Enclosing wall for salt lake area

By using interval-set steel pipe piles and concrete foundations in the fences in the Salt Lake area, the problem of wall tilt caused by the dissolution of salt soil is solved, the stability and service life of the fence are improved, and the maintenance cost is reduced.

CN222667814UActive Publication Date: 2025-03-25QINGHAI SALT LAKE IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420512522.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2025-03-25
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

The walls in the Salt Lake area are prone to tilt or collapse due to the dissolution of the saline soil around the foundation.

Method used

Multiple pile foundations arranged in salted soil are used as foundations, including steel pipe piles and concrete foundations. The strength and stability of the foundation are increased through steel pipe piles, and concrete foundations are used locally to reduce material usage.

Benefits of technology

It effectively avoids the problem of wall tilt caused by the dissolution of saline soil, increases the service life of the wall, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222667814U_ABST
    Figure CN222667814U_ABST
Patent Text Reader

Abstract

The utility model provides an enclosing wall for a salt lake area. The enclosing wall for the salt lake area comprises a foundation which comprises a plurality of pile foundations arranged on salinized soil at intervals; the multiple supporting columns are correspondingly connected with the multiple pile foundations; one fence is arranged between every two adjacent supporting columns; wherein the pile foundation comprises a steel pipe pile and a concrete foundation, the concrete foundation is buried in the salinized soil, the steel pipe pile penetrates through the concrete foundation to be inserted into the salinized soil, and the concrete foundation is connected to the steel pipe pile. According to the technical scheme, the problem that in the prior art, when an enclosing wall is used for a salt lake, part of salinized soil around a foundation is dissolved, and consequently the enclosing wall inclines is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of fences for salt lakes, in particular to a fence used in salt lake areas. Background Art

[0002] Most salt chemical companies build salt pans or factories in mining areas. The construction of salt pans only requires the construction of dams, and there is no need to build walls for protection. However, the company's factory buildings, workshops and office areas need to be built with walls to achieve safety separation and aesthetics. Therefore, all corporate office areas in the mining area are separated by walls to achieve safety areas, such as Figure 1 As shown, reinforced concrete 1 is generally used as the foundation of the wall, that is, a certain depth is dug under the ground, the foundation of the wall is made by pre-embedding reinforced concrete 1, and then a steel fence 2 is installed on the upper part of the reinforced concrete or brickwork is directly used to build the wall. The above-mentioned wall foundation treatment method requires a large amount of cement, sand and steel bars. Using reinforced concrete 1 as the foundation on the upper part of the general frozen soil layer and soil layer can make it durable. However, since the mining area is all saline soil, once the saline soil around the reinforced concrete foundation encounters fresh water, the saline soil at the bottom and both sides of the foundation will dissolve, which will eventually cause the bottom of the reinforced concrete 1 to collapse, thereby affecting the stability of the wall and causing the entire wall to tilt, and even in severe cases, there is a risk of the wall collapsing. Utility Model Content

[0003] The main purpose of the utility model is to provide a fence for salt lake areas to solve the problem that the fence in the prior art used in salt lakes is prone to tilt due to the dissolution of part of the saline soil around the foundation.

[0004] In order to achieve the above-mentioned purpose, the utility model provides a fence for use in salt lake areas, comprising: a foundation, including a plurality of pile foundations spaced apart in saline soil; a plurality of support columns, correspondingly connected to the plurality of pile foundations; at least one fence, with a fence provided between two adjacent support columns; wherein the pile foundation comprises a steel pipe pile and a concrete foundation, the concrete foundation is buried in the saline soil, the steel pipe pile passes through the concrete foundation and is inserted into the saline soil, and the concrete foundation is connected to the steel pipe pile.

[0005] Furthermore, the steel pipe pile includes a steel pipe and an anti-corrosion coating coated on the outer circumference of the steel pipe.

[0006] Furthermore, a guide plate is provided at one end of the steel pipe away from the support column, and the guide plate is inclined relative to the steel pipe.

[0007] Furthermore, an angle A is formed between the guide plate and the axis of the steel pipe, and the angle A is greater than or equal to 30° and less than or equal to 50°.

[0008] Furthermore, the steel pipe is a cylindrical structure with an internal through hole, and the guide plate is sealed and connected to the end of the steel pipe.

[0009] Furthermore, the diameter of the steel pipe is greater than or equal to 108 mm.

[0010] Furthermore, the wall thickness of the steel pipe is greater than or equal to 10 mm and less than or equal to 15 mm.

