By using a load-bearing and reinforcement mechanism for reinforced supporting rods and other components at the connection of concrete pipe piles, the deformation problem caused by high temperature during welding connection is solved, the connection stability and bearing capacity of pipe piles are improved, and their verticality and position accuracy are ensured.
Patent Information
- Application Number
- CN202421598395.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-08
AI Technical Summary
During the welding connection process of existing concrete pipe piles, due to the influence of local high temperature, the pipe piles may deform, affecting their verticality and position accuracy, and thus affecting the bearing capacity and stability.
The load-bearing and reinforcement mechanism is adopted, including reinforcement support rods, mounting rings, mounting rods, connecting piles, reinforcement rods, arc-shaped reinforcement connecting plates, fixed seats, mounting seats, high-strength fastening screws and I-shaped reinforcement frames. Through the synergy of these components, the connection stability and bearing capacity between the lower pipe piles and the upper pipe piles are improved.
It effectively improves the connection stability and bearing capacity between the lower pipe pile and the upper pipe pile, avoids deformation problems caused by high temperature during welding, ensures the verticality and position accuracy of the pipe piles, and thus improves the overall bearing capacity and stability.
Smart Images

Figure CN222796402U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of concrete pipe piles, and in particular to a high-bearing capacity concrete pipe pile. Background Art
[0002] Concrete pipe piles are a type of tubular pile foundation made of high-strength concrete, which is prestressed to improve its bearing capacity and earthquake resistance. It consists of a pipe body and prestressed steel bars. The pipe body is cast in concrete, while the prestressed steel bars are stressed by prestressed anchors and guide devices. Concrete pipe piles play a vital role in construction projects. When the geological conditions are poor and the bearing capacity of the foundation is small, concrete pipe piles can be used as foundations to transfer the weight of the building to the lower soil layer with high bearing capacity through the pile foundation. Its advantages include wide application range, high strength, easy construction and easy maintenance.
[0003] At present, in order to facilitate the transportation of concrete pipe piles, concrete pipe piles are usually preset in two or more sections, and then the two or more sections of concrete pipe piles are connected and installed in a splicing manner. At present, the two or more sections of concrete pipe piles are generally installed and connected by welding. Although welding has the advantages of high connection strength and good stability, the pipe piles may be deformed due to the influence of local high temperature during the welding process, which will affect the verticality and position accuracy of the pipe piles, and further affect the overall bearing capacity and stability. Therefore, a high-bearing capacity concrete pipe pile is proposed. Utility Model Content
[0004] In view of the shortcomings of the prior art, the utility model provides a high-bearing capacity concrete pipe pile, which has the advantages of improving the connection stability and bearing capacity of two concrete pipes, and solves the problem that the pipe pile may be deformed due to the influence of local high temperature, which will affect the verticality and position accuracy of the pipe pile and further affect the overall bearing capacity and stability.
[0005] The present application provides the following technical solutions: A high-bearing capacity concrete pipe pile, comprising a lower pipe pile, an upper pipe pile, a conical mounting seat, and a bearing reinforcement mechanism installed between the lower pipe pile and the upper pipe pile;
[0006] The load-bearing reinforcement mechanism includes four reinforcement support rods fixedly installed on the outer peripheral wall of the conical mounting seat, a mounting ring fixedly installed on the inner peripheral wall of the upper pipe pile, two mounting rods fixedly installed on the bottom of the mounting ring, a connecting pile fixedly installed on the bottom of the mounting rod, four reinforcement clamping rods fixedly installed on the bottom of the upper pipe pile, two arc-shaped reinforcement connecting plates movably installed on the outer peripheral walls of the lower pipe pile and the upper pipe pile, two reinforcement positioning seats fixedly installed on one side of the arc-shaped reinforcement connecting plate close to the lower pipe pile, two mounting seats fixedly installed on the outer peripheral walls of the lower pipe pile and the upper pipe pile, high-strength fastening screws movably installed inside the mounting seat, two I-shaped reinforcement frames slidably connected to the inside of the two arc-shaped reinforcement connecting plates, and a push plate fixedly installed on the top of the I-shaped reinforcement frame.
