Power installation pipeline laying device

By designing a power-mounted pipeline laying device including a support frame, laying mechanism, buried mechanism and support mechanism, the problems of low working efficiency, single function and poor pipeline stability in the prior art are solved, and a more efficient and more powerful pipeline laying effect is achieved.

CN222775893UActive Publication Date: 2025-04-18HAINAN WEITE TRANSMISSION & TRANSFORMATION ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421201473.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-04-18
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

The existing power installation pipeline laying device has low working efficiency, single functions, and poor pipeline stability.

Method used

A power installation pipeline laying device including a support frame, a laying mechanism, a burying mechanism and a support mechanism is designed. The laying mechanism consists of mechanical claws, adjustment seats and laying electric push rods. The buried mechanism consists of a buried shovel and a moving component. The support mechanism consists of a support bracket and a rotating member. Control the work of these components through the control keys to achieve rapid laying, burying and supporting functions.

Benefits of technology

It improves the working efficiency of the laying device, enhances functionality, and improves the stability of the pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222775893U_ABST
    Figure CN222775893U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electric power pipeline installation, in particular to an electric power installation pipeline laying device which comprises a supporting frame, control row keys are installed on the surface of the supporting frame, a laying mechanism is arranged in the supporting frame, and the laying mechanism is composed of a laying component and a linear module. The device comprises a supporting frame, a burying mechanism is arranged on one side of the bottom of the supporting frame, a burying shovel and a moving assembly are arranged in the burying mechanism, a bearing mechanism is arranged in the supporting frame, and the bearing mechanism is composed of a bearing frame and a rotating component. According to the laying device, the working efficiency is improved when the laying device is used, the functionality is higher, and the stability of a pipeline is improved when the laying device is used.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power pipeline installation, in particular to a power installation pipeline laying device. Background Art

[0002] With the continuous improvement of living standards, the continuous development of the electric power industry has been further promoted. Now the power transmission process is mostly completed through cables. During the laying of cables, due to the underground soil and cable laying requirements, pipelines will be set up underground to complete the laying of cables in the pipelines. When laying, machinery will be used to dig a laying trench on the ground first, and then the power pipeline will be laid in the trench.

[0003] When laying power installation pipelines, the lifting operation is generally completed by manpower or small cranes. The pipelines are lifted one by one for laying, which is rather cumbersome, thereby reducing the work efficiency when the laying device is used; before laying the pipeline, a laying trench must be dug, and the excavated soil is generally placed on one side of the trench, and the general laying device is not easy to bury the laid power installation pipeline, thereby reducing the functionality of the laying device when in use; the laying device generally clamps the power installation pipeline by mechanical claws, and it is generally clamped on both sides of the pipeline, and it is not easy to support the bottom, thereby reducing the stability of the pipeline when the laying device is in use. Utility Model Content

[0004] The utility model aims to provide a power installation pipeline laying device to solve the problems of low working efficiency, relatively single function and low stability of the pipeline when the laying device is used in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a power installation pipeline laying device, comprising a support frame, a control row of keys are installed on the surface of the support frame, a laying mechanism is arranged inside the support frame, the laying mechanism is composed of a laying component and a linear module, a burying mechanism is arranged on one side of the bottom of the support frame, the burying mechanism includes a burying shovel and a moving component, and a supporting mechanism is arranged inside the support frame, the supporting mechanism is composed of a supporting frame and a rotating member.

[0006] Preferably, a linear module is installed inside the support frame, and the linear module is controlled by a control row of keys. A laying component is provided inside the support frame.

[0007] Preferably, a mechanical claw, an adjustment seat and a laying electric push rod are provided inside the laying component, and an adjustment seat is installed on the surface of the linear module, and the adjustment seat performs reciprocating linear motion through the linear module.

[0008] Preferably, electric push rods are installed on both sides of the adjustment seat surface, the input end of the electric push rods is electrically connected to the output end of the control row key, one end of the electric push rods passes through the adjustment seat and is installed with a mechanical claw, and the mechanical claw is controlled by the control row key.

