A storage and transportation device for the prefabricated rail-top air duct hanging wall of a subway station
By designing a prefabricated rail air duct hanging wall transportation device including a rectangular frame and protective measures, the problem of prefabricated rail air duct hanging wall is solved, and efficient and safe transportation is achieved and construction quality is improved.
Patent Information
- Application Number
- CN202421385432.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-06-18
AI Technical Summary
During the construction of internal structures such as air ducts in subway stations, prefabricated rail air duct hanging walls are prone to overturning and instability during storage and transportation, resulting in bumps and cracks, and the inability to meet the entry acceptance standards.
A rectangular frame structure including transverse steel beams, longitudinal steel beams, oblique steel beams, vertical steel columns and steel plates was designed. By welding triangular steel plates and suspending rings, stability and bearing capacity are increased, and "L"-shaped notches are cut on the steel plate to place round tubes, combining soft rubber or soft plastic leather to protect the suspended wall.
It realizes efficient and safe storage of the upper air duct hanging wall of the transportation prefabricated rail, avoids damage to individual components during transportation, improves the entry qualification rate, and thus improves the project quality and construction speed.
Smart Images

Figure CN222728663U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of rail top air duct construction, in particular to a hanging wall storage and transportation device for prefabricated rail top air ducts in subway stations. Background Art
[0002] With the continuous development of building industrialization technology, prefabricated building construction technology has become increasingly mature and widely used in the field of rail transit engineering. The use of prefabricated construction technology for subway construction and the realization of on-site assembly prefabrication can comprehensively improve the quality of the project, speed up the construction speed, reduce the impact on urban ground traffic, and meet the requirements of high efficiency and environmental protection of urban underground projects. However, in the construction process of internal structures such as subway station air ducts, prefabricated technology is rarely used and is currently in the development stage. A set of prefabricated track top air ducts consists of two hanging walls and a duct board. All components are prefabricated in the factory and transported to the site. At present, during the storage and transportation of the prefabricated track top air duct hanging wall, due to the large volume and mass of a single component, it is easy to overturn and become unstable, resulting in the collision and cracking of the prefabricated track top air duct hanging wall, which cannot meet the on-site acceptance standards. Summary of the invention
[0003] The utility model aims to solve the deficiencies of the prior art and provides a storage and transportation device for a prefabricated rail-top air duct hanging wall in a subway station.
[0004] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
[0005] A storage and transportation device for a prefabricated rail-top duct hanging wall of a subway station comprises transverse steel beams, longitudinal steel beams, oblique steel beams, vertical steel columns and steel plates. Four of the fourteen vertical steel columns are corner columns and are distributed in a rectangular shape. Six transverse steel beams and ten longitudinal steel beams cooperate with the vertical steel columns to form an upper and lower rectangular frame. The six transverse steel beams are respectively arranged on both sides, the middle of the bottom and both sides of the top of the rectangular frame. The ten longitudinal steel beams are divided into upper and lower layers and are correspondingly connected to the transverse steel beams. Four oblique steel beams form two groups of scissor braces and are fixed on the rectangular frame. The steel plates are arranged on the upper and lower transverse steel beams of the rectangular frame. Two "L"-shaped notches are cut on each steel plate, and a round tube is placed in each notch.
[0006] "L"-shaped notches are symmetrically cut on both sides of the steel plates, a rubber ring or a winding tape is sleeved on the round tube, and the round tube is inserted into the notches of the two corresponding steel plates.
[0007] The two groups of scissor braces composed of the oblique steel beams are placed under the second and fourth longitudinal steel beams of the upper layer and connected to the second and fourth longitudinal steel beams of the lower layer.
[0008] The transverse steel beams, longitudinal steel beams, oblique steel beams and vertical steel columns are all made of channel steel.
[0009] A triangular steel plate is welded at the connection between the vertical steel column, the transverse steel beam and the longitudinal steel beam.
[0010] The second and fourth vertical steel columns on the transverse outer side of the rectangular frame are welded with hanging rings on their tops.
