Construction conveying pipe erecting structure
By designing the construction feed pipe mount structure of multiple hook-hook units, and using components such as pulling bend plates, adapter seats, telescopic components and limiting components, the problem of difficulty in selecting the installation position of the feed pipe mount structure in complex environments in the prior art is solved, and higher installation convenience and practicality are achieved.
Patent Information
- Application Number
- CN202420459861.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-03-11
AI Technical Summary
The existing construction feed pipe erection structure is difficult to obtain the installation position in a complex environment, which reduces the convenience and practicality of the installation process.
A construction feed pipe mount structure including multiple sets of hook and hang units is designed. Each set of hook and hang units includes a pulling bend plate, adapter seat, telescopic component, limiting component, etc. Through the synergy of these components, flexible fixation of the feed pipe and convenient selection of the installation position are achieved.
It improves the flexibility and convenience of the device in the process of selecting the installation position, enhances the practicality and applicability of the device, and at the same time improves the impact resistance and firmness of the device.
Smart Images

Figure CN222650746U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of industrial and civil construction, in particular to a construction material conveying pipe erection structure. Background Art
[0002] The full name of industrial and civil construction is industrial and civil construction, which is a small category under the general category of civil engineering. Industrial buildings are buildings that directly serve production, including factories and workshops. Civil buildings are auxiliary buildings to meet people's production and living needs, including ordinary residential buildings, office buildings and various comprehensive buildings. During the construction process of industrial and civil construction, material pipelines are needed to transport gaseous, liquid or solid materials. During the laying process, the material pipes need to be fixed by constructing material pipe erection structures.
[0003] When the construction material conveying pipe erection structure in the prior art is in use, the material conveying pipe is fixed by two sets of arc-shaped clamping plates driven by bolts and nuts, and then the extension rod fixed on one side of the arc-shaped clamping plate is fixed to a set position by expansion bolts. However, due to the complex environment in which the device is located, it is difficult for the device to obtain an installation position conveniently, which reduces the convenience of the device during installation and thus affects the practicability of the device.
[0004] Based on this, the utility model designs a construction material conveying pipe erection structure to solve the above problems. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides a construction material conveying pipe erection structure, which solves the problems raised in the above-mentioned background technology.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction material delivery pipe erection structure, including multiple groups of hook units, each group of the hook units includes a pulling and fixing bent plate, the outer surface of each group of the pulling and fixing bent plate is fixedly installed with an adapter seat by rivets, the inner wall of each group of the adapter seat is provided with a telescopic component, each group of the telescopic component includes two groups of telescopic screws, and telescopic brackets are screwed between the outer surfaces of the two groups of telescopic screws, and the top of the telescopic screw on the upper side of each group is provided with a limit assembly, and each Each group of limit assemblies includes a deflection support, each group of deflection supports is hinged with a rotating support through a central axis, the inner wall of each group of rotating supports is provided with an angle adjustment shaft, the outer surface of each group of angle adjustment shaft can be rotatably mounted with a limit stop ring, the top of each group of limit stop rings is provided with a limit plate, the top of each group of limit plates is provided with multiple groups of matching holes, three groups of expansion bolts are provided on the upper side of each group of limit stop rings, and the outer surface of each group of expansion bolts can be slidably inserted into the inner wall of the corresponding matching hole.
[0009] Preferably, a locking nut is screwed onto the outer surface of each group of telescopic screws, and the inner end of each group of locking nuts is tightly pressed against the outer surface of the corresponding telescopic bracket.
[0010] Preferably, the outer surface of each group of the retaining bent plates is provided with a conformal rib plate, and the top of each group of the conformal rib plates is fixedly connected to the bottom of the corresponding adapter seat.
[0011] Preferably, a hanging plate is provided at the bottom of each group of the conformal rib plates, a hanging rope can be slidably inserted into the inner wall of each group of the hanging plates, and an information tag can be slidably mounted on the outer surface of each group of the hanging ropes.
[0012] Preferably, the inner wall of each group of the retaining bending plates is provided with a buffer pad, and the inner wall of each group of the buffer pad is provided with a plurality of groups of anti-slip grooves.
[0013] Preferably, the outer surface of each group of the retaining bending plates, adapter seats, telescopic brackets, deflection supports, rotating supports, limit rings and limit plates is provided with an anti-corrosion coating.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the utility model provides a construction material conveying pipe installation structure, which has the following beneficial effects:
[0016] 1. The construction material conveying pipe erection structure uses a limit assembly to enable personnel to determine the limited position according to the environment where the material conveying pipe is located, and then fix the limit plate through expansion bolts, and then drive the deflection support to rotate along the angle adjustment axis relative to the rotation support. The deflection support drives the fixing bent plate to move to one side of the material conveying pipe through the telescopic assembly and the adapter, and then drives the fixing bent plate to hook and fix the material conveying pipe through the telescopic assembly, which improves the flexibility of the device in selecting the installation position, enhances the convenience of the device during installation, and thus enhances the practicability of the device.