[0009] Preferably, a burying shovel is provided on one side of the support frame, and a moving component is provided on one side of the burying shovel.

[0010] Preferably, the moving assembly consists of a guide rod and a moving electric push rod, and a moving electric push rod is installed on one side of the bottom of the support frame. The input end of the moving electric push rod is electrically connected to the output end of the control row key, and one end of the moving electric push rod passes through the support frame and is fixedly connected to the surface of the burying shovel.

[0011] Preferably, a guide rod is provided on one side of the bottom of the support frame, the guide rod and the support frame are slidably matched with each other, and one end of the guide rod passes through the support frame and is fixedly connected to the surface of the burying shovel.

[0012] Preferably, one side of the support bracket is respectively arranged on one side of the mechanical claw, the structure of the support bracket is an L-shaped structure, and a rotating component is arranged on the outer side of the support bracket.

[0013] Preferably, the interior of the rotating component includes a servo motor, a rotating rod and a mounting frame, the mounting frames are respectively fixed on one side of the mechanical claw, the surface of the mounting frame is installed with a servo motor, and the input end of the servo motor is electrically connected to the output end of the control key.

[0014] Preferably, a rotating rod is fixed to the output end of the servo motor via a coupling, one end of the rotating rod is rotatably connected to the surface of the servo motor, and the surface of the rotating rod is fixedly connected to the surface of the support bracket.

[0015] Compared with the prior art, the utility model has the following beneficial effects: the power installation pipeline laying device not only improves the working efficiency when the laying device is used, has stronger functionality, but also improves the stability of the pipeline when the laying device is used;

[0016] By providing a laying mechanism, the laying device is pushed to one side of the laid trench, so that the laying trench is located between the support frames, and then the support frames are fixed to the ground by screws. At this time, the power installation pipeline to be laid is placed on one side of the trench, and the excavated soil is placed on the other side of the trench. Then, the control row of keys is operated to control the mechanical claw, the laying electric push rod and the linear module to work. The mechanical claw is driven downward by the laying electric push rod, and the pipeline is clamped by the mechanical claw. Then, the mechanical claw is controlled to rise by the laying electric push rod. At this time, the linear module drives the adjustment seat to make a linear motion, drives the laying electric push rod and the mechanical claw to move above the trench, and then drives the mechanical claw downward by the laying electric push rod to lay the pipeline inside the trench, so as to realize the function of the laying device to quickly lay the pipeline, thereby improving the working efficiency of the laying device when in use;

[0017] By providing a burying mechanism, the burying shovel is located on one side of the soil pile dug out of the trench. After the laying of the power installation pipeline is completed, the control row of keys can be operated to control the mobile electric push rod to work, and the burying shovel is pushed under the action of the mobile electric push rod, and the burying shovel is guided under the action of the guide rod, so that the burying shovel pushes the soil pile into the trench to bury the pipeline, so as to realize the burying function of the laying device, and the functionality is stronger;

[0018] By providing a supporting mechanism, when the mechanical claw clamps the pipeline, the control row of keys can be operated to control the servo motor to work, and the rotating rod is driven to rotate under the action of the servo motor, and the supporting frame is driven to rotate, so that the bottom of the supporting frame supports the pipeline. When the pipeline is about to be placed at the bottom of the channel, the servo motor can be reset by controlling the control row of keys to make the supporting frame move away from the pipeline, so as to realize the supporting function of the laying device for the pipeline, thereby improving the stability of the pipeline when the laying device is in use. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the three-dimensional appearance structure of the utility model;

[0020] Figure 2 This is a schematic diagram of the main cross-sectional structure of the utility model;

[0021] Figure 3 It is an enlarged structural diagram of the burying mechanism of the utility model;

[0022] Figure 4 It is a schematic diagram of an enlarged top view of the supporting mechanism of the utility model.

