Steel pipe plane position positioning device suitable for steel pipe stand column pile

By designing a steel pipe plane positioning device suitable for steel pipe column piles, the problem of steel pipe offset in the existing technology is solved, the accurate positioning of the steel pipe plane position is achieved, construction costs are reduced, and construction safety and environmental protection requirements are ensured.

CN222810018UActive Publication Date: 2025-04-29SHENZHEN MUNICIPAL ENG CORP +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421594249.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2025-04-29
Estimated Expiration
2034-07-05

AI Technical Summary

Technical Problem

In the prior art, steel pipe column piles lack effective steel pipe plane positioning devices during underwater cast-in pile construction, resulting in steel pipe offset, affecting subsequent structural construction, and being unfavorable for environmental protection and green construction.

Method used

A steel pipe plane positioning device including an upper frame and a lower frame is designed. The lower frame and the upper frame that are horizontally fixed to the steel sleeve are used to ensure that the steel pipe is accurately positioned during the lifting process by using components such as arc plates and wire hammers.

Benefits of technology

It realizes accurate positioning of the steel pipe plane position, reduces labor costs, saves materials, ensures construction safety, and is suitable for environmental protection and green construction requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222810018U_ABST
    Figure CN222810018U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of steel pipe stand column piles, and discloses a steel pipe plane position positioning device suitable for steel pipe stand column piles, which comprises a lower frame and an upper frame, the upper frame comprises a diameter strip, two trimming strips, a crossing strip and two arc-shaped strips, the inner diameter of each arc-shaped strip is consistent with the outer diameter of a steel pipe, and the periphery of each arc-shaped strip is tangent to the corresponding trimming strip. The lower frame comprises two transverse strips, and the two arc-shaped pieces are connected with three plumb bobs; the projection position of the steel pipe at the top opening of the steel sleeve is determined according to the positions of the two arc-shaped pieces, and the position of the steel pipe is adjusted in the process of putting the steel pipe into the pile hole until the plane position of the steel pipe is aligned with the projection position after the three plumb bobs are aligned with the periphery of the steel pipe; positioning is accurate, environment-friendly and green construction conditions are facilitated, the labor cost is reduced, materials are saved, and safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model patent relates to the technical field of steel pipe column piles, and specifically, to a steel pipe plane position positioning device suitable for steel pipe column piles. Background Art

[0002] Before excavating a large-section foundation pit, the surrounding support piles and internal support system must be prepared. Due to the large cross-section of the foundation pit, the steel trusses used in the internal support system need to be supported by steel pipe column piles and brackets to ensure that the steel trusses are subjected to the same horizontal plane. Therefore, the plane position of the steel pipe column piles is required to be within the allowable range.

[0003] The foundation pit construction must follow the principle of "support first, then excavation". It is determined that the steel pipe column piles can only be constructed using underwater cast-in-place pile construction technology, and they must be positioned at the hole mouth to ensure that the plane position of the formed steel pipe column piles meets the requirements.

[0004] When the steel pipe column pile adopts the underwater cast-in-place pile construction technology, the steel pipe and the steel cage must be connected first, and then the connected steel pipe and steel cage are hoisted into the pile hole by lifting equipment, and then the concrete is poured underwater as a whole to form the pile. If the steel pipe and the steel cage are not effectively positioned during the hoisting process, the steel pipe will be offset, exceeding the standard value, affecting the subsequent construction of other structures.

[0005] In the prior art, when underwater cast-in-place piles are used for the construction of steel pipe column piles, there is a lack of effective steel pipe plane positioning devices during the hoisting and positioning of the steel pipes and steel cages, or the positioning is inaccurate, which can easily cause the steel pipes to shift, affecting the subsequent construction of the internal support system, which is not conducive to environmental protection and green construction. Utility Model Content

[0006] The utility model aims to provide a steel pipe plane position positioning device suitable for steel pipe column piles, aiming to solve the problem in the prior art that there is a lack of effective positioning devices to position the steel pipe plane position of the steel pipe column piles.

