A pre-assembled system of water tank inverter integrated machine concrete platform
Through the pre-assembled concrete construction plan, the pre-assembly of pile foundation assembly, support assembly and operation and maintenance platform board is adopted to solve the problem of difficult and high cost in construction of offshore photovoltaic projects, the stability and reliability of concrete platforms are achieved, the operation and maintenance costs are reduced, and the standardized and modular construction model is provided for offshore photovoltaic projects.
Patent Information
- Application Number
- CN202421443044.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-22
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2034-06-22
AI Technical Summary
Due to the influence of the complex marine environment, the construction of offshore photovoltaic projects is difficult, costly, and slow construction progress. The platform has stability and reliability problems in terms of resistance to waves, sea ice, cold waves, and salt spray.
A concrete pre-assembled construction plan is adopted to form a stable concrete platform through the pre-assembly of pile foundation assembly, support assembly and operation and maintenance platform plate to ensure the stability and reliability of the platform.
It solves the problems of high construction difficulties, high costs and slow construction progress caused by large-scale pouring of concrete on site, ensures the stability and reliability of the concrete platform, reduces operation and maintenance costs, and provides a standardized, modular and industrialized construction model for offshore photovoltaic projects.
Smart Images

Figure CN222730497U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembling an integrated inverter machine for a water tank, in particular to a concrete platform pre-assembled system for an integrated inverter machine for a water tank. Background Art
[0002] As large-scale onshore photovoltaic projects require a large amount of land area and land resources, and as the photovoltaic land use policy has become increasingly tightened in the past two years, more and more power station developers and component manufacturers have turned their attention to offshore photovoltaic projects. Under the same lighting conditions, due to the advantages of open sea surface, no obstructions, long sunshine time, and high radiation, offshore photovoltaic projects have higher light utilization efficiency. Compared with onshore photovoltaic power stations, offshore photovoltaic power stations have significantly increased their power generation.
[0003] Given that water and offshore photovoltaics are still in their infancy, there is a relative lack of standards in terms of engineering design, construction, operation and maintenance, and there is no successful experience to draw on. In the actual process of advancement, the difficulty of project implementation is much greater than expected. In particular, the construction of offshore photovoltaic projects, due to the influence of the complex marine environment, requires, on the one hand, to reduce the difficulty of construction and the difficulty and cost of operation and maintenance, while taking into account efficiency and energy saving; on the other hand, it also requires breakthroughs in key technical directions such as wave resistance, sea ice resistance, cold wave resistance, and salt spray resistance. It not only ensures that the offshore photovoltaic project platform under construction has good corrosion resistance and can effectively maintain stability and reliability after frequent impacts of waves, floating ice, etc., but also meets the design and construction requirements in terms of cold wave resistance, sea fog and corrosion resistance. Utility Model Content
[0004] The utility model provides a pre-assembled system of a water tank inverter integrated machine concrete platform, which adopts a concrete pre-assembled construction scheme, which can not only solve the problems of great construction difficulty, high cost and slow construction progress caused by pouring a large amount of concrete on site, but also ensure that the built concrete platform has good stability and reliability. In addition, compared with the steel structure platform, the concrete platform built based on this patent scheme can be more durable and reliable in humid and corrosive environments such as water surfaces, tidal flats, and swamps, and the operation and maintenance cost is lower.
[0005] The technical solution adopted by the utility model to solve the technical problem is: a pre-assembled system of a concrete platform of an above-water tank inverter integrated machine, comprising a pile foundation assembly, a support assembly and a plurality of operation and maintenance platform plates.
[0006] The pile foundation assembly comprises a plurality of hollow square piles, a plurality of transverse connecting rods and a plurality of longitudinal connecting rods. The hollow square piles are arranged in two rows facing each other, and the plurality of hollow square piles in each row are evenly arranged in a longitudinal direction.
[0007] The transverse connecting rod is connected between two hollow square piles that are opposite to each other in the front and rear, and the longitudinal connecting rod is connected between two hollow square piles that are adjacent to each other in the left and right.