[0023] In the figure: 1. support frame; 101. control row of keys; 2. laying mechanism; 201. laying components; 2011. mechanical claws; 2012. adjustment seat; 2013. laying electric push rod; 202. linear module; 3. burying mechanism; 301. burying shovel; 302. moving component; 3021. guide rod; 3022. moving electric push rod; 4. supporting mechanism; 401. supporting frame; 402. rotating member; 4021. servo motor; 4022. rotating rod; 4023. mounting frame. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments. In addition, the terms "first", "second", "third", "upper, lower, left, right", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. At the same time, in the description of the present invention, unless otherwise clearly specified and limited, the terms "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0025] The utility model provides a structure of a power installation pipeline laying device as follows Figure 1 and Figure 2 As shown, it includes a support frame 1, a control row key 101 is installed on the surface of the support frame 1, and the model of the control row key 101 can be selected from the LA series. A laying mechanism 2 is arranged inside the support frame 1, and the laying mechanism 2 is composed of a laying component 201 and a linear module 202. The linear module 202 is installed inside the support frame 1, and the linear module 202 is controlled by the control row key 101. The laying component 201 is arranged inside the support frame 1, and a mechanical claw 2011, an adjustment seat 2012 and a laying electric push rod 201 are arranged inside the laying component 201. 3. An adjustment seat 2012 is installed on the surface of the linear module 202. The adjustment seat 2012 performs reciprocating linear motion through the linear module 202. Electric push rods 2013 are installed on both sides of the surface of the adjustment seat 2012. The model of the electric push rod 2013 can be TA series. The input end of the electric push rod 2013 is electrically connected to the output end of the control row key 101. One end of the electric push rod 2013 passes through the adjustment seat 2012 and is installed with a mechanical claw 2011. The mechanical claw 2011 is controlled by the control row key 101.

[0026] When in use, the laying device is pushed to one side of the laid channel so that the laying channel is located between the support frames 1, and then the support frames 1 are fixed to the ground by screws. At this time, the power installation pipeline to be laid is placed on one side of the channel, and the excavated soil is placed on the other side of the channel. Then, the control row of keys 101 is operated to make the control row of keys 101 control the mechanical claw 2011, the laying electric push rod 2013 and the linear module 202 to work, and the mechanical claw 2011 is driven to move downward under the action of the laying electric push rod 2013, and the pipeline is clamped under the action of the mechanical claw 2011, and then the mechanical claw 2011 is controlled to rise by the laying electric push rod 2013. At this time, the linear module 202 drives the adjustment seat 2012 to do linear motion, drives the laying electric push rod 2013 and the mechanical claw 2011 to move above the channel, and then drives the mechanical claw 2011 to move downward through the laying electric push rod 2013, and lays the pipeline inside the channel, so as to realize the function of the laying device to quickly lay pipelines.

[0027] Furthermore, if Figure 3 As shown, a burying mechanism 3 is provided on one side of the bottom of the support frame 1, and the interior of the burying mechanism 3 includes a burying shovel 301 and a moving component 302. A burying shovel 301 is provided on one side of the interior of the support frame 1, and a moving component 302 is provided on one side of the burying shovel 301. The moving component 302 consists of a guide rod 3021 and a moving electric push rod 3022. A moving electric push rod 3022 is installed on one side of the bottom of the support frame 1. The model of the moving electric push rod 3022 can be selected from the TA series. The input end of the moving electric push rod 3022 is electrically connected to the output end of the control row key 101, and one end of the moving electric push rod 3022 penetrates the support frame 1 and is fixedly connected to the surface of the burying shovel 301. A guide rod 3021 is provided on one side of the bottom of the support frame 1. The guide rod 3021 and the support frame 1 slide with each other, and one end of the guide rod 3021 penetrates the support frame 1 and is fixedly connected to the surface of the burying shovel 301.

