Concrete slope protection solidification blanket

By hot-pressing and bonding the accommodating strips on the concrete slope curing blanket and filling the concrete, the difficulty of fixing adjacent blankets is solved, and a fast and stable fixing effect is achieved, reducing manpower consumption and reducing movement risks.

CN222666842UActive Publication Date: 2025-03-25LIAONING RUNTAI BOYUAN TECHNOLOGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421405190.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2025-03-25
Estimated Expiration
2034-06-19

AI Technical Summary

Technical Problem

At present, the adjacent concrete slope curing blankets require a lot of manpower to fix them together and are prone to movement.

Method used

A concrete slope protection curing blanket is designed, which hot-press bonds the first and second container strips at the edges of the water-absorbing protective layer and the moisturizing layer, and contains a concrete filling layer at the contents of the container strips, and seals them with leakage-proof tape to prevent leakage. When laying, the two adjacent blankets are fixed together by solidification of the glue strip and the filling layer.

Benefits of technology

Fast fixation and stable connection of adjacent concrete slope-guarding blankets is achieved, reducing manpower consumption and reducing movement risks after watering.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222666842U_ABST
    Figure CN222666842U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete slope protection solidification blanket, which relates to the technical field of cement blankets and comprises a solidification blanket body. A water absorption protection layer and a moisture preservation layer are arranged on the upper side and the lower side of the curing blanket body respectively; a first concrete filling layer is filled between the water absorption protection layer and the moisturizing layer; a first accommodating rubber strip is hot-pressed and bonded on one side of the water-absorbing protective layer; a second accommodating adhesive tape extends from one side of the moisturizing layer in a hot-pressing bonding manner; a second concrete filling layer and a third concrete filling layer are contained in one side of the first containing rubber strip and one side of the second containing rubber strip correspondingly. When the concrete slope protection solidification blanket is laid and the adjacent positions are fixed, operation is fast and convenient, and the concrete slope protection solidification blanket is not prone to moving after being watered.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cement blankets, in particular to a concrete slope protection solidification blanket. Background Art

[0002] Concrete slope protection solidification blanket, also known as cement blanket, is a new type of environmentally friendly ecological composite waterproof and anti-seepage material. It is generally composed of a water-absorbing protective layer, a concrete filling layer (including a reinforced reinforcement layer) and a moisture-retaining layer. It uses a needle-punched fiber skeleton or sutured composite together to form a flexible and efficient concrete slope protection solidification blanket.

[0003] When laying concrete slope protection curing blankets on the slope, adjacent concrete slope protection curing blankets need to be fixed together. Currently, the methods of fixing two adjacent cement blankets include nailing U-shaped nails at their adjacent edges for fixing, or applying cement or sealant on their contacting edges. This process requires a lot of manpower and is prone to movement.

[0004] In the process of implementing this embodiment, the inventors have found at least the following problems:

[0005] Currently, adjacent concrete slope protection solidification blankets are fixed together, which requires a lot of manpower and is prone to movement. Utility Model Content

[0006] In order to overcome the problems existing in the above-mentioned background technology, the purpose of the utility model is to provide a concrete slope protection solidification blanket to solve the problem that adjacent concrete slope protection solidification blankets are currently fixed together, which requires a lot of manpower and is prone to movement.

[0007] To achieve its purpose, the utility model adopts the following technical solutions:

[0008] A concrete slope protection curing blanket, comprising: a curing blanket body;

[0009] The upper side and the lower side of the curing blanket body are respectively provided with a water absorption protection layer and a moisture retention layer;

[0010] A first concrete filling layer is filled between the water absorption protective layer and the moisture retaining layer;

[0011] A first accommodating adhesive strip is thermally pressed and bonded to one side of the water absorbing protective layer;

[0012] A second accommodating adhesive strip is extended by thermal compression bonding on one side of the moisturizing layer;

[0013] A second concrete filling layer and a third concrete filling layer are respectively accommodated on one side of the first accommodating rubber strip and the second accommodating rubber strip.

[0014] Preferably, a first containing groove is opened at the lower side of the first containing rubber strip, the first concrete filling layer is filled in the first containing groove, and a first leak-proof tape is pasted on the first containing rubber strip to prevent the second concrete filling layer in the first containing groove from leaking out.

[0015] Preferably, a second containing groove is opened on the upper side of the second containing rubber strip, the second concrete filling layer is filled in the second containing groove, and a second anti-leakage tape is pasted on the second containing rubber strip to prevent the third concrete filling layer in the second containing groove from leaking out.

[0016] Preferably, the first anti-leakage tape is adhered to the entire end surface of the first containing groove and extends to the other end surface of the first containing tape.