[0008] The support assembly includes at least one pair of support beams arranged front and back oppositely, and a support frame fixed to the periphery of the support beams. The inner side surface of the support frame is formed with a straight groove in a U shape with the notch facing the front side or the rear side.
[0009] At the lower part of the support beam, a plurality of piles are formed along the longitudinal direction and can be matched with the upper ends of the hollow square piles in each row. The piles can be inserted into the upper ports of the hollow square piles. A plurality of prefabricated threaded holes are arranged on the support beam and are distributed alternately in the longitudinal direction.
[0010] A plurality of connecting rods extending transversely are arranged between the two supporting beams and are distributed alternately in the longitudinal direction, so that the supporting assembly is formed into a frame beam structure.
[0011] One end of the operation and maintenance platform plate is inserted into the U-shaped groove on the support frame.
[0012] On the operation and maintenance platform plate, an assembly through hole corresponding to the prefabricated threaded hole is provided near the other end thereof, and a connecting stud is arranged between the prefabricated threaded hole and the assembly through hole to fix the other end of the operation and maintenance platform plate to the support beam.
[0013] After the pile foundation assembly is processed in a workshop or factory, it is necessary to carry out epoxy coating anti-corrosion construction coating treatment on the entire outer surface and inner surface of the pile foundation assembly, and the epoxy anti-corrosion coating is coated on the surface of the pile foundation assembly.
[0014] After the support assembly or the concrete platform formed by the support assembly is assembled with the pile foundation assembly and the relative positions between the two are adjusted, concrete is injected into the cavity of the hollow square pile to connect the hollow square pile with the pile column as a whole. After the concrete injected into the hollow square pile is set, the pile foundation assembly can be connected with the support assembly to form a solid whole.
[0015] Optionally, a plurality of embedded parts which are longitudinally spaced apart are provided on the support beam, and a longitudinal interval is maintained between the set position of the prefabricated threaded hole and the fixed position of the embedded part.
[0016] The embedded part extends downward and forms a pair of arm plates facing each other front and back, and through holes for bolts to pass through are arranged at the ends of the pair of arm plates. Nuts are matched at the ends of the screw rods of the bolts, and the ends of the pair of arm plates can be connected into one piece by means of the bolts and the nuts. The longitudinal connecting rod is inserted between the pair of arm plates, and the bolts are relatively located below the longitudinal connecting rods.
[0017] By means of the matching structure between the embedded parts and the longitudinal connecting rod, the support assembly can be fixedly connected to the upper part of the pile foundation assembly to complete the pre-assembly. After adjusting the position of the support assembly relative to the pile foundation assembly, tightening the bolts and nuts provided at the lower part of the arm plate can establish a relatively fixed connection structure between the pile foundation assembly and the support assembly. Then, concrete is injected into the cavity of the hollow square pile to connect the hollow square pile with the pile column as a whole. After the concrete injected into the hollow square pile is set, the pile foundation assembly can be connected with the support assembly to form a whole.
[0018] After the connection and assembly of the support assembly is completed in the workshop or factory, the support assembly can be poured with concrete to form a concrete platform. The prefabricated threaded holes and the lower part of the embedded parts should be prevented from being blocked or wrapped inside by concrete. The surface of the support assembly exposed outside the concrete needs to be coated with epoxy coating for anti-corrosion construction.
[0019] Optionally, the pile foundation assembly further includes a plurality of tie rods and pin shaft portions corresponding to and matching the ends of the tie rods.
[0020] The pull rods are arranged in pairs and in an X-shaped cross arrangement. One end of the pin rod of the pin shaft portion is formed as a pivot end, and the other end is formed as an external thread section and matched with a nut.
[0021] Four pin shafts are arranged on the upper part of the hollow square pile, so that the pin shaft axes of two of the pin shafts extend in the front-rear direction and are arranged alternately up and down, and the pin shaft axes of the other two pin shafts extend in the longitudinal direction and are arranged alternately up and down.