[0028] When in use, the burying shovel 301 is located on one side of the earth pile dug out of the ditch. After the laying of the power installation pipeline is completed, the control row of keys 101 can be operated to make the control row of keys 101 control the mobile electric push rod 3022 to work, and the burying shovel 301 is pushed under the action of the mobile electric push rod 3022, and the burying shovel 301 is guided under the action of the guide rod 3021, so that the burying shovel 301 pushes the earth pile into the ditch to bury the pipeline, thereby realizing the burying function of the laying device.

[0029] Furthermore, if Figure 4As shown, a supporting mechanism 4 is arranged inside the support frame 1, and the supporting mechanism 4 consists of a supporting frame 401 and a rotating component 402. One side of the supporting frame 401 is respectively arranged on one side of the mechanical claw 2011, and the structure of the supporting frame 401 is an L-shaped structure. A rotating component 402 is arranged on the outer side of the supporting frame 401, and the interior of the rotating component 402 includes a servo motor 4021, a rotating rod 4022 and a mounting frame 4023. The mounting frame 4023 is respectively fixed on one side of the mechanical claw 2011, and the surface of the mounting frame 4023 is installed with a servo motor 4021. The model of the servo motor 4021 can be selected from the SZ series. The input end of the servo motor 4021 is electrically connected to the output end of the control row key 101, and the output end of the servo motor 4021 is fixed with a rotating rod 4022 through a coupling. One end of the rotating rod 4022 is rotatably connected to the surface of the servo motor 4021, and the surface of the rotating rod 4022 is fixedly connected to the surface of the supporting frame 401.

[0030] During use, when the mechanical claw 2011 clamps the pipe, the control row of keys 101 can be operated to make the control row of keys 101 control the servo motor 4021 to work, and under the action of the servo motor 4021, the rotating rod 4022 is driven to rotate, and the supporting frame 401 is driven to rotate, so that the bottom of the supporting frame 401 supports the pipe. When the pipe is about to be placed at the bottom of the channel, the servo motor 4021 can be reset by controlling the control row of keys 101 to make the supporting frame 401 away from the pipe, so as to realize the supporting function of the laying device for the pipe.

[0031] Working principle: When in use, first push the laying device to one side of the laid trench, so that the laying trench is located between the support frame 1, and then fix the support frame 1 to the ground with screws. At this time, the power installation pipeline to be laid is placed on one side of the trench, and the excavated soil is placed on the other side of the trench. Then operate the control row key 101 to make the control row key 101 control the mechanical claw 2011, the laying electric push rod 2013 and the linear module 202 to work, and the mechanical claw 2011 is driven to move downward under the action of the laying electric push rod 2013 , the pipeline is clamped under the action of the mechanical claw 2011, and then the mechanical claw 2011 is controlled to rise by the laying electric push rod 2013. At this time, the linear module 202 drives the adjustment seat 2012 to make a linear motion, driving the laying electric push rod 2013 and the mechanical claw 2011 to move above the channel, and then the laying electric push rod 2013 drives the mechanical claw 2011 to move downward, and the pipeline is laid inside the channel, so as to realize the function of the laying device to quickly lay the pipeline, thereby improving the work efficiency when the laying device is used.

[0032] When the mechanical claw 2011 clamps the pipe, the control row of keys 101 can be operated to make the control row of keys 101 control the servo motor 4021 to work, and the rotating rod 4022 is driven to rotate under the action of the servo motor 4021, and the support frame 401 is driven to rotate, so that the bottom of the support frame 401 supports the pipe. When the pipe is about to be placed at the bottom of the channel, the servo motor 4021 can be reset by controlling the control row of keys 101 to make the support frame 401 away from the pipe, so as to realize the supporting function of the laying device for the pipe, thereby improving the stability of the pipe when the laying device is in use.