[0007] The beneficial effects of adopting the above further scheme are: the stability and bearing capacity of the lower pipe pile installation are improved by reinforcing the support rod, the stability of the connection between the lower pipe pile and the upper pipe pile is improved through the action of the mounting ring, the mounting rod, the connecting pile and the reinforcing clamping rod, and the connection between the lower pipe pile and the upper pipe pile is reinforced and installed through the action of the arc-shaped reinforcing connecting plate, the reinforcing positioning seat, the mounting seat, the high-strength fastening screws and the I-shaped reinforcement frame, thereby improving the stability and bearing capacity of the connection between the lower pipe pile and the upper pipe pile.
[0008] Furthermore, four reinforcement slots are provided on the top of the lower pipe pile, and the reinforcement rods are inserted into the reinforcement slots and are of matching sizes.
[0009] The beneficial effect of adopting the above further solution is: it is easy to position and install the reinforcement clamping rod, and improves the stability and bearing capacity between the lower pipe pile and the upper pipe pile.
[0010] Furthermore, two reinforcement positioning grooves are provided on the outer peripheral walls of the lower pipe pile and the upper pipe pile, and the reinforcement positioning seats are clamped inside the reinforcement positioning grooves and are matched in size.
[0011] The beneficial effect of adopting the above further solution is that it is easy to clamp and install the arc-shaped reinforcement connecting plate on the outer peripheral wall of the lower pipe pile and the upper pipe pile.
[0012] Furthermore, the top and bottom of the arc-shaped reinforcement connecting plate are both provided with thread grooves, and the high-strength fastening screws penetrate the internal threads of the mounting seat and are connected to the inside of the thread grooves and are adapted in size.
[0013] The beneficial effect of adopting the above further solution is that it is easy to fix the arc-shaped reinforcement connecting plate to the outer peripheral wall of the lower pipe pile and the upper pipe pile, thereby improving the stability and bearing capacity of the connection between the lower pipe pile and the upper pipe pile.
[0014] Furthermore, two ends of the arc-shaped reinforcement connecting plate are provided with T-shaped slots, the I-shaped reinforcement frame is slidably connected inside the T-shaped slots and is adapted in size, and the push plate is attached to the top of the arc-shaped reinforcement connecting plate.
[0015] The beneficial effect of adopting the above further solution is: improving the stability of the connection between the two arc-shaped reinforcement connecting plates, and at the same time improving the strength of the connection between the lower pipe pile and the upper pipe pile.
[0016] Furthermore, the reinforcement support rod comprises a rod body and a conical head. The reinforcement support rod is installed at a downward inclination angle, and the conical head is installed at the bottom of the rod body.
[0017] The beneficial effect of adopting the above further solution is that by inserting the reinforcement support rod into the ground, the stability of the lower pipe pile installed inside the ground is improved, thereby improving the bearing capacity.
[0018] Furthermore, the diameter of the connecting pile is the same as the inner diameter of the lower pipe pile, the connecting pile is slidably mounted on the inner peripheral wall of the lower pipe pile, and the inner diameter of the connecting pile is the same as the inner diameter of the mounting ring.
[0019] The beneficial effect of adopting the above further solution is that the stability of the connection between the lower pipe pile and the upper pipe pile is improved.
[0020] Furthermore, the upper pipe pile is movably mounted on the top of the lower pipe pile, and the conical mounting seat is fixedly mounted on the bottom of the lower pipe pile.
[0021] The beneficial effect of adopting the above further solution is: forming a concrete pipe pile.