[0007] The utility model is implemented as follows: a steel pipe plane position positioning device suitable for steel pipe column piles comprises a lower frame horizontally fixed on a steel casing and an upper frame horizontally fixed on the steel casing and located on the lower frame, the upper frame comprises a diameter bar, two trimming bars, a cross bar and two arc-shaped arc-shaped bars, the inner diameter of the arc-shaped bar is consistent with the outer diameter of the steel pipe; the two trimming bars are respectively arranged on both sides of the diameter bar and are arranged in parallel, one end of the trimming bar is connected to the diameter bar, and the other end of the trimming bar is extended away from the diameter bar;

[0008] The cross bar and the diameter bar are arranged crosswise, and the two ends of the cross bar are respectively connected to the other ends of the two trimming bars; the outer periphery of the arc-shaped piece is arranged tangent to the trimming bar, and the intersection position of the cross bar and the diameter bar forms an intersection position aligned with the center position of the pile; the lower frame includes two parallel transverse bars, and three plumbs are connected to the two arc-shaped pieces;

[0009] The projection position of the steel pipe at the top opening of the steel casing is determined according to the positions of the two arc-shaped pieces. During the process of lowering the steel pipe into the pile hole, the position of the steel pipe is adjusted until the three plumbs are aligned with the outer circumference of the steel pipe and the plane position of the steel pipe is aligned with the projection position.

[0010] Furthermore, a plurality of longitudinal strips are provided between the two transverse strips, and two ends of the longitudinal strips are respectively connected to the two transverse strips.

[0011] Furthermore, two ends of the arc-shaped piece are respectively connected to the diameter bar and the cross bar.

[0012] Furthermore, the outer periphery of the arc-shaped piece has a tangent position arranged tangent to the trimming strip, and the tangent position abuts against the trimming strip.

[0013] Furthermore, the tangent position is fixed to the trimming strip by welding.

[0014] Furthermore, the transverse strips and the diameter strips are respectively fixed to the steel casing by fixing members, and the fixing members have positioning blocks, and the positioning blocks abut against the outer circumference of the steel casing.

[0015] Furthermore, the upper part of the fixing member has a sleeve hole for the transverse bar or the diameter bar to pass through, and the upper part of the fixing member is penetrated by a bolt, and the bolt fixes the fixing member and the transverse bar or the diameter bar relative to each other, and the positioning block is formed at the lower part of the fixing member.

[0016] Furthermore, a lower level is provided on the transverse bar.

[0017] Furthermore, an upper level is provided on the diameter bar, and the upper level is staggered with the lower level and arranged perpendicular to each other.

[0018] Furthermore, there is an alignment gap between the plumb bob and the top of the steel pipe, and the bottom of the plumb bob is connected to a plumb bar made of soft metal and extending to the outer circumference of the steel pipe, and the plumb bar is provided with a plurality of bending plates, and the plurality of bending plates are arranged at intervals along the length direction of the plumb bar; the bending plate has an inner curved surface, and the inner curved surface is arranged toward the outer circumference of the steel pipe, and the curvature of the inner curved surface is consistent with the curvature of the outer circumference of the steel pipe.

[0019] Compared with the prior art, the utility model provides a steel pipe plane position positioning device suitable for steel pipe column piles, in which the upper frame and the lower frame are arranged on the steel casing to determine the projection position of the steel pipe at the top opening of the steel casing. After the pile hole is formed and the steel pipe is lowered into the pile hole, the position of the steel pipe is adjusted so that the three plumbs connected to the two arc-shaped pieces are aligned with the outer circumference of the steel pipe, thereby completing the steel pipe plane position positioning, with accurate positioning, which is beneficial to environmental protection and green construction, reduces labor costs, saves materials and ensures safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of a steel pipe plane position positioning device applicable to steel pipe column piles provided by the utility model;

[0021] Figure 2 It is a structural schematic diagram of a steel pipe plane position positioning device applicable to steel pipe column piles provided by the utility model;

[0022] Figure 3 The utility model provides a front view schematic diagram of a plumb bob provided on the plumb bob. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0024] The implementation of the present utility model is described in detail below in conjunction with specific embodiments.

[0025] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present utility model, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0026] Reference Figure 1-3 As shown, it is a preferred embodiment provided by the utility model.