[0022] A pair of pull rods are arranged between two front and rear opposite hollow square piles, and the two ends of the pull rods are respectively hingedly matched with the pivot ends of two transversely arranged pin shaft parts which are arranged obliquely upward and obliquely downward on the upper parts of the two hollow square piles.
[0023] Starting from one end in the longitudinal direction, a pair of pull rods are arranged between each two adjacent hollow square piles, and the two ends of the pull rods are respectively hingedly matched with the pivot ends of two longitudinally arranged pin shaft parts which are arranged obliquely upward and obliquely downward on the upper parts of the two hollow square piles.
[0024] Screwing the nut on the external threaded section of the pin rod can pull the end of the pull rod hinged on the pivot end in the horizontal or longitudinal direction to level and stabilize the upper end surface of the hollow square pile, and can form prestress between the two hollow square piles, which helps to enhance the impact resistance of the pile foundation assembly and promote the stability and reliability of the pile foundation.
[0025] Optionally, the longitudinal link includes a first longitudinal link and a second longitudinal link.
[0026] The two ends of the second longitudinal connecting rod are hinged on two pivot ends corresponding to and matching the lower ends of a pair of pull rods arranged on two hollow square piles.
[0027] Two ends of the first longitudinal connecting rod are connected between two of the hollow square piles located between two adjacent second longitudinal connecting rods.
[0028] The beneficial effects of the utility model are as follows: the concrete platform pre-assembled system involved in the patent scheme is a concrete platform that is constructed in a pre-assembled manner to fix and support the water tank inverter integrated machine. It can not only solve the problems of difficulty, high cost and slow construction progress caused by pouring a large amount of concrete on site, but also the built concrete platform is more durable and reliable than the steel structure platform in humid and corrosive environments such as water surfaces, mudflats and swamps, and the operation and maintenance cost is lower. In addition, this pre-assembled system of the concrete platform of the water tank inverter integrated machine is conducive to the standardization, modularization, industrialization and mechanization of offshore photovoltaic construction projects, and can provide an efficient, controllable, standard, energy-saving, environmentally friendly and economical construction model for the construction of water photovoltaic, offshore photovoltaic and other scenes. This model has a certain foundation significance in engineering technology, construction, operation and maintenance, cost reduction and efficiency improvement, and can play a significant role in promoting the commercialization and scale-up of pile-based fixed water / offshore photovoltaic project construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a top view of the completed concrete platform of the water tank inverter integrated machine.
[0030] Figure 2 It is a schematic diagram of the top view of the structure of the pile foundation assembly and the support assembly.
[0031] Figure 3 It is a top view structural diagram of the pile foundation assembly.
[0032] Figure 4 It is a schematic diagram of the main structure of the pile foundation assembly.
[0033] Figure 5 It is a left view structural schematic diagram of the pile foundation assembly.
[0034] Figure 6 A schematic diagram of the supporting assembly from above.
[0035] Figure 7 Schematic diagram of the connection structure between the operation and maintenance platform plate and the support beam.
[0036] In the picture: 100 is the water tank inverter equipment support area, 200 is the operation and maintenance area;
[0037] 10 pile foundation assembly, 11 hollow square pile, 12 transverse connecting rod, 13 longitudinal connecting rod, 131 first longitudinal connecting rod, 132 second longitudinal connecting rod, 14 tie rod, 15 pin shaft portion;
[0038] 20 support assembly, 21 support beam, 211 plug pile, 212 prefabricated threaded hole, 213 embedded part, 2131 arm plate, 2132 slot, 22 support frame;
[0039] 30: operation and maintenance platform plate, 31: connecting studs. DETAILED DESCRIPTION
[0040] The structures, proportions, sizes, etc. illustrated in the drawings of the specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the utility model, so they have no substantial technical significance. Any modification of the structure, change of the proportion relationship or adjustment of the size, without affecting the effect and purpose that can be achieved by the utility model, should still fall within the scope of the technical content disclosed by the utility model. At the same time, the terms such as "upper", "lower", "front", "back", "middle" and so on quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the utility model. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the utility model without substantial change of the technical content.