[0011] Furthermore, the concrete foundation includes a steel cage and concrete poured into the steel cage, wherein the steel cage is located at the periphery of the steel pipe pile and is welded to the steel pipe pile.

[0012] Furthermore, the height ratio of the steel pipe pile to the steel cage is greater than or equal to 4 and less than or equal to 6.

[0013] Furthermore, the fence used in the salt lake area also includes a connecting plate welded to the steel pipe piles, the connecting plate is located on the side of the steel pipe piles facing the support column, a plurality of bolts are welded on the connecting plate, and the support column is provided with a plurality of threaded holes that cooperate with the threads of the plurality of bolts.

[0014] By applying the technical solution of the utility model, on the one hand, by setting steel pipe piles that pass through the concrete foundation and are inserted into the saline soil, that is, by additionally setting steel pipe piles, not only the strength of the foundation of the fence can be increased, but also the depth of part of the foundation buried in the saline soil can be increased to increase the stability of the foundation of the fence, thereby avoiding the problem of the fence tilting caused by the dissolution of part of the saline soil around the foundation; on the other hand, compared with the prior art of setting the entire continuous concrete foundation, in this embodiment, by setting multiple pile foundations at intervals in the saline soil, that is, using the concrete foundation locally, the amount of concrete used can be reduced to reduce the deadweight of the foundation, thereby reducing the probability of the foundation sinking. In this way, the service life of the fence in the salt lake area can be increased, avoiding the problem of high maintenance costs for enterprises due to the need for repairs after a few years. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0016] Figure 1 A schematic structural diagram of an embodiment of a fence in the prior art is shown;

[0017] Figure 2 The schematic structural diagram of an embodiment of the utility model for a fence in a salt lake area is shown.

[0018] The above drawings include the following reference numerals:

[0019] 10. Guide plate; 11. Steel pipe piles; 12. Concrete foundation; 13. Fence; 20. Support column. DETAILED DESCRIPTION

[0020] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0021] like Figure 2 As shown, an embodiment of the utility model provides a fence for use in salt lake areas. The fence in the salt lake area includes a foundation, a plurality of support columns 20 and at least one fence 13. The foundation includes a plurality of pile foundations spaced apart in saline soil; the plurality of support columns 20 are correspondingly connected to the plurality of pile foundations; a fence 13 is provided between two adjacent support columns 20; the pile foundation includes a steel pipe pile 11 and a concrete foundation 12, the concrete foundation 12 is buried in the saline soil, the steel pipe pile 11 passes through the concrete foundation 12 and is inserted into the saline soil, and the concrete foundation 12 is connected to the steel pipe pile 11.

[0022] In the above technical solution, on the one hand, by setting the steel pipe piles 11 inserted into the saline soil through the concrete foundation 12, that is, by additionally setting the steel pipe piles 11, not only the strength of the foundation of the fence can be increased, but also the depth of part of the foundation buried in the saline soil can be increased to increase the stability of the foundation of the fence, thereby avoiding the problem of the fence tilting caused by the dissolution of part of the saline soil around the foundation; on the other hand, compared with the prior art of setting the entire continuous concrete foundation, in this embodiment, by setting multiple pile foundations at intervals in the saline soil, that is, using the concrete foundation locally, the amount of concrete used can be reduced to reduce the deadweight of the foundation, thereby reducing the probability of the foundation sinking. In this way, the service life of the fence in the salt lake area can be increased, avoiding the problem of high maintenance costs for enterprises due to the need for repairs after a few years.

[0023] Furthermore, compared with the prior art which sets up an entire continuous concrete foundation, in this embodiment, by setting multiple pile foundations at intervals in saline soil, that is, using concrete foundations locally, the use of reinforced concrete is greatly reduced to solve the problem of high manufacturing costs caused by the use of concrete processing in mining areas; the service life can be extended, and the construction waste generated by repairs is reduced to protect the ecological environment of the mining area.

[0024] Preferably, in an embodiment of the present invention, the fence is made of steel.

[0025] Specifically, in the embodiment of the present invention, the steel pipe pile 11 comprises a steel pipe and an anti-corrosion coating applied to the outer circumference of the steel pipe, so as to prevent the steel pipe from being corroded by salt.

[0026] Preferably, in an embodiment of the utility model, the anti-corrosion coating is an asphalt oil layer.

[0027] like Figure 2 As shown, in the embodiment of the utility model, a guide plate 10 is provided at one end of the steel pipe away from the support column 20, and the guide plate 10 is inclined relative to the steel pipe. In this way, the resistance of the steel pipe pile inserted into the saline soil can be reduced, thereby facilitating the insertion of the steel pipe pile into the saline soil and reducing the construction difficulty.