[0022] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0023] The high-bearing capacity concrete pipe pile improves the stability and bearing capacity of the lower pipe pile when installed underground by reinforcing the support rod, improves the stability of the connection between the lower pipe pile and the upper pipe pile by the action of the installation ring, the installation rod, the connecting pile and the reinforcing clamping rod, and reinforces and installs the connection between the lower pipe pile and the upper pipe pile by the action of the arc-shaped reinforcing connecting plate, the reinforcing positioning seat, the mounting seat, the high-strength fastening screws and the I-shaped reinforcement frame, thereby improving the stability and bearing capacity of the connection between the lower pipe pile and the upper pipe pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the structure of the utility model;
[0025] Figure 2 For the utility model Figure 1 Look at the schematic diagram;
[0026] Figure 3This is a schematic diagram of the top view of the arc-shaped reinforcement connecting plate of the utility model;
[0027] Figure 4 This is a schematic diagram of the connection structure of the mounting ring, mounting rod and connecting pile of the utility model.
[0028] Description of reference numerals:
[0029] 1. Lower pipe pile; 2. Upper pipe pile; 3. Conical mounting seat; 4. Reinforced support rod; 5. Mounting ring; 6. Mounting rod; 7. Connecting pile; 8. Reinforced clamping rod; 9. Arc-shaped reinforced connecting plate; 10. Reinforced positioning seat; 11. Mounting seat; 12. High-strength fastening screws; 13. I-shaped reinforcement frame; 14. Push plate; 15. Reinforced clamping slot; 16. Reinforced positioning slot; 17. Threaded slot; 18. T-shaped clamping slot. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0031] See also Figure 1-4 A high-bearing capacity concrete pipe pile in this embodiment includes a lower pipe pile 1, an upper pipe pile 2, a conical mounting seat 3 and a bearing reinforcement mechanism installed between the lower pipe pile 1 and the upper pipe pile 2.
[0032] The upper pipe pile 2 is movably mounted on the top of the lower pipe pile 1 , and the conical mounting seat 3 is fixedly mounted on the bottom of the lower pipe pile 1 .
[0033] The load-bearing reinforcement mechanism includes four reinforcement support rods 4 fixedly mounted on the outer peripheral wall of the conical mounting seat 3. The reinforcement support rods 4 include a rod body and a conical head. The reinforcement support rods 4 are installed at a downward inclination angle, and the conical head is installed at the bottom of the rod body. By inserting the reinforcement support rods 4 into the ground, the stability of the lower pipe pile 1 installed inside the ground is improved, thereby improving the bearing capacity.
[0034] See also Figure 1 The load-bearing reinforcement mechanism also includes a mounting ring 5 fixedly mounted on the inner circumferential wall of the upper pipe pile 2, two mounting rods 6 fixedly mounted on the bottom of the mounting ring 5, and a connecting pile 7 fixedly mounted on the bottom of the mounting rod 6. The diameter of the connecting pile 7 is the same as the inner diameter of the lower pipe pile 1. The connecting pile 7 is slidably mounted on the inner circumferential wall of the lower pipe pile 1. The inner diameter of the connecting pile 7 is the same as the inner diameter of the mounting ring 5, thereby improving the stability of the connection between the lower pipe pile 1 and the upper pipe pile 2.
[0035] Four reinforcement rods 8 are fixedly installed at the bottom of the upper pipe pile 2, and four reinforcement slots 15 are opened on the top of the lower pipe pile 1. The reinforcement rods 8 are inserted into the reinforcement slots 15 and are of suitable size, which is convenient for positioning and installing the reinforcement rods 8, thereby improving the stability and bearing capacity between the lower pipe pile 1 and the upper pipe pile 2.
[0036] The load-bearing reinforcement mechanism also includes two arc-shaped reinforcement connecting plates 9 movably installed on the outer peripheral walls of the lower pipe pile 1 and the upper pipe pile 2. The outer peripheral walls of the lower pipe pile 1 and the upper pipe pile 2 are each provided with two reinforcement positioning grooves 16. The reinforcement positioning seat 10 is clamped in the interior of the reinforcement positioning groove 16 and is adapted in size, so as to facilitate the clamping and installation of the arc-shaped reinforcement connecting plates 9 on the outer peripheral walls of the lower pipe pile 1 and the upper pipe pile 2.
