A semi-automatic steel bar processing frame for large cantilever cap beam
By designing a semi-automated steel bar processing tire frame for large cantilever cover beams, the precise positioning and processing of steel bar frame sheets of the cover beams is achieved by using mold frames and positioning components, the quality, progress and safety issues in the steel bar processing process are solved, production efficiency and quality are improved, and high-altitude operation time and safety risks are reduced.
Patent Information
- Application Number
- CN202420656170.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The steel bar processing technology of large cantilever cover beams has problems such as high quality requirements, long time consumption and great safety risks, which affect construction quality, progress and production safety.
A semi-automated steel bar processing tire frame of a large cantilever cover beam is designed, including a bottom mold frame, a fixed end side mold frame, a mobile end side mold frame and an end limit mold frame to form an open top working area, and use components such as the lifting mechanism, a bull leg limit baffle, a transverse support rod and a positioning tooth plate to achieve the precise positioning and processing of the steel bar frame sheet of the cover beam.
It improves the production efficiency and quality of semi-finished steel cages, shortens the construction progress, reduces the duration of high-altitude operations, and reduces safety risks.
Smart Images

Figure CN222725368U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cap beam reinforcement processing, in particular to a semi-automatic reinforcement processing frame for a large cantilever cap beam. Background Art
[0002] Since the beginning of the 21st century, my country has entered an era of infrastructure mania, and the transportation industry has developed rapidly. As an extremely important part of the transportation system, bridge engineering, the construction and operation of bridges play a very important role in economic development and people's livelihood construction. Bridge engineering consists of multiple parts, among which the construction of the cap beam is an especially important part, and its construction quality will directly affect the final quality of bridge construction. As an important cap beam structure, the large cantilever prestressed cap beam has a complex structure, high construction quality and safety requirements. At the same time, due to its cumbersome construction process, it has a certain degree of impact on the construction period and quality. In particular, the processing technology of the cap beam steel bar, because there are many equipment and materials required for erection and fixing in the production process, the engineering volume is large, the process is complicated, and it is an aerial operation, so the entire production process has the three characteristics of high quality requirements, long time consumption, and high safety risks. Therefore, this process directly restricts the construction quality, progress, and safe production of the large cantilever cap beam, and also indirectly affects the completion period of the bridge. Utility Model Content
[0003] In order to solve the above technical problems, the utility model provides a semi-automatic steel bar processing frame for a large cantilever cap beam, which can improve production efficiency and quality and also reduce the duration of high-altitude operations.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0005] A semi-automatic steel bar processing frame for a large cantilever cap beam comprises a bottom mold frame, and a fixed end side mold frame and a movable end side mold frame arranged in parallel on both sides of the bottom mold frame, one end of the fixed end side mold frame is provided with an end stop mold frame close to the movable end side mold frame to form an open top working area, the end stop mold frame and the fixed end side mold frame are provided with a fixed working platform which is mutually connected and used for workers to pass, and a working platform step ladder is also provided at a position away from the working area for workers to enter the fixed working platform;
[0006] A lifting mechanism is provided on the mobile end side formwork, and a corbel limit baffle located above the working area is provided on the top of the lifting mechanism. A transverse support rod for placing the cap beam reinforcement skeleton plate is provided on the corbel limit baffle. A mobile working platform is also provided on the side of the mobile end side formwork close to the working area;
[0007] A distribution beam is provided on the top of the bottom formwork, and the distribution beam is located at a position far away from the end limit formwork, and the distribution beam is provided with a pier column steel bar reservation device and a main steel bar positioning tooth plate in sequence along the direction away from the end limit formwork;
[0008] The fixed end side formwork is provided with a stirrup positioning tooth plate on the side close to the working area, and the top of the fixed end side formwork is equipped with a cantilever storage crane for placing welding equipment;
[0009] Specifically, the cantilever storage crane has a welding equipment placement area and a tool placement area.
[0010] Specifically, the pier column reinforcement pre-reserved device and the main reinforcement positioning tooth plate are provided with a plurality of positioning grooves for the main reinforcement and the assembly pier column reinforcement to pass through.