[0017] 2. The construction material conveying pipe erection structure uses a telescopic component to enable personnel to determine the initial setting distance according to the distance between the limited position and the material conveying pipe, and drive the two sets of telescopic screws to move in the opposite direction by rotating the telescopic bracket. During this process, the telescopic screw drives the traction bending plate to move to the initial setting distance through the adapter. During the fixing process of the device, the telescopic bracket drives the traction bending plate to move toward the material conveying pipe, which further improves the selection range of the device for the installation position, strengthens the versatility of the device, and thus enhances the applicability of the device.
[0018] 3. The construction material conveying pipe erection structure transmits hooking stress to the material conveying pipe through the hooking unit during the movement of the traction bending plate. The adjacent hooking units transmit reverse hooking stress to the material conveying pipe in an interval manner. Multiple groups of reverse hooking stress pull and fix the material conveying pipe, which increases the firmness of the device. At the same time, the adjacent hooking units form a triangular suspension structure with the cooperation of the material conveying pipe. The impact stress on the material conveying pipe is transmitted and reduced through the triangular suspension structure, which improves the impact resistance of the device and thus enhances the practicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the structure of the utility model;
[0020] Figure 2 It is a schematic diagram of the hook unit of the structure of the utility model;
[0021] Figure 3 It is a schematic exploded view of the three-dimensional structure of the structural limiting component of the utility model.
[0022] In the figure: 1. Hook unit; 2. Fixing bending plate; 3. Adapter; 4. Telescopic assembly; 5. Telescopic screw; 6. Telescopic bracket; 7. Limit assembly; 8. Deflection support; 9. Center axis; 10. Rotating support; 11. Angle adjustment axis; 12. Limiting ring; 13. Limiting plate; 14. Adapter hole; 15. Expansion bolt; 16. Anti-loosening nut; 17. Conformal rib plate; 18. Suspension plate; 19. Suspension rope; 20. Information tag; 21. Buffer pad. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-3The utility model provides a technical solution: a construction material conveying pipe erection structure, including multiple groups of hook units 1, through which the hook units 1 transmit hook stress to the material conveying pipe during the movement of the traction bending plate 2, and the adjacent hook units 1 transmit reverse hook stress to the material conveying pipe in an interval manner. The multiple groups of reverse hook stress pull and fix the material conveying pipe, which increases the firmness of the device. At the same time, the adjacent hook units 1 form a triangular suspension structure with the cooperation of the material conveying pipe. The impact stress on the material conveying pipe is transmitted and reduced through the triangular suspension structure, which improves the impact resistance of the device, thereby enhancing the practicality of the device. Each group of hook units 1 includes a traction bending plate 2, The outer surface of each set of traction bending plate 2 is fixed with an adapter seat 3 by rivets, and the inner wall of each set of adapter seat 3 is provided with a telescopic component 4. Through the telescopic component 4, the personnel can determine the initial setting distance according to the distance between the limited position and the conveying pipe, and drive the two sets of telescopic screws 5 to move in the opposite direction by rotating the telescopic bracket 6. In this process, the telescopic screw 5 drives the traction bending plate 2 to move to the initial setting distance through the adapter seat 3. During the fixing process of the device, the traction bending plate 2 is driven to move toward the conveying pipe by the telescopic bracket 6, which further improves the selection range of the device for the installation position, strengthens the versatility of the device, and thus enhances the applicability of the device. Each set of telescopic components 4 Each of the two sets of telescopic screws 5 includes two sets of telescopic brackets 6 screwed between the outer surfaces of the two sets of relatively telescopic screws 5. The top of each set of upper telescopic screws 5 is provided with a limit assembly 7. Through the limit assembly 7, the personnel can determine the limit position according to the environment where the feed pipe is located, and then fix the limit plate 13 through the expansion bolt 15, and then drive the deflection support 8 to rotate along the angle adjustment axis 11 relative to the rotating support 10. The deflection support 8 drives the traction bending plate 2 to move to one side of the feed pipe through the telescopic assembly 4 and the adapter 3, and then drives the traction bending plate 2 to hook and fix the feed pipe through the telescopic assembly 4, which improves the flexibility of the device in selecting the installation position, and adds The convenience during the installation of the device is enhanced, thereby enhancing the practicality of the device. Each set of limit components 7 includes a deflection support 8, each set of deflection supports 8 is hinged with a rotating support 10 through a central axis 9, the inner wall of each set of rotating supports 10 is provided with an angle adjustment shaft 11, and the outer surface of each set of angle adjustment shaft 11 can be rotatably mounted with a limit stop ring 12, and the top of each set of limit stop ring 12 is provided with a limit plate 13, and the top of each set of limit plates 13 is provided with multiple sets of adapter holes 14, and three sets of expansion bolts 15 are arranged on the upper side of each set of limit stop ring 12, and the outer surface of each set of expansion bolts 15 can be slidably plugged into the inner wall of the corresponding adapter hole 14.