[0041] like Figures 1 to 7 The above-water tank inverter-integrated machine concrete platform pre-assembled system (or above-water tank inverter-integrated machine concrete platform pre-assembled structure) shown includes a pile foundation assembly 10, a support assembly 20 and a plurality of operation and maintenance platform plates 30. After pouring concrete on the support assembly 20, it can be formed into a concrete platform, and the central area of the concrete platform becomes the above-water tank inverter-integrated machine equipment support area 100, which is mainly used to fix and install the above-water tank inverter-integrated machine equipment. On the front and rear sides of the above-water tank inverter-integrated machine equipment support area 100, an operation and maintenance inspection area 200 formed by laying the operation and maintenance platform plates 30 is formed. The operation and maintenance platform plates 30 can be selected as precast concrete plates.
[0042] The pile foundation assembly 10 includes a plurality of hollow square piles 11, a plurality of transverse connecting rods 12 and a plurality of longitudinal connecting rods 13. The hollow square piles 11 are arranged in two rows facing each other, and the plurality of hollow square piles 11 in each row are evenly arranged in the longitudinal direction. The transverse connecting rod 12 is connected between the two hollow square piles 11 facing each other. Figure 5 The longitudinal connecting rod 13 is connected between two adjacent hollow square piles 11 on the left and right, see Figures 2 to 4 shown.
[0043] The support assembly 20 includes a pair of support beams 21 arranged opposite to each other in front and back, and a support frame 22 fixed to the periphery of the support beams 21. A straight groove in a U shape with a notch facing the front side or the rear side is formed on the inner side surface (the front side surface or the rear side surface) of the support frame 22.
[0044] At the lower part of the support beam 21, a plurality of piles 211 are formed along the longitudinal direction and can be matched with the upper ends of the hollow square piles 11 in each row. The piles 211 can be inserted into the upper ports of the hollow square piles 11. A plurality of prefabricated threaded holes 212 are arranged in a longitudinally spaced manner on the support beam 21. At the same time, a plurality of embedded parts 213 are arranged in a longitudinally spaced manner on the support beam 21, and a longitudinal interval is maintained between the set positions of the prefabricated threaded holes 212 and the fixed positions of the embedded parts 213.
[0045] A plurality of connecting rods (not shown in the figure) extending transversely are provided between the two support beams 21 and are distributed alternately in the longitudinal direction, so that the support assembly forms a frame beam structure.
[0046] One end of the operation and maintenance platform plate 30 is inserted into the U-shaped groove on the support frame 22 .
[0047] On the operation and maintenance platform plate 30, an assembly through hole corresponding to the prefabricated threaded hole 212 is provided near the other end thereof, and a connecting stud 31 is arranged between the prefabricated threaded hole and the assembly through hole to fix the other end of the operation and maintenance platform plate 30 to the support beam 21.
[0048] After the pile foundation assembly 10 is processed in a workshop or factory, it is necessary to perform an epoxy coating anti-corrosion construction coating treatment on the surface of the pile foundation assembly 10 , and an epoxy anti-corrosion coating is coated on the surface of the pile foundation assembly 10 .
[0049] After the support assembly 20 (or the concrete platform formed by the support assembly 20) and the pile foundation assembly 10 are assembled and the relative positions between the two are adjusted, concrete is injected into the cavity of the hollow square pile 11, and the hollow square pile 11 can be connected as a whole with the pile column 211. After the concrete injected into the hollow square pile 11 is set, the pile foundation assembly 10 and the support assembly 20 can be connected to form a solid whole.
[0050] The embedded part 213 extends downward and is formed with a pair of arm plates 2131 facing each other front and back, and through holes for bolts to pass through are arranged at the ends of the pair of arm plates 2131. Nuts are matched at the ends of the screw rods of the bolts, and the ends of the pair of arm plates 2131 can be connected into one piece by means of the bolts and the nuts, and the lower end of the slot 2132 between the two arm plates 2131 is blocked. The longitudinal connecting rod 13 is inserted between the pair of arm plates 2131 (into the slot 2132), and the bolts are relatively located below the longitudinal connecting rod 13.