[0028] Specifically, in the embodiment of the present invention, there is an angle A between the guide plate 10 and the axis of the steel pipe, and the angle A is greater than or equal to 30° and less than or equal to 50°. The angle A is preferably 45°.

[0029] Specifically, in the embodiment of the utility model, the steel pipe is a cylindrical structure with an internal through hole, and the guide plate 10 is sealed and connected to the end of the steel pipe, so as to prevent salt or brine from entering the steel pipe from the bottom of the steel pipe and corroding the steel pipe.

[0030] Preferably, in the embodiment of the present invention, the bottom of the steel pipe is cut into a 45-degree bevel angle, and a steel plate (guide plate 10) having the same wall thickness as the steel pipe is welded to the steel pipe.

[0031] Specifically, in the embodiment of the utility model, the diameter of the steel pipe is greater than or equal to 108 mm. In this way, the stability of the steel pipe pile inserted into the saline soil can be increased, thereby increasing the stability of the foundation.

[0032] Among them, the diameter of the steel pipe pile is preferably 200mm-300mm.

[0033] Specifically, in the embodiment of the present invention, the wall thickness of the steel pipe is greater than or equal to 10 mm and less than or equal to 15 mm. Compared with conventional steel pipes, this embodiment uses a steel pipe with thickened wall thickness to extend the anti-corrosion period by thickening the wall thickness, thereby increasing the service life of the steel pipe.

[0034] like Figure 2 As shown, in the embodiment of the present invention, the concrete foundation 12 includes a steel cage and concrete poured into the steel cage, and the steel cage is located at the periphery of the steel pipe pile 11 and is welded to the steel pipe pile 11. In this way, the contact area between the pile foundation and the saline soil can be increased to better support the support column 20.

[0035] Specifically, in the embodiment of the utility model, the height ratio of the steel pipe pile 11 to the steel cage is greater than or equal to 4 and less than or equal to 6. In this way, the steel pipe pile 11 can be buried deep in the saline soil relative to the concrete foundation 12, thereby increasing the stability of the foundation.

[0036] In the embodiment of the present invention, the height of the steel cage is preferably 500mm-800mm.

[0037] Specifically, in the embodiment of the present invention, the width ratio of the steel cage to the steel pipe pile 11 is greater than or equal to 4, and less than or equal to 6.

[0038] In the embodiment of the present invention, the width of the steel cage is preferably 500mm-800mm.

[0039] Preferably, in an embodiment of the utility model, the steel cage is connected to the steel pipe by welding, and the steel cage includes a plurality of steel layers spaced along the axis of the steel pipe and a plurality of longitudinal bars spaced around the circumference of the steel pipe, each longitudinal bar extending along the axis of the steel pipe, and the plurality of longitudinal bars are used to connect the plurality of steel layers in different planes, and the longitudinal bars are connected to the steel layers by binding, wherein the steel layers include a plurality of annular steel bars located on the outer periphery of the steel pipe and a plurality of transverse bars used to connect the plurality of annular steel bars, the plurality of annular steel bars are spaced along the radial direction of the steel pipe, the plurality of transverse bars are spaced along the circumference of the steel pipe, each transverse bar is arranged at an angle to the axis of the steel pipe, the plurality of transverse bars are welded to the steel pipe, and each transverse bar is connected to the annular steel bars by binding. The above-mentioned steel cage is a cylindrical steel cage, and its specific structure is prior art, which will not be described in detail here.

[0040] Specifically, in an embodiment of the utility model, the fence used in the salt lake area also includes a connecting plate welded to the steel pipe pile 11, the connecting plate is located on the side of the steel pipe pile 11 facing the support column 20, a plurality of bolts are welded on the connecting plate, and the support column 20 is provided with a plurality of threaded holes that cooperate with the threads of the plurality of bolts.

[0041] Through the above arrangement, a detachable connection between the support column 20 and the steel pipe pile 11 can be achieved, which not only allows the steel pipe pile 11 to support the support column 20 , but also facilitates the maintenance or replacement of the support column 20 .

[0042] In one embodiment, the bare steel pipe pile 11 and the support column 20 may also be directly welded.

[0043] Preferably, in the embodiment of the utility model, the connecting plate is welded to the steel pipe pile 11, and the connecting plate is a square steel plate with a side length of 350mm-500mm, and four threaded bolts are welded on the top of the steel plate. The four bolts are in a square manner, and their distribution spacing is generally 200mm-300mm.