[0025] In the utility model, in order to improve the stability of the device during operation, a lock nut 16 for transmitting a pre-tightening force thereto is threadedly installed on the outer surface of each set of telescopic screws 5, thereby reducing the probability of the telescopic screws 5 rotating relative to the telescopic bracket 6. The inner end of each set of lock nuts 16 is tightly pressed against the outer surface of the corresponding telescopic bracket 6, thereby improving the stability of the device during operation.
[0026] In the utility model, in order to reduce the probability of deformation failure of the retaining bent plate 2, a conformal rib plate 17 for improving the structural strength is provided on the outer surface of each group of retaining bent plates 2, and the top of each group of conformal rib plates 17 is fixedly connected to the bottom of the corresponding adapter 3, thereby reducing the probability of deformation failure of the retaining bent plate 2.
[0027] In the utility model, in order to improve the convenience of determining various information of the hook unit 1, a hanging plate 18 is provided at the bottom of each group of conformal rib plates 17, and the inner wall of each group of hanging plates 18 can be slidably inserted with a hanging rope 19, and the outer surface of each group of hanging ropes 19 can be slidably mounted with an information tag 20 for carrying various information of the hook unit 1, thereby improving the convenience of determining various information of the hook unit 1.
[0028] In the utility model, in order to reduce the probability of damage to the surface of the feed pipe during the operation of the device, a buffer pad 21 for reducing the hardness of the contact surface between the device and the feed pipe is provided on the inner wall of each set of retaining bent plates 2, and a plurality of anti-skid grooves are provided on the inner wall of each set of buffer pads 21, thereby reducing the probability of damage to the surface of the feed pipe during the operation of the device.
[0029] In the utility model, in order to extend the effective service life of the device, an anti-corrosion coating for reducing the rust rate is provided on the outer surface of each set of the pulling bending plate 2, the adapter seat 3, the telescopic bracket 6, the deflection support 8, the rotating support 10, the limit ring 12 and the limit plate 13, thereby extending the effective service life of the device.
[0030] When in use, first determine the limited position according to the environment where the material conveying pipe is located. After the limited position is selected, the initial set distance is determined according to the distance between it and the material conveying pipe. Then, the two sets of telescopic screws 5 are driven to move in the opposite direction by rotating the telescopic bracket 6. During this process, the telescopic screw 5 drives the pulling bending plate 2 to move to the initial set distance through the adapter seat 3. The setting point of the expansion bolt 15 is determined according to the bending direction of the device and the actual interference. Then, the expansion bolt 15 is fixedly installed to the selected setting point. After the expansion bolt 15 is fixed, the limiting plate 13 is driven to rotate along the angle adjustment axis 11 through the limiting retaining ring 12. After the adapter hole 14 is adjusted to the position that coincides with the expansion bolt 15, the limiting plate 13 is fixed to the limited position through it, and then the adapter hole 14 is brought to the position where it coincides with the expansion bolt 15. The movable deflection support 8 rotates along the angle adjustment axis 11 relative to the rotating support 10, and the deflection support 8 drives the adapter seat 3 to rotate through the telescopic component 4. The adapter seat 3 drives the traction bending plate 2 to move to one side of the feed pipe and then rotates the telescopic bracket 6. The telescopic bracket 6 drives the two groups of telescopic screws 5 to move in the opposite direction. During this process, the telescopic screw 5 drives the traction bending plate 2 to move toward the feed pipe through the adapter seat 3. During the movement of the traction bending plate 2, the feed pipe is transmitted with hooking stress, and the adjacent hooking units 1 transmit reverse hooking stress to the feed pipe in an interval manner. Multiple groups of reverse hooking stress pull and fix the feed pipe. At the same time, the adjacent hooking units 1 form a triangular suspension structure with the cooperation of the feed pipe, and the impact stress on the feed pipe is transmitted and reduced through the triangular suspension structure.