[0011] Preferably, the fixed end side mold frame and the cantilever storage crane are connected by a slide rail.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] The utility model discloses the utility model has a simple structure, is easy to use, utilizes the bottom formwork, fixed end side formwork, movable end side formwork and end limit formwork to cooperate with each other to form an operation area for the production of cap beam reinforcement cage, the operation area has a good processing environment, realizes the transition from on-site one-by-one binding mode to factory integrated production mode, greatly improves the production quality and processing accuracy, speeds up the construction progress, and at the same time reduces the time that construction personnel are working at height, greatly reduces the safety risk. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a side view structural schematic diagram of the utility model;
[0015] Figure 2 It is a three-dimensional schematic diagram of the utility model.
[0016] Figure identification: 1. Bottom formwork, 2. Fixed end side formwork, 3. Mobile end side formwork, 4. End limit formwork, 5. Fixed working platform, 6. Working platform step ladder, 31. Lifting mechanism, 32. Corbel limit baffle, 33. Horizontal support rod, 34. Mobile working platform, 11. Pier column steel bar reserved device, 12. Main steel bar positioning tooth plate, 8. Slide rail, 71. Welding equipment placement area, 72. Tool placement area. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation manner of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model.
[0018] Example 1
[0019] like Figure 1-2 The semi-automatic steel bar processing frame of a large cantilever cap beam shown in the figure can improve the production efficiency and quality of the semi-finished steel bar cage of the cap beam, which includes a bottom mold frame 1, and a fixed end side mold frame 2 and a movable end side mold frame 3 arranged in parallel on the bottom mold frame 1, one end of the fixed end side mold frame 2 is provided with an end limit mold frame 4 close to the movable end side mold frame 3 to form an open top working area, the end limit mold frame 4 and the fixed end side mold frame 2 are provided with a fixed working platform 5 that is mutually connected and used for workers to pass through, and when avoiding the working area, the end limit mold frame 4 and the fixed end side mold frame 2 are provided with a fixed working platform 5 that is mutually connected and used for workers to pass through. The working area is also provided with a working platform step ladder 6 for workers to enter the fixed working platform 5; a jacking mechanism 31 is provided on the mobile end side formwork 3, and a corbel limit baffle 32 located above the working area is provided on the top of the jacking mechanism 31, and a transverse support rod 33 for placing the cap beam reinforcement skeleton piece is provided on the corbel limit baffle 32. During the construction process, the height of the transverse support rod 33 can be raised and lowered by controlling the jacking mechanism 31, which is convenient for lifting out the semi-finished cap beam reinforcement cage, reducing the lifting height of the truss crane, and improving work efficiency. The labor cost is reduced to a certain extent; the mobile end side formwork 3 is also provided with a mobile working platform 34 on the side close to the working area, and the position of the mobile end side formwork 3 is adjusted to cooperate with the main reinforcement positioning tooth plate 12 on the bottom formwork 1 to realize the accurate positioning and pre-fixation of the cap beam reinforcement skeleton piece; the top of the bottom formwork 1 is provided with a distribution beam, and the distribution beam is located at a position away from the end limit formwork 4, and the distribution beam is sequentially provided with a pier column reinforcement reservation device 11 and a main reinforcement positioning tooth plate 12 in the direction away from the end limit formwork 4. Specifically, Both the pier column reinforcement pre-reserved device 11 and the main reinforcement positioning tooth plate 12 have multiple positioning grooves for the main reinforcement and assembled pier column reinforcement to pass through. The positioning grooves are used to accurately locate the main reinforcement, stirrups and prestressed pipe positions of the cap beam to avoid conflicts with the position of the pier column main reinforcement during overall lifting, which greatly improves the processing accuracy of the semi-finished product of the cap beam reinforcement cage and the on-site lifting efficiency; the fixed end side formwork 2 is provided with a stirrup positioning tooth plate 21 on the side close to the working area, and the top of the fixed end side formwork 2 is equipped with a cantilever storage crane 7 for placing welding equipment.