[0017] Preferably, the second anti-leakage tape is adhered to the entire end surface of the second containing groove and extends to the other end surface of the second containing strip.

[0018] Preferably, the curing blanket body has a thickness of 0.5 cm to 1.5 cm.

[0019] Preferably, the width of the curing blanket body is 1 meter to 4 meters.

[0020] Beneficial effects of the utility model:

[0021] The utility model provides a concrete slope protection solidification blanket, which has a simple structure and a reasonable design. A first accommodating rubber strip and a second accommodating rubber strip are respectively heat-pressed and bonded at the edge positions of a water-absorbing protective layer and a moisture-retaining layer. A first concrete filling layer and a second concrete filling layer are respectively accommodated in the first accommodating rubber strip and the second accommodating rubber strip, and are respectively blocked by a first anti-leakage tape and a second anti-leakage tape;

[0022] When laying this concrete slope protection curing blanket, first lay the first concrete slope protection curing blanket, and tear off the second anti-leakage tape on its second accommodating strip; then start laying the second concrete slope protection curing blanket, and lay the moisture-retaining layer of the second concrete slope protection curing blanket on the second accommodating strip of the first concrete slope protection curing blanket, and lay the first accommodating strip of the second concrete slope protection curing blanket on the water-absorbing protective layer of the first concrete slope protection curing blanket, and align the first concrete filling layer of the first concrete slope protection curing blanket with the first concrete filling layer of the second concrete slope protection curing blanket. At this time, peel off the first anti-leakage tape on the first accommodating strip on the second concrete slope protection curing blanket.

[0023] After that, just pour water on the surface, the third concrete filling layer on the first concrete slope protection curing blanket solidifies and is fixedly connected to the moisture-retaining layer on the second concrete slope protection curing blanket, and the second concrete filling layer on the second concrete slope protection curing blanket solidifies and is fixedly connected to the water-absorbing protective layer on the first concrete slope protection curing blanket. When laying this concrete slope protection curing blanket, the adjacent positions are fixed, the operation is quick and convenient, and it is not easy to move after pouring water. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] For ease of explanation, the present invention is described in detail by the following specific implementations and drawings.

[0025] Figure 1 It is a structural schematic diagram of this embodiment;

[0026] Figure 2 is a schematic diagram of the structure of the present embodiment when viewed from above;

[0027] Figure 3 This is a schematic diagram of the structure when the first anti-leakage tape is torn off in this embodiment;

[0028] Figure 4 This is a schematic diagram of the structure when the second anti-leakage tape is torn off in this embodiment;

[0029] Figure 5 It is a schematic structural diagram of two adjacent curing blanket bodies of this embodiment when they are fixed together;

[0030] Figure 6 for Figure 5 Schematic diagram of the enlarged structure at point A in the middle.

[0031] In the figure:

[0032] 100-curing blanket body; 110-water absorption protective layer; 111-first containing rubber strip; 112-first containing groove; 113-first leak-proof tape; 120-moisturizing layer; 121-second containing rubber strip; 122-second containing groove; 123-second leak-proof tape; 130-first concrete filling layer; 140-second concrete filling layer; 150-third concrete filling layer. DETAILED DESCRIPTION

[0033] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments; in the following description, specific details such as specific configurations and components are provided only to help fully understand the embodiments of the present invention. Therefore, it should be clear to those skilled in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present invention. In addition, for the sake of clarity and brevity, the description of known functions and structures is omitted.

[0034] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features thereof may be combined with each other.

[0035] like Figure 1-6 The present embodiment shows a concrete slope protection solidification blanket, comprising: a solidification blanket body 100; a water absorption protective layer 110 and a moisture retaining layer 120 are respectively arranged on the upper side and the lower side of the solidification blanket body 100; a first concrete filling layer 130 is filled between the water absorption protective layer 110 and the moisture retaining layer 120; a first accommodating rubber strip 111 is heat-pressed and bonded to one side of the water absorption protective layer 110; a second accommodating rubber strip 121 is heat-pressed and bonded to one side of the moisture retaining layer 120; a second concrete filling layer 140 and a third concrete filling layer 150 are respectively accommodated on one side of the first accommodating rubber strip 111 and the second accommodating rubber strip 121.

[0036] Furthermore, a first containing groove 112 is opened at the lower side of the first containing rubber strip 111, and the first concrete filling layer 130 is filled in the first containing groove 112. A first leak-proof tape 113 is pasted on the first containing rubber strip 111 to prevent the second concrete filling layer 140 in the first containing groove 112 from leaking out.