[0037] See also Figure 1-2 The load-bearing reinforcement mechanism also includes two reinforcement positioning seats 10 fixedly installed on one side of the arc-shaped reinforcement connecting plate 9 close to the lower pipe pile 1, and two mounting seats 11 fixedly installed on the outer peripheral walls of the lower pipe pile 1 and the upper pipe pile 2. The top and bottom of the arc-shaped reinforcement connecting plate 9 are provided with thread grooves 17. High-strength fastening screws 12 pass through the internal threads of the mounting seats 11 and are connected to the inside of the thread grooves 17 and are of matching size, so as to facilitate fixing the arc-shaped reinforcement connecting plate 9 to the outer peripheral walls of the lower pipe pile 1 and the upper pipe pile 2, thereby improving the stability and bearing capacity of the connection between the lower pipe pile 1 and the upper pipe pile 2.
[0038] See also Figure 1-3 The load-bearing reinforcement mechanism also includes a high-strength fastening screw 12 movably installed inside the mounting seat 11, two I-shaped reinforcement frames 13 slidably connected to the inside of the two arc-shaped reinforcement connecting plates 9, and a push plate 14 fixedly installed on the top of the I-shaped reinforcement frame 13. T-shaped slots 18 are provided at both ends of the arc-shaped reinforcement connecting plate 9. The I-shaped reinforcement frame 13 is slidably connected to the inside of the T-shaped slot 18 and is of a suitable size. The push plate 14 fits on the top of the arc-shaped reinforcement connecting plate 9, thereby improving the stability of the connection between the two arc-shaped reinforcement connecting plates 9 and improving the strength of the connection between the lower pipe pile 1 and the upper pipe pile 2.
[0039] In the implementation of this example, the I-shaped reinforcement frame 13 will improve the stability of the connection between the two arc-shaped reinforcement connecting plates 9, and at the same time improve the tightness and stability of the connection between the lower pipe pile 1 and the upper pipe pile 2.
[0040] In the implementation of this example, concrete needs to be injected into the lower pipe pile 1 and the upper pipe pile 2 after installation. The concrete will penetrate the interior of the installation ring 5 and the connecting pile 7 and flow into the interior of the lower pipe pile 1 to improve the stress resistance of the lower pipe pile 1 and the upper pipe pile 2, and improve their bearing capacity and stability.
[0041] The electrical components appearing in the text are all electrically connected to the controller and the power supply. The control method of the utility model is controlled by the controller. The control circuit of the controller can be realized by simple programming by technicians in this field. The provision of power supply is also common knowledge in this field. The utility model is mainly used to protect mechanical devices, so the utility model will no longer explain the control method and circuit connection in detail.
[0042] The working principle of the above embodiment is:
[0043] First, the bottom of the lower pipe pile 1 and the conical mounting seat 3 are driven into the ground, and then the upper pipe pile 2 is moved to the top of the lower pipe pile 1 by the crane, and then the upper pipe pile 2 is moved downward to make the connecting pile 7 slide to the inner wall of the lower pipe pile 1, and at the same time, the reinforcing clamping rod 8 will be stuck in the interior of the lower pipe pile 1. At this time, the staff will fit the arc-shaped reinforcing connecting plate 9 to the outer wall of the lower pipe pile 1 and the upper pipe pile 2. At the same time, the reinforcing positioning seat 10 will be stuck in the reinforcing positioning groove 16 opened in the lower pipe pile 1 and the upper pipe pile 2. Then, four high-strength fastening screws 12 are passed through the interior of the mounting seat 11 and are threadedly connected to the top and bottom of the arc-shaped reinforcing connecting plate 9 respectively, and finally the I-shaped reinforcement frame 13 is slid from top to bottom to the interior of the arc-shaped reinforcement connecting plate 9. At this time, the positioning and installation work between the lower pipe pile 1 and the upper pipe pile 2 is completed, which improves the stability and bearing capacity of the connection between the lower pipe pile 1 and the upper pipe pile 2.