[0011] A layer of soft rubber or soft plastic skin is adhered to the contact surfaces of the transverse steel beam and the longitudinal steel beam with the prefabricated track top air duct hanging wall.
[0012] The beneficial effects of the utility model are as follows: the utility model has a simple structure and is practical. The device can be used to efficiently and safely store and transport prefabricated track-top air duct hanging walls, thereby solving the problem that the single components of the prefabricated track-top air duct hanging walls are large in volume and mass, and the use of conventional platforms may cause damage to the stored and transported components. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a top view of the utility model;
[0014] Figure 2 It is the front view of the utility model;
[0015] Figure 3 It is a left view of the utility model;
[0016] In the figure: 1- horizontal steel beam; 2- longitudinal steel beam; 3- oblique steel beam; 4- vertical steel column; 5- steel plate; 6- notch; 7- round tube; 8- triangular steel plate; 9- lifting ring.
[0017] The following is a detailed description of the embodiments of the present invention with reference to the accompanying drawings. DETAILED DESCRIPTION
[0018] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0019] like Figure 1-Figure 3As shown, a storage and transportation device for a prefabricated rail top air duct hanging wall of a subway station comprises a transverse steel beam 1, a longitudinal steel beam 2, an oblique steel beam 3, a vertical steel column 4 and a steel plate 5. Four of the fourteen vertical steel columns 4 are corner columns, which are distributed in a rectangular shape. The height of the vertical steel column 4 is set according to the height of the prefabricated rail top air duct hanging wall. Six transverse steel beams 1 and ten longitudinal steel beams 2 cooperate with the vertical steel column 4 to form a rectangular frame with upper and lower layers. The six transverse steel beams 1 are respectively arranged on both sides, the middle of the bottom and both sides of the top of the rectangular frame. The transverse steel beams on both sides of the bottom 1 is set according to the width of the prefabricated track top air duct, ten longitudinal steel beams 2 are divided into upper and lower layers and connected to the transverse steel beam 1 accordingly, there are five longitudinal steel beams 2 on the top, two prefabricated track top air duct hanging walls can be placed between every two longitudinal steel beams 2, four oblique steel beams 3 form two groups of scissors struts fixed on the rectangular frame, steel plates 5 are set on the upper and lower layers of transverse steel beams 1 of the rectangular frame, two "L"-shaped notches 6 are cut on each steel plate 5, and a round tube 7 is placed in each notch 6. This device can store and transport eight hanging walls at a time.
[0020] The steel plates 5 have "L"-shaped notches 6 symmetrically cut on both sides, and the round tube 7 is sleeved with a rubber ring or wrapped with tape to prevent the round tube 7 from loosening and popping out of the notch 6 during transportation. The round tube 7 is inserted into the notches 6 of the two corresponding steel plates 5.
[0021] The two groups of scissor braces composed of the oblique steel beams 3 are placed under the second and fourth upper longitudinal steel beams 2 and connected to the second and fourth lower longitudinal steel beams 2 to increase the stability of the device.
[0022] The transverse steel beam 1, the longitudinal steel beam 2, the oblique steel beam 3 and the vertical steel column 4 are all made of channel steel.
[0023] A triangular steel plate 8 is welded at the connection between the vertical steel column 4 and the transverse steel beam 1 and the longitudinal steel beam 2. The triangular steel plate 8 and the transverse steel beam 1 and the longitudinal steel beam 2 are welded into a whole, which increases the stability of the device, makes the device safer and more stable, and greatly improves the bearing capacity.
[0024] The second and fourth vertical steel columns 4 on the transverse outer side of the rectangular frame are welded with lifting rings 9 on their tops, and the lifting device on the lifting device is connected to the lifting rings 9 to lift the entire device together with eight prefabricated rail-top air duct hanging walls and place them on a transport vehicle.
[0025] A layer of soft rubber or soft plastic skin is adhered to the contact surface between the transverse steel beam 1 and the longitudinal steel beam 2 and the prefabricated rail top air duct hanging wall to prevent the integrity of the components from being damaged by collision.