[0051] By means of the matching structure between the embedded part 213 and the longitudinal connecting rod 13, the support assembly 20 can be fixedly connected to the upper part of the pile foundation assembly 10 to complete the pre-assembly. After adjusting the position of the support assembly 20 relative to the pile foundation assembly 10, tightening the bolts and nuts provided at the lower part of the arm plate 2131 can establish a relatively fixed connection structure between the pile foundation assembly 10 and the support assembly 20. Then, concrete is injected into the cavity of the hollow square pile 11, so that the hollow square pile 11 and the pile column 211 can be connected as a whole. After the concrete injected into the hollow square pile 11 is set, the pile foundation assembly 10 and the support assembly 20 can be connected as a whole.
[0052] After the connection and assembly of the support assembly 20 is completed in the workshop or factory, the support assembly 20 can be poured with concrete to form the support assembly 20 into a concrete platform. The prefabricated threaded holes 212 and the lower parts of the embedded parts 213 should be prevented from being blocked or wrapped inside by concrete. The surface of the support assembly 20 exposed outside the concrete needs to be coated with epoxy coating for anti-corrosion construction.
[0053] The pile foundation assembly 10 further includes a plurality of tie rods 14 and pin shaft portions 15 corresponding to and matching the ends of the tie rods 14 .
[0054] like Figure 4 , Figure 5 As shown, the pull rods 14 are arranged in pairs in an X-shaped cross arrangement. One end of the pin rod of the pin shaft portion 15 is formed as a pivot end, and the other end is formed as an external thread section and matched with a nut.
[0055] Four pin shafts 15 are provided on the upper part of the hollow square pile 11, and the pin rod axes of two of the pin shafts 15 extend in the front-rear direction and are arranged alternately up and down (such as Figure 5 As shown), the pin axes of the other two pin shaft portions 15 extend in the longitudinal direction and are arranged alternately up and down (as shown Figure 4 shown).
[0056] like Figure 5As shown, a pair of pull rods 14 are provided between two front and rear opposite hollow square piles 11, and the two ends of the pull rods 14 are respectively hingedly matched with the pivot ends of two laterally arranged pin shaft parts 15 which are provided on the upper part of the two hollow square piles 11 and are opposite to each other at an angle upward and downward.
[0057] like Figure 4 As shown, starting from one end in the longitudinal direction, a pair of tie rods 14 are provided between each two adjacent hollow square piles 11, and the two ends of the tie rods 14 are respectively hingedly matched with the pivot ends of two longitudinally arranged pin shaft portions 15 which are provided on the upper part of the two hollow square piles 11 and are opposite to each other at an angle upward and downward.
[0058] By screwing the nut on the external threaded section of the pin rod, the end of the pull rod 14 hinged on the pivot end can be pulled horizontally or longitudinally to level and stabilize the upper end surface of the hollow square pile 11, and prestress can be formed between the two hollow square piles 11, which helps to enhance the impact resistance of the pile foundation assembly 10 and promote the stability and reliability of the pile foundation.
[0059] like Figure 4 As shown, the longitudinal link 13 includes a first longitudinal link 131 and a second longitudinal link 132. The two ends of the second longitudinal link 132 are hinged on two pivot ends corresponding to the lower ends of a pair of pull rods 14 provided on two hollow square piles 11. The two ends of the first longitudinal link 131 are connected between the two adjacent second longitudinal links 132.
[0060] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. The present invention can be improved in many aspects without violating the overall concept, and those familiar with the technology can modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the relevant technical field without departing from the spirit and technical concept disclosed by the present invention should still be covered by the claims of the present invention.