[0027] A steel pipe plane position positioning device suitable for steel pipe column piles includes a lower frame 200 horizontally fixed on a steel casing 100 and an upper frame 300 horizontally fixed on the steel casing 100 and located on the lower frame 200, the upper frame includes a diameter bar 301, two trimming bars 302, a cross bar 303 and two arc-shaped arc bars 304, the inner diameter of the arc bar 304 is consistent with the outer diameter of the steel pipe 400; the two trimming bars 302 are respectively arranged on both sides of the diameter bar 301 and are arranged in parallel, one end of the trimming bar 302 is connected to the diameter bar 301, and the other end of the trimming bar 302 is extended away from the diameter bar 301.

[0028] The cross bar 303 is arranged crosswise with the diameter bar 301, and the two ends of the cross bar 303 are respectively connected to the other ends of the two trimming bars 302; the outer periphery of the arc piece 304 is arranged tangentially with the trimming bar 302, and the intersection position of the cross bar 303 and the diameter bar 301 forms an intersection position aligned with the center position of the pile; the lower frame 200 includes two parallel transverse bars 201, and three plumbs 305 are connected to the two arc pieces 304;

[0029] The projection position of the steel pipe 400 at the top opening of the steel casing 100 is determined according to the positions of the two arc-shaped pieces 304. During the process of lowering the steel pipe 400 into the pile hole 102, the position of the steel pipe 400 is adjusted until the three plumb bobs 305 are aligned with the outer circumference of the steel pipe 400 and the plane position of the steel pipe 400 is aligned with the projection position.

[0030] The above-provided steel pipe plane position positioning device suitable for steel pipe column piles, the upper frame 300 and the lower frame 200 are arranged on the steel casing 100, and the projection position of the steel pipe 400 at the top opening of the steel casing 100 is determined. After the pile hole 102 is formed, after the steel pipe 400 is lowered into the pile hole 102, the position of the steel pipe 400 is adjusted so that the three plumbs 305 connected to the two arc-shaped pieces 304 are aligned with the outer periphery of the steel pipe 400, and the plane position positioning of the steel pipe 400 is completed. The positioning is accurate, which is beneficial to environmental protection and green construction, reduces labor costs, saves materials and ensures safety.

[0031] In actual construction, the plane position of the steel pipe can be located according to the following steps.

[0032] 1) The steel pipe 400 column pile has a steel pipe 400, an upper frame 300 and a lower frame 200. The upper frame 300 includes a diameter bar 301, two trimming bars 302, a cross bar 303 and two arc-shaped arc bars 304. The inner diameter of the arc bar 304 is consistent with the outer diameter of the steel pipe 400.

[0033] Two trimming strips 302 are arranged on both sides of the diameter strip 301, and are arranged in parallel. One end of the trimming strip 302 is connected to the diameter strip 301, and the other end of the trimming strip 302 is extended away from the diameter strip 301. The cross strip 303 is arranged crosswise with the diameter strip 301, and the two ends of the cross strip 303 are respectively connected to the other ends of the two trimming strips 302. The outer periphery of the arc-shaped sheet 304 is arranged tangent to the trimming strip 302, and the intersection position of the cross strip 303 and the diameter strip 301 forms a cross position. The lower frame 200 includes two parallel transverse strips 201.

[0034] 2) Insert the steel casing 100 into the construction site and determine the center position of the steel pipe 400 column pile;

[0035] 3) Fix the lower frame 200 horizontally on the steel casing 100, arrange the upper frame 300 horizontally on the lower frame 200, and fix the upper frame 300 and the steel casing 100, keep the cross position aligned with the pile center position, and the upper frame 300 and the lower frame 200 form a primary arrangement structure on the steel casing 100; after determining the projection position of the steel pipe 400 on the top opening of the steel casing 100 according to the positions of the two arc-shaped pieces 304, remove the lower frame 200 and the upper frame 300 from the steel casing 100;

[0036] 4) Drilling a pile hole 102 in the steel casing 100, and lowering a steel cage and a steel pipe 400 into the pile hole 102;