[0037] Furthermore, a second containing groove 122 is opened on the upper side of the second containing rubber strip 121, and the second concrete filling layer 140 is filled in the second containing groove 122. A second leak-proof tape 123 is pasted on the second containing rubber strip 121 to prevent the third concrete filling layer 150 in the second containing groove 122 from leaking out.

[0038] Furthermore, the first anti-leakage tape 113 is adhered to the entire end surface of the first receiving groove 112 and extends to the other end surface of the first receiving tape 111 .

[0039] Furthermore, the second anti-leakage tape 123 is adhered to the entire end surface of the second receiving groove 122 and extends to the other end surface of the second receiving tape 121 .

[0040] Specifically, when laying this concrete slope protection curing blanket, first lay the first concrete slope protection curing blanket, and tear off the second leakage-proof tape 123 on its second containing rubber strip 121; then start laying the second concrete slope protection curing blanket, and lay the moisturizing layer 120 of the second concrete slope protection curing blanket on the second containing rubber strip 121 of the first concrete slope protection curing blanket, and lay the first containing rubber strip 111 of the second concrete slope protection curing blanket on the water absorption protective layer 110 of the first concrete slope protection curing blanket, and align the first concrete filling layer 130 of the first concrete slope protection curing blanket with the first concrete filling layer 130 of the second concrete slope protection curing blanket. At this time, just peel off the first leakage-proof tape 113 on the first containing rubber strip 111 on the second concrete slope protection curing blanket.

[0041] After that, just pour water on the surface, the third concrete filling layer 150 on the first concrete slope protection curing blanket solidifies and is fixedly connected to the moisture-retaining layer 120 on the second concrete slope protection curing blanket, and the second concrete filling layer 140 on the second concrete slope protection curing blanket solidifies and is fixedly connected to the water-absorbing protective layer 110 on the first concrete slope protection curing blanket. When laying this concrete slope protection curing blanket, the adjacent positions are fixed, the operation is quick and convenient, and it is not easy to move after pouring water.

[0042] Furthermore, the thickness of the curing blanket body 100 is 0.5 cm to 1.5 cm.

[0043] Furthermore, the width of the curing blanket body 100 is 1 meter to 4 meters.

[0044] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0045] In the description of the present application, it should be understood that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0046] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0047] Those skilled in the art to which the present application belongs may make various modifications or additions to the described specific embodiments or replace them in a similar manner, but they will not deviate from the spirit of the present application or exceed the scope defined by the attached claims.

Claims

1. A concrete slope protection solidification blanket, characterized in that: include: A curing blanket body (100); The upper side and the lower side of the curing blanket body (100) are respectively provided with a water absorption protection layer (110) and a moisture retention layer (120); A first concrete filling layer (130) is filled between the water absorption protection layer (110) and the moisture retention layer (120); A first accommodating adhesive strip (111) is thermally pressed and bonded to one side of the water-absorbing protective layer (110); A second accommodating adhesive strip (121) is extended on one side of the moisturizing layer (120) by heat-compression bonding; A second concrete filling layer (140) and a third concrete filling layer (150) are respectively accommodated on one side of the first accommodating rubber strip (111) and the second accommodating rubber strip (121).

2. A concrete slope protection solidification blanket according to claim 1, characterized in that: A first containing groove (112) is provided at the lower side of the first containing rubber strip (111), the first concrete filling layer (130) is filled in the first containing groove (112), and a first anti-leakage tape (113) is adhered to the first containing rubber strip (111) to prevent the first concrete filling layer (130) in the first containing groove (112) from leaking out.

3. A concrete slope protection solidification blanket according to claim 2, characterized in that: A second containing groove (122) is provided on the upper side of the second containing rubber strip (121), and the second concrete filling layer (140) is filled in the second containing groove (122). A second anti-leakage tape (123) is adhered to the second containing rubber strip (121) to prevent the second concrete filling layer (140) in the second containing groove (122) from leaking out.

4. A concrete slope protection solidification blanket according to claim 3, characterized in that: The first anti-leakage tape (113) is adhered to the entire end surface of the first containing groove (112) and extends to the other end surface of the first containing tape (111).

5. A concrete slope protection solidification blanket according to claim 4, characterized in that: The second anti-leakage tape (123) is adhered to the entire end surface of the second containing groove (122) and extends to the other end surface of the second containing tape (121).

6. A concrete slope protection solidification blanket according to claim 5, characterized in that: The curing blanket body (100) has a thickness of 0.5 cm to 1.5 cm.

7. A concrete slope protection solidification blanket according to claim 6, characterized in that: The curing blanket body (100) has a width of 1 meter to 4 meters.