Claims
1. A prefabricated system of a water tank inverter integrated machine concrete platform, characterized by: Includes pile foundation assembly, support assembly and multiple operation and maintenance platform plates; The pile foundation assembly comprises a plurality of hollow square piles, a plurality of transverse connecting rods and a plurality of longitudinal connecting rods; the hollow square piles are arranged to form two rows facing each other, and the plurality of hollow square piles in each row are evenly arranged in a longitudinal direction; the transverse connecting rod is connected between the two hollow square piles facing each other, and the longitudinal connecting rod is connected between the two adjacent hollow square piles on the left and right sides; The support assembly includes at least one pair of support beams arranged front and rear oppositely, and a support frame fixed to the periphery of the support beams; the inner side surface of the support frame is formed with a straight groove in a U shape and opening toward the front side or toward the rear side; At the lower part of the support beam, a plurality of piles are distributed along the longitudinal direction and can be matched with the upper ends of the hollow square piles in each row; the piles can be inserted into the upper ports of the hollow square piles; A plurality of prefabricated threaded holes are arranged on the support beam and are distributed alternately in the longitudinal direction; a plurality of connecting rods extending transversely are arranged between the two support beams and are distributed alternately in the longitudinal direction; One end of the operation and maintenance platform plate is inserted into the U-shaped groove on the support frame; On the operation and maintenance platform plate, an assembly through hole corresponding to the prefabricated threaded hole is provided near the other end thereof; a connecting stud is arranged between the prefabricated threaded hole and the assembly through hole to fix the other end of the operation and maintenance platform plate to the support beam.
2. The prefabricated system of a water tank inverter integrated machine concrete platform according to claim 1, characterized in that: A plurality of embedded parts are also provided on the support beam and are distributed alternately in the longitudinal direction, and a longitudinal interval is maintained between the set position of the prefabricated threaded hole and the fixed position of the embedded part; The embedded part extends downward and forms a pair of arm plates facing each other front and back, and through holes for bolts to pass through are arranged at the ends of the pair of arm plates; nuts are matched at the ends of the screw rods of the bolts, and the ends of the pair of arm plates can be connected by means of the bolts and the nuts; the longitudinal connecting rod is inserted between the pair of arm plates and the bolts are relatively located below the longitudinal connecting rod.
3. A pre-assembled system of a water tank inverter integrated machine concrete platform according to claim 1 or 2, characterized in that: The pile foundation assembly further includes a plurality of tie rods and pin shafts corresponding to and matching the ends of the tie rods; The pull rods are arranged in pairs and in an X-shaped cross arrangement; one end of the pin rod of the pin shaft portion is formed as a pivot end, and the other end is formed as an external thread section and matched with a nut; Four pin shafts are provided on the upper part of the hollow square pile, so that the pin shaft axes of two of the pin shafts extend in the front-rear direction and are arranged alternately up and down, and the pin shaft axes of the other two pin shafts extend in the longitudinal direction and are arranged alternately up and down; A pair of pull rods are provided between two front and rear opposite hollow square piles, and the two ends of the pull rods are respectively hingedly matched with the pivot ends of two transversely arranged pin shaft parts which are arranged obliquely upward and obliquely downward on the upper parts of the two hollow square piles. A pair of tie rods are arranged between each two adjacent hollow square piles from one end in the longitudinal direction, and the two ends of the tie rods are respectively hingedly matched with the pivot ends of two longitudinally arranged pin shaft parts which are arranged obliquely upward and obliquely downward on the upper parts of the two hollow square piles; By screwing the nut arranged on the external threaded section, the pull rod hinged on the pivot end can be pulled in the horizontal direction or in the longitudinal direction to level the upper end surface of the hollow square pile.
4. The prefabricated system of a water tank inverter integrated machine concrete platform according to claim 3 is characterized by: The longitudinal connecting rod comprises a first longitudinal connecting rod and a second longitudinal connecting rod; The two ends of the second longitudinal connecting rod are hinged on two pivot ends corresponding to and matching the lower ends of a pair of pull rods arranged on two hollow square piles; Two ends of the first longitudinal connecting rod are connected between two of the hollow square piles located between two adjacent second longitudinal connecting rods.
5. The prefabricated system of a water tank inverter integrated machine concrete platform according to claim 1 or 2, characterized in that: An epoxy anti-corrosion coating is coated on the surface of the pile foundation assembly.
Citation Information
Cited By
Assembly type photovoltaic box inversion all-in-one machine supporting platform and method
CN120639011A