[0037] 5) Fix the lower frame 200 horizontally on the steel casing 100, arrange the upper frame 300 horizontally on the lower frame 200, and fix the upper frame 300 and the steel casing 100, keep the cross position aligned with the pile center, and the upper frame 300 and the lower frame 200 form a secondary arrangement structure on the steel casing 100, and the arrangement position of the secondary arrangement structure is consistent with the arrangement position of the primary arrangement structure; the top of the steel pipe 400 is located below the secondary arrangement structure, and three plumbs 305 are connected to the two arc-shaped pieces 304;

[0038] 6) Adjust the position of the steel pipe 400 by lifting equipment until the three plumbs 305 are aligned with the outer circumference of the steel pipe 400, and then determine that the plane position of the steel pipe 400 is aligned with the projection position, and complete the plane position positioning of the steel pipe 400. Here, the plane position of the steel pipe 400 can be accurately positioned according to the principle of "uniqueness of the circumscribed circle of a plane triangle".

[0039] In this embodiment, a plurality of longitudinal bars 202 are provided between the two transverse bars 201 , and the two ends of the longitudinal bars 202 are respectively connected to the two transverse bars 201 . In this way, the structure of the entire lower frame 200 can be ensured to be more stable, and the lower frame 200 can be more stably arranged on the steel casing 100 .

[0040] In this embodiment, two ends of the arc-shaped piece 304 are respectively connected to the diameter bar 301 and the cross bar 303 , so that the structure of the arc-shaped piece 304 is ensured to be stable.

[0041] In this embodiment, the outer periphery of the arc-shaped piece 304 has a tangent position 600 arranged tangent to the trimming strip 302 , and the tangent position 600 abuts against the trimming strip 302 , ensuring that the tangent structure between the outer periphery of the arc-shaped piece 304 and the trimming strip 302 is stable.

[0042] The tangent position 600 is welded and fixed to the trimming strip 302. Alternatively, other structural methods can be used for fixed connection.

[0043] In this embodiment, the transverse bar 201 and the diameter bar 301 are respectively fixed to the steel casing 100 by means of a fixing member 500. The fixing member 500 has a positioning block, and the positioning block abuts against the outer periphery of the steel casing 100, so that the transverse bar 201 and the diameter bar 301 can be firmly fixed to the steel casing 100.

[0044] The upper part of the fixing member 500 has a sleeve hole for the transverse bar 201 or the diameter bar 301 to pass through. Bolts are passed through the upper part of the fixing member 500 to fix the fixing member 500 relative to the transverse bar 201 or the diameter bar 301. A positioning block is formed at the lower part of the fixing member 500.

[0045] After the position of the lower component is determined on the steel casing 100, the transverse bar 201 is inserted into the sleeve hole, the positioning block abuts against the outer periphery of the steel casing 100, and the fixing piece 500 is fixed to the transverse bar 201 by bolts to fix the lower frame 200 on the steel casing 100.

[0046] By using the positioning block to abut against the outer circumference of the steel casing 100, the transverse bar 201 can be axially positioned and restricted, so that the transverse bar 201 is firmly fixed on the steel casing 100, and the fixing member 500 and the transverse bar 201 are relatively fixed by bolts.

[0047] When the upper component is positioned on the steel casing 100 , the diameter bar 301 is inserted into the casing hole, the positioning block abuts against the outer circumference of the steel casing 100 , and the fixing member 500 is fixed to the diameter bar 301 by bolts to fix the upper component on the steel casing 100 .

[0048] In this embodiment, a lower level 203 is provided on the transverse bar 201, and the position of the lower frame 200 on the steel casing 100 is adjusted until the lower level 203 shows that the lower frame 200 is in a horizontal state, and then the lower frame 200 is fixed to the steel casing 100.

[0049] In this embodiment, an upper level 306 is provided on the diameter bar 301, and the upper level 306 and the lower level 203 are staggered and arranged perpendicular to each other; the position of the upper frame 300 on the cylinder roller is adjusted until the upper level 306 shows that the upper frame 300 is in a horizontal state, and the cross position is aligned with the center position of the pile, and then the upper frame 300 is fixed to the steel casing 100.