[0044] It should be noted that in the embodiment of the present utility model, the specific steps for setting the wall in the salt lake area are:

[0045] 1. First, dig a 50cm square pit in the saline soil with a depth of 50cm. Prefabricate the steel frame on the top of the steel pipe pile and weld the steel bars to form a 40cm-50cm cube frame.

[0046] 2. Use mechanical equipment to drive the steel pipe pile into the saline land. After the steel pipe pile is driven into the saline soil, when the top of the steel frame is at the same level as the original ground, stop driving the steel pipe pile downwards and start pouring concrete on the top steel frame. At this point, the construction of a steel pipe pile is completed. The depth of the steel pipe pile can be set at 2 to 4 meters according to specific needs. Due to the shortage of cement and sand in the salt lake area, after adopting this wall foundation treatment method, the wall on the top of the foundation can use a steel wall instead of a solid brick wall.

[0047] 3. After the concrete solidifies, the support column 20 is installed on the upper part of the concrete, and the support column 20 and the steel pipe pile 11 are connected by multiple bolts on the connecting plate.

[0048] 4. After the support column 20 is fixed, the steel fence and the support column 20 can be connected, and the fence 13 is now installed.

[0049] From the above description, it can be seen that the above-mentioned embodiment of the utility model achieves the following technical effects: on the one hand, by setting steel pipe piles that pass through the concrete foundation and are inserted into the saline soil, that is, by additionally setting steel pipe piles, not only the strength of the foundation of the fence can be increased, but also the depth of part of the foundation buried in the saline soil can be increased to increase the stability of the foundation of the fence, thereby avoiding the problem of the fence tilting caused by the dissolution of part of the saline soil around the foundation; on the other hand, compared with the prior art that sets the entire continuous concrete foundation, in this embodiment, by setting multiple pile foundations at intervals in the saline soil, that is, using a concrete foundation locally, the amount of concrete used can be reduced to reduce the deadweight of the foundation, thereby reducing the probability of foundation sinking. In this way, the service life of the fence in the salt lake area can be increased, avoiding the problem of high maintenance costs for enterprises due to the need for repairs after a few years.

[0050] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A fence for use in salt lake areas, characterized in that: include: foundation, including multiple pile foundations set at intervals in saline soil; A plurality of support columns (20) connected to the plurality of pile foundations accordingly; at least one fence (13), wherein one fence (13) is provided between two adjacent support columns (20); The pile foundation comprises a steel pipe pile (11) and a concrete foundation (12); the concrete foundation (12) is buried in saline soil; the steel pipe pile (11) passes through the concrete foundation (12) and is inserted into the saline soil; and the concrete foundation (12) is connected to the steel pipe pile (11).

2. The fence for salt lake areas according to claim 1, characterized in that: The steel pipe pile (11) comprises a steel pipe and an anti-corrosion coating coated on the outer circumference of the steel pipe.

3. The fence for salt lake area according to claim 2, characterized in that: A guide plate (10) is provided at one end of the steel pipe away from the support column (20), and the guide plate (10) is arranged obliquely relative to the steel pipe.

4. The fence for use in salt lake areas according to claim 3, characterized in that: An included angle A is formed between the guide plate (10) and the axis of the steel pipe, and the included angle A is greater than or equal to 30° and less than or equal to 50°.

5. The fence for use in salt lake areas according to claim 4, characterized in that: The steel pipe is a cylindrical structure with an internal through hole, and the guide plate (10) is sealed and connected to the end of the steel pipe.

6. The fence for salt lake area according to claim 2, characterized in that: The diameter of the steel pipe is greater than or equal to 108 mm.

7. The fence for use in salt lake areas according to claim 2, characterized in that: The wall thickness of the steel pipe is greater than or equal to 10 mm and less than or equal to 15 mm.

8. The fence for use in salt lake areas according to any one of claims 1 to 7, characterized in that: The concrete foundation (12) comprises a steel cage and concrete poured into the steel cage, wherein the steel cage is located at the outer periphery of the steel pipe pile (11) and is welded to the steel pipe pile (11).

9. The fence for use in salt lake areas according to claim 8, characterized in that: The height ratio of the steel pipe pile (11) to the steel cage is greater than or equal to 4 and less than or equal to 6.

10. The fence for use in salt lake areas according to any one of claims 1 to 7, characterized in that: The fence for the salt lake area further comprises a connecting plate welded to the steel pipe pile (11), the connecting plate being located on a side of the steel pipe pile (11) facing the support column (20), a plurality of bolts being welded to the connecting plate, and a plurality of threaded holes being threadably matched with the plurality of bolts being provided on the support column (20).