corrosion-resistant materials to ensure durability and stability for long-term use.

[0027] Embodiment 2

[0028] See also Figure 4-5, a reinforcement mechanism is provided on the side of the support seat 1, and the reinforcement mechanism includes a slot 12, and the slots 12 are arranged at equal distances on the side of the support seat 1, and the slots 12 are opened on the side of the support seat 1. This equidistant arrangement helps to evenly distribute the external force and enhance the stability of the structure. An insert block 13 is inserted into the inner wall of the slot 12, and both the slot 12 and the insert block 13 are "T"-shaped structures. This "T"-shaped structural design can provide a larger contact area to improve the connection strength and stability of the structure. A screw hole A14 is opened on the side of the insert block 13, and a screw hole B15 is opened on the inner wall of the slot 12, and a fixing bolt 16 is inserted inside the screw hole A14 and the screw hole B15. The fixing bolt 16 can be made of stainless steel, which has good corrosion resistance and high strength, ensuring the reliability of the connection and the stability of long-term use. The side of the plug block 13 is fixedly installed with a plug pile 4. The plug block 13 is aligned with the slot 12 and inserted, and then the fixing bolt 16 is screwed into the screw hole A14 and the screw hole B15. At this time, the plug pile 4 can be connected. In this way, when the support base 1 is installed, the support base 1 can be deeply inserted into the ground, which can improve the stability of the support base 1. Since the plug pile 4 can be installed on site, the transportation cost can be reduced. One end of the plug pile 4 is a pointed cone structure. This pointed cone structure helps the plug pile 4 to be more easily inserted into the ground, thereby improving the installation efficiency and stability.

[0029] Working principle: the floating dock 2 can be installed on the support seat 1 for use. During use, when encountering a lateral water flow impact, the long board 9 can block the water flow, and at the same time, the long board 9 can drive the cross board 5 to slide in the vertical block 3. The cross board 5 can then drive the round block 6 to slide in the sleeve 11, and at the same time, the round block 6 drives the rubber strip 7 to rub the inner wall of the sleeve 11. The friction force generated at this time can offset the impact force of the water flow, and the water flow trough 10 provided can also allow water to pass through, thereby reducing the impact force on the long board 9. The utility model directly blocks the water flow through the long board 9 and converts the water flow energy through the subsequent mechanical action, thereby improving the resistance of the structure to the impact of lateral water flow, ensuring the stability of the floating dock 2 under the impact of water flow, and because it can effectively disperse and absorb the impact force of the water flow, it can reduce the structural damage that may be caused by long-term water flow impact, thereby extending the service life of the water conservancy building, and the water flow trough 10 provided allows water to flow The natural flow of water is ensured and the working pressure of the long board 9 is reduced. When installing the support seat 1, the staff can align the plug block 13 with the slot 12 and insert it, and then screw the fixing bolt 16 into the screw hole A14 and the screw hole B15. At this time, the pile 4 can be connected. In this way, when installing the support seat 1, the support seat 1 can be deeply inserted into the ground, which can improve the stability of the support seat 1. Since the pile 4 can be installed on site, the transportation cost can be reduced. The utility model significantly increases the stability and anti-tilt ability of the structure through the design of the support seat 1 deep into the ground, which is particularly suitable for environments with strong water flow or unstable foundations. Since the pile 4 can be installed on site, the transportation of large prefabricated components is avoided, which not only reduces the requirements for transportation equipment, but also significantly reduces transportation costs. The on-site installation capability of the pile 4 provides greater flexibility, so that the support seat 1 can be adaptively adjusted according to the on-site terrain and soil conditions, thereby improving the scope of application.

[0030] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A water conservancy construction connection structure with stable connection, comprising a support base (1), characterized in that: The top surface of the support seat (1) is fixedly mounted with a floating dock (2) and a vertical block (3); the surface of the vertical block (3) is penetrated by a cross plate (5); one end of the cross plate (5) is fixedly mounted with a round block (6); the surface of the round block (6) is fixedly mounted with a rubber strip (7); the other end of the cross plate (5) is fixedly mounted with a connecting block (8); the bottom surface of the connecting block (8) is fixedly mounted with a long plate (9); and the top surface of the support seat (1) is fixedly mounted with a sleeve (11).

2. The stable connection structure for water conservancy buildings according to claim 1 is characterized in that: The surface of the long plate (9) is provided with water channels (10), and the water channels (10) are arranged at equal distances on the surface of the long plate (9).

3. The stable connection structure for water conservancy buildings according to claim 1 is characterized in that: The size of the inner wall of the sleeve (11) is the same as that of the round block (6), and the rubber strip (7) fits the inner wall of the sleeve (11).

4. The stable connection structure for water conservancy buildings according to claim 1 is characterized in that: The cross plate (5) is slidably connected to the vertical block (3), and the top surface of the vertical block (3) is provided with a chamfer.

5. The stable connection structure for water conservancy buildings according to claim 1 is characterized in that: A reinforcement mechanism is provided on the side of the support seat (1), and the reinforcement mechanism comprises a slot (12), the slot (12) is opened on the side of the support seat (1), an insert block (13) is inserted into the inner wall of the slot (12), a screw hole A (14) is opened on the side of the insert block (13), a screw hole B (15) is opened on the inner wall of the slot (12), fixing bolts (16) are inserted into the inside of the screw hole A (14) and the screw hole B (15), and a plug pile (4) is fixedly installed on the side of the insert block (13).

6. The stable connection structure for water conservancy buildings according to claim 5 is characterized by: One end of the plug pile (4) is a pointed cone structure, and the slot (12) and the plug block (13) are both "T"-shaped structures.

7. The stable connection structure for water conservancy buildings according to claim 5 is characterized by: The slots (12) are arranged at equal distances on the side of the support seat (1).

Citation Information

Patent Citations

  • Water conservancy building connecting structure stable in connection

    CN216616265U