[0026] When the utility model is working, the device is placed on a flat site, and the prefabricated rail top air duct hanging wall processed in advance in the factory is lifted by the lifting device one piece of the prefabricated rail top air duct hanging wall at a time, and the longitudinal steel beam 2 of the heavy rain cloth is lowered and falls on the transverse steel beam 1 in the middle of the bottom, and the prepared φ30 round tube 7 is placed on the notch 6 of the steel plate 5, and one side of the hanging wall is tightly attached to the soft rubber or soft plastic skin of the device, and the gap between the round tube 7 and the hanging wall on the other side is fixed with two wedge-shaped square woods to ensure that the hanging wall will not shake during transportation. Repeat this process to complete the placement of eight prefabricated rail top air duct hanging walls, and the sling on the lifting device is connected to the lifting ring 9, and the whole device together with the eight prefabricated rail top air duct hanging walls are lifted at the same time and placed on the transport vehicle, which reduces the collision and extrusion of components during transportation, improves the qualified rate of entering the site, and then improves the engineering quality and construction speed of the prefabricated rail top air duct, achieving a win-win effect for both parties.
[0027] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0029] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] The utility model is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the utility model is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the utility model, or are directly applied to other occasions without improvement, they are all within the protection scope of the utility model.
Claims
1. A storage and transportation device for a prefabricated rail-top duct hanging wall in a subway station, characterized in that: The invention comprises a transverse steel beam (1), a longitudinal steel beam (2), an oblique steel beam (3), a vertical steel column (4) and a steel plate (5). Four of the fourteen vertical steel columns (4) are corner columns and are arranged in a rectangular shape. Six transverse steel beams (1) and ten longitudinal steel beams (2) cooperate with the vertical steel columns (4) to form a rectangular frame of upper and lower layers. The six transverse steel beams (1) are respectively arranged on the two sides, the middle of the bottom and the two sides of the top of the rectangular frame. The ten longitudinal steel beams (2) are divided into upper and lower layers and are connected to the transverse steel beams (1) accordingly. The four oblique steel beams (3) form two groups of scissor braces and are fixed on the rectangular frame. The steel plate (5) is arranged on the upper and lower transverse steel beams (1) of the rectangular frame. Two "L"-shaped notches (6) are cut on each steel plate (5), and a round tube (7) is placed in each notch (6).
2. The storage and transportation device for the prefabricated rail top duct hanging wall of a subway station according to claim 1 is characterized in that: The steel plates (5) are symmetrically cut with "L"-shaped notches (6) on both sides, a rubber ring or a wrapping tape is sleeved on the round tube (7), and the round tube (7) is inserted into the notches (6) of the two corresponding steel plates (5).
3. The storage and transportation device for the prefabricated rail top wind duct hanging wall of a subway station according to claim 2, characterized in that: The two groups of scissor braces composed of the oblique steel beams (3) are placed below the second and fourth longitudinal steel beams (2) of the upper layer, and connected to the second and fourth longitudinal steel beams (2) of the lower layer.
4. The storage and transportation device for the prefabricated rail top duct hanging wall of a subway station according to claim 3 is characterized in that: The transverse steel beam (1), the longitudinal steel beam (2), the oblique steel beam (3) and the vertical steel column (4) are all made of channel steel.
5. The storage and transportation device for the prefabricated rail top wind duct hanging wall of a subway station according to claim 4, characterized in that: A triangular steel plate (8) is welded at the connection between the vertical steel column (4) and the transverse steel beam (1) and the longitudinal steel beam (2).
6. The storage and transportation device for the prefabricated rail top wind duct hanging wall of a subway station according to claim 5, characterized in that: The second and fourth vertical steel columns (4) on the transverse outer sides of the rectangular frame are welded with hanging rings (9) on their tops.
7. The storage and transportation device for the prefabricated rail top wind duct hanging wall of a subway station according to claim 6, characterized in that: A layer of soft rubber or soft plastic skin is adhered to the contact surface between the transverse steel beam (1) and the longitudinal steel beam (2) and the prefabricated track top air duct hanging wall.