[0020] During implementation, first, the cap beam reinforcement skeleton plate placed in the working area is lifted up by controlling the jacking mechanism 31 using the transverse support rod 33, and then the mobile end side formwork 3 is adjusted to cooperate with the main reinforcement positioning tooth plate 12 on the bottom formwork 1 to accurately position and pre-fix the cap beam reinforcement skeleton plate, and the stirrup positioning tooth plate 21 on the fixed end side formwork 2 is used to accurately position and fix the stirrups, and then the main reinforcement positioning tooth plate 12 on the bottom formwork 1, the pier column reinforcement reservation device 11 and the stirrup positioning tooth plate 21 on the fixed end side formwork 2 are used to perform the accurate positioning and laying of the cap beam main reinforcement and the subsequent sleeve connection work, and finally, with the assistance of the fixed working platform 5 and the mobile working platform 34, all the steel sleeve connections, welding and binding are completed to obtain the cap beam reinforcement cage. After the construction of the semi-finished cap beam reinforcement cage is completed, the height of the transverse support rod 32 is lowered by controlling the jacking mechanism. The semi-finished cap beam reinforcement cage with a lowered height is convenient for the truss crane to take out, and the lifting height of the truss crane is also reduced, thereby reducing the height requirement for the reinforcement yard construction, directly reducing the construction cost of the reinforcement processing yard, and shortening the construction period of the reinforcement yard. The entire operation process is mostly carried out on the fixed working platform 5 and the mobile working platform 34, which can reduce the long-term high-altitude operation of construction personnel and thus reduce safety risks.
[0021] As a preferred solution of the above embodiment, the fixed end side mold frame 2 is connected to the cantilever storage crane 7 via a slide rail 8, which is convenient for moving the cantilever storage crane 7 and further facilitates the welding operation.
[0022] As a preferred solution of the above embodiment, the cantilever storage crane 7 has a welding equipment placement area 71 and a tool placement area 72 .
[0023] Of course, the present invention may have many other implementation modes. Without departing from the spirit and essence of the present invention, technicians familiar with the field may make various corresponding changes and deformations based on the present invention, but these corresponding changes and deformations should all fall within the scope of protection of the claims attached to the present invention.
Claims
1. A semi-automatic steel bar processing frame for a large cantilever cap beam, characterized in that: The invention comprises a bottom mold frame (1), and a fixed end mold frame (2) and a movable end mold frame (3) arranged in parallel on both sides of the bottom mold frame (1); one end of the fixed end mold frame (2) is provided with an end stop mold frame (4) close to the movable end mold frame (3) to form an open top operation area; the end stop mold frame (4) and the fixed end mold frame (2) are provided with a fixed operation platform (5) which is mutually connected and used for operators to pass through; and an operation platform step ladder (6) is provided in a position away from the operation area for operators to enter the fixed operation platform (5); The movable end side formwork (3) is provided with a jacking mechanism (31), the top end of the jacking mechanism (31) is provided with a corbel limit baffle (32) located above the working area, the corbel limit baffle (32) is provided with a transverse support rod (33) for placing a cap beam steel bar skeleton sheet, and the movable end side formwork (3) is also provided with a movable working platform (34) on a side close to the working area; The top of the bottom formwork (1) is provided with a distribution beam, and the distribution beam is located at a position away from the end limit formwork (4), and the distribution beam is provided with a pier column steel bar reservation device (11) and a main steel bar positioning tooth plate (12) in sequence along the direction away from the end limit formwork (4); The fixed end side formwork (2) is provided with a stirrup positioning tooth plate (21) on the side close to the working area, and the top of the fixed end side formwork (2) is equipped with a cantilever storage crane (7) for placing welding equipment.
2. The semi-automatic steel bar processing frame for large cantilever cap beams according to claim 1 is characterized in that: The fixed end side mold frame (2) and the cantilever type storage crane (7) are connected via a slide rail (8).
3. The semi-automatic steel bar processing frame for large cantilever cap beams according to claim 2 is characterized in that: The cantilever storage crane (7) has a welding equipment placement area (71) and a tool placement area (72).
4. The semi-automatic steel bar processing frame for large cantilever cap beams according to claim 1 is characterized in that: The pier column reinforcement pre-reserved device (11) and the main reinforcement positioning tooth plate (12) are both provided with a plurality of positioning grooves for the main reinforcement and the assembly pier column reinforcement to pass through.