[0033] At this time, the burying shovel 301 is located on one side of the earth pile dug out of the ditch. After the laying of the power installation pipeline is completed, the control row of keys 101 can be operated to make the control row of keys 101 control the mobile electric push rod 3022 to work, and the burying shovel 301 is pushed under the action of the mobile electric push rod 3022, and the burying shovel 301 is guided under the action of the guide rod 3021, so that the burying shovel 301 pushes the earth pile into the ditch to bury the pipeline, so as to realize the burying function of the laying device, which is more functional and finally completes the use of the laying device.

[0034] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-limiting from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A power installation pipeline laying device, comprising a support frame (1), characterized in that: A control row of keys (101) is installed on the surface of the support frame (1); a laying mechanism (2) is arranged inside the support frame (1); the laying mechanism (2) is composed of a laying component (201) and a linear module (202); a burying mechanism (3) is arranged on one side of the bottom of the support frame (1); the burying mechanism (3) comprises a burying shovel (301) and a moving component (302); a supporting mechanism (4) is arranged inside the support frame (1); the supporting mechanism (4) is composed of a supporting frame (401) and a rotating component (402).

2. The power installation pipeline laying device according to claim 1, characterized in that: A linear module (202) is installed inside the support frame (1), and the linear module (202) is controlled by a control row of keys (101). A laying component (201) is arranged inside the support frame (1).

3. The power installation pipeline laying device according to claim 2, characterized in that: The laying component (201) is provided with a mechanical claw (2011), an adjustment seat (2012) and a laying electric push rod (2013) inside, the adjustment seat (2012) is installed on the surface of the linear module (202), and the adjustment seat (2012) performs reciprocating linear motion through the linear module (202).

4. The power installation pipeline laying device according to claim 3, characterized in that: Both sides of the surface of the adjustment seat (2012) are equipped with laying electric push rods (2013); the input end of the laying electric push rod (2013) is electrically connected to the output end of the control row key (101); one end of the laying electric push rod (2013) passes through the adjustment seat (2012) and is equipped with a mechanical claw (2011); the mechanical claw (2011) is controlled by the control row key (101).

5. The power installation pipeline laying device according to claim 1, characterized in that: A burying shovel (301) is provided on one side inside the support frame (1), and a moving component (302) is provided on one side of the burying shovel (301).

6. The power installation pipeline laying device according to claim 5, characterized in that: The moving assembly (302) is composed of a guide rod (3021) and a moving electric push rod (3022). The moving electric push rod (3022) is installed on one side of the bottom of the support frame (1). The input end of the moving electric push rod (3022) is electrically connected to the output end of the control row key (101). One end of the moving electric push rod (3022) penetrates the support frame (1) and is fixedly connected to the surface of the burying shovel (301).

7. The power installation pipeline laying device according to claim 6, characterized in that: A guide rod (3021) is provided on one side of the bottom of the support frame (1), the guide rod (3021) and the support frame (1) are slidably matched with each other, and one end of the guide rod (3021) passes through the support frame (1) and is fixedly connected to the surface of the burying shovel (301).

8. The power installation pipeline laying device according to claim 1, characterized in that: One side of the support frame (401) is respectively arranged on one side of the mechanical claw (2011); the structure of the support frame (401) is an L-shaped structure; and a rotating component (402) is arranged on the outer side of the support frame (401).

9. The power installation pipeline laying device according to claim 8, characterized in that: The rotating component (402) contains a servo motor (4021), a rotating rod (4022) and a mounting frame (4023) inside, the mounting frames (4023) are respectively fixed on one side of the mechanical claw (2011), the servo motor (4021) is mounted on the surface of the mounting frame (4023), and the input end of the servo motor (4021) is electrically connected to the output end of the control row key (101).

10. The power installation pipeline laying device according to claim 9, characterized in that: A rotating rod (4022) is fixed to the output end of the servo motor (4021) via a coupling, one end of the rotating rod (4022) is rotatably connected to the surface of the servo motor (4021), and the surface of the rotating rod (4022) is fixedly connected to the surface of the support bracket (401).