[0031] In summary, the construction material conveying pipe installation structure, through the limit assembly 7, allows personnel to determine the limited position according to the environment where the material conveying pipe is located, and then fix the limit plate 13 through the expansion bolt 15, and then drive the deflection support 8 to rotate along the angle adjustment axis 11 relative to the rotating support 10. The deflection support 8 drives the retaining bent plate 2 to move to the side of the material conveying pipe through the telescopic assembly 4 and the adapter 3, and then drives the retaining bent plate 2 to hook and fix the material conveying pipe through the telescopic assembly 4, which improves the flexibility of the device in selecting the installation position, enhances the convenience of the device during installation, and thus enhances the practicability of the device.
[0032] The construction material conveying pipe erection structure uses the telescopic component 4 to enable personnel to determine the initial set distance according to the distance between the limited position and the material conveying pipe, and drives the two sets of telescopic screws 5 to move in the opposite direction by rotating the telescopic bracket 6. During this process, the telescopic screw 5 drives the retaining bent plate 2 to move to the initial set distance through the adapter 3. During the fixing process of the device, the telescopic bracket 6 drives the retaining bent plate 2 to move toward the material conveying pipe, which further improves the selection range of the device for the installation position, strengthens the versatility of the device, and thus enhances the applicability of the device.
[0033] The construction material conveying pipe erection structure transmits hooking stress to the material conveying pipe through the hooking unit 1 during the movement of the pulling bending plate 2. The adjacent hooking units 1 transmit reverse hooking stress to the material conveying pipe in an interval manner. Multiple groups of reverse hooking stresses pull and fix the material conveying pipe, thereby increasing the firmness of the device. At the same time, the adjacent hooking units 1 form a triangular suspension structure with the cooperation of the material conveying pipe. The impact stress on the material conveying pipe is transmitted and reduced through the triangular suspension structure, thereby improving the impact resistance of the device and enhancing the practicability of the device.
[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction material delivery pipe erection structure, comprising a plurality of hook units (1), characterized in that: Each group of the hook units (1) comprises a pulling and fixing bent plate (2), the outer surface of each group of the pulling and fixing bent plate (2) is fixedly mounted with an adapter seat (3) by means of rivets, the inner wall of each group of the adapter seat (3) is provided with a telescopic assembly (4), each group of the telescopic assembly (4) comprises two groups of telescopic screws (5), a telescopic bracket (6) is screwed between the outer surfaces of the two groups of telescopic screws (5), a limiting assembly (7) is provided at the top end of each group of the upper telescopic screws (5), each group of the limiting assembly (7) comprises a deflection support (8), and each group of the deflection support (8) is fixedly mounted with a rivet. The central axis (9) is hingedly connected with a rotating support (10), and the inner wall of each group of the rotating supports (10) is provided with an angle adjustment shaft (11), and the outer surface of each group of the angle adjustment shaft (11) is rotatably mounted with a limit stop ring (12), and the top of each group of the limit stop ring (12) is provided with a limit plate (13), and the top of each group of the limit plate (13) is provided with a plurality of groups of matching holes (14), and the upper side of each group of the limit stop ring (12) is provided with three groups of expansion bolts (15), and the outer surface of each group of the expansion bolts (15) is slidably plugged into the inner wall of the corresponding matching hole (14).
2. A construction material delivery pipe erection structure according to claim 1, characterized in that: The outer surface of each group of telescopic screw rods (5) is threaded with a locking nut (16), and the inner end of each group of locking nut (16) is tightly pressed against the outer surface of the corresponding telescopic bracket (6).
3. The construction material delivery pipe installation structure according to claim 1, characterized in that: The outer surface of each group of the retaining bending plates (2) is provided with a conforming rib plate (17), and the top of each group of the conforming rib plates (17) is fixedly connected to the bottom of the corresponding adapter seat (3).
4. A construction material delivery pipe erection structure according to claim 3, characterized in that: A hanging plate (18) is provided at the bottom of each group of the conformal rib plates (17), a hanging rope (19) is slidably inserted into the inner wall of each group of the hanging plates (18), and an information hanging tag (20) is slidably mounted on the outer surface of each group of the hanging ropes (19).
5. The construction material conveying pipe erection structure according to claim 1, characterized in that: The inner wall of each group of the retaining bending plates (2) is provided with a buffer pad (21), and the inner wall of each group of the buffer pad (21) is provided with a plurality of groups of anti-slip grooves.
6. The construction material conveying pipe installation structure according to claim 1, characterized in that: The outer surfaces of each group of the retaining bending plate (2), the adapter seat (3), the telescopic bracket (6), the deflection support (8), the rotation support (10), the limit ring (12) and the limit plate (13) are provided with an anti-corrosion coating.