Claims
1. A high-bearing capacity concrete pipe pile, characterized in that: It comprises a lower pipe pile (1), an upper pipe pile (2), a conical mounting seat (3), and a load-bearing reinforcement mechanism installed between the lower pipe pile (1) and the upper pipe pile (2); The load-bearing reinforcement mechanism comprises four reinforcement support rods (4) fixedly mounted on the outer peripheral wall of the conical mounting seat (3), a mounting ring (5) fixedly mounted on the inner peripheral wall of the upper pipe pile (2), two mounting rods (6) fixedly mounted on the bottom of the mounting ring (5), a connecting pile (7) fixedly mounted on the bottom of the mounting rod (6), four reinforcement clamping rods (8) fixedly mounted on the bottom of the upper pipe pile (2), and two arc-shaped reinforcement connecting plates movably mounted on the outer peripheral walls of the lower pipe pile (1) and the upper pipe pile (2). (9), two reinforcement positioning seats (10) fixedly mounted on one side of the arc-shaped reinforcement connecting plate (9) close to the lower pipe pile (1), two mounting seats (11) fixedly mounted on the outer peripheral walls of the lower pipe pile (1) and the upper pipe pile (2), high-strength fastening screws (12) movably mounted inside the mounting seats (11), two I-shaped reinforcement frames (13) slidably connected inside the two arc-shaped reinforcement connecting plates (9), and a push plate (14) fixedly mounted on the top of the I-shaped reinforcement frame (13).
2. A high bearing capacity concrete pipe pile according to claim 1, characterized in that: The top of the lower pipe pile (1) is provided with four reinforcement slots (15), and the reinforcement rods (8) are inserted into the reinforcement slots (15) and are of matching size.
3. A high bearing capacity concrete pipe pile according to claim 1, characterized in that: The outer peripheral walls of the lower pipe pile (1) and the upper pipe pile (2) are each provided with two reinforcing positioning grooves (16), and the reinforcing positioning seat (10) is clamped inside the reinforcing positioning grooves (16) and has a matching size.
4. A high bearing capacity concrete pipe pile according to claim 1, characterized in that: The top and bottom of the arc-shaped reinforcement connection plate (9) are both provided with thread grooves (17), and the high-strength fastening screws (12) penetrate the internal threads of the mounting seat (11) and are connected to the inside of the thread grooves (17) with sizes matching each other.
5. The high-bearing capacity concrete pipe pile according to claim 1, characterized in that: T-shaped slots (18) are provided at both ends of the arc-shaped reinforcement connecting plate (9), the I-shaped reinforcement frame (13) is slidably connected inside the T-shaped slots (18) and is of a matching size, and the push plate (14) is fitted on the top of the arc-shaped reinforcement connecting plate (9).
6. A high bearing capacity concrete pipe pile according to claim 1, characterized in that: The reinforcement support rod (4) comprises a rod body and a conical head; the reinforcement support rod (4) is installed at a downwardly inclined angle, and the conical head is installed at the bottom of the rod body.
7. The high-bearing capacity concrete pipe pile according to claim 1, characterized in that: The diameter of the connecting pile (7) is the same as the inner diameter of the lower pipe pile (1); the connecting pile (7) is slidably mounted on the inner peripheral wall of the lower pipe pile (1); and the inner diameter of the connecting pile (7) is the same as the inner diameter of the mounting ring (5).
8. The high-bearing capacity concrete pipe pile according to claim 1, characterized in that: The upper pipe pile (2) is movably mounted on the top of the lower pipe pile (1), and the conical mounting seat (3) is fixedly mounted on the bottom of the lower pipe pile (1).