[0050] The upper level 306 and the lower level 203 are arranged perpendicularly and staggered to each other, so that horizontal leveling can be achieved at multiple positions and orientations on the horizontal plane, so that the lower frame 200 and the upper frame 300 are arranged level.

[0051] In this embodiment, after the upper frame 300 and the lower frame 200 form the initial arrangement structure on the steel casing 100, and before the upper frame 300 and the lower frame 200 are disassembled, the butt-jointed intersection positions of the transverse bar 201 and the steel casing 100 are marked on the transverse bar 201 and the steel casing 100 to form a lower mark, and the butt-jointed intersection positions of the diameter bar 301 and the steel casing 100 are marked on the diameter bar 301 and the steel casing 100 to form an upper mark;

[0052] After the steel pipe 400 is lowered, the lower frame 200 is arranged on the steel casing 100 according to the lower mark, and the upper frame 300 is arranged on the steel casing 100 according to the upper mark, so that the arrangement position of the secondary arrangement structure is consistent with the arrangement position of the primary arrangement structure.

[0053] By arranging the lower mark and the upper mark, the arrangement of the secondary arrangement structure can be facilitated, and the positions of the upper frame 300 and the lower frame 200 on the steel casing 100 in the secondary arrangement structure can be ensured to be consistent with the positions of the upper frame 300 and the lower frame 200 on the steel casing 100 in the primary arrangement structure.

[0054] In this embodiment, there is an alignment gap between the plumb bob 305 and the top of the steel pipe 400, and the bottom of the plumb bob 305 is connected to a plumb bar 602 made of soft metal and extending to the outer circumference of the steel pipe 400. The plumb bar 602 is provided with a plurality of bending pieces 601, and the plurality of bending pieces 601 are arranged at intervals along the length direction of the plumb bar 602; the bending piece 601 has an inner curved surface, and the inner curved surface is arranged toward the outer circumference of the steel pipe 400, and the curvature of the inner curved surface is consistent with the curvature of the outer circumference of the steel pipe 400.

[0055] During the process of adjusting the position of the steel pipe 400, the lifting equipment determines that the plane position of the steel pipe 400 is aligned with the projection position until the three plumb bobs 305 are aligned with the outer circumference of the steel pipe 400 and the inner curved surface of at least one bending piece 601 on each plumb bar 602 is attached to the outer circumference of the steel pipe 400.

[0056] By aligning three plumb bobs 305 with the outer circumference of the steel pipe 400 and providing a plumb bar 602, the verticality of the plumb bobs 305 can be ensured. The inner curved surface of at least one bending piece 601 on each plumb bar 602 is attached to the outer circumference of the steel pipe 400, and the alignment observation of the plumb bob 305 with the outer circumference of the steel pipe 400 can be further determined. After the plumb bob 305 is aligned with the outer circumference of the steel pipe 400, the stability of the plumb bob 305 can be ensured to avoid large fluctuations.

[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A steel pipe plane position positioning device suitable for steel pipe column piles, characterized in that: It comprises a lower frame fixed horizontally on the steel casing and an upper frame fixed horizontally on the steel casing and located on the lower frame, wherein the upper frame comprises a diameter bar, two trimming bars, a cross bar and two arc-shaped arc-shaped bars, wherein the inner diameter of the arc-shaped bar is consistent with the outer diameter of the steel pipe; the two trimming bars are respectively arranged on both sides of the diameter bar and are arranged in parallel, one end of the trimming bar is connected to the diameter bar, and the other end of the trimming bar is extended away from the diameter bar; The cross bar is arranged crosswise with the diameter bar, and the two ends of the cross bar are respectively connected to the other ends of the two trimming bars; the outer periphery of the arc bar is arranged tangent to the trimming bar, and the intersection position of the cross bar and the diameter bar forms an intersection position aligned with the center position of the pile; the lower frame includes two parallel transverse bars, and three plumbs are connected to the two arc bars; The projection position of the steel pipe at the top opening of the steel casing is determined according to the positions of the two arc-shaped strips. During the process of lowering the steel pipe into the pile hole, the position of the steel pipe is adjusted until the three plumbs are aligned with the outer circumference of the steel pipe and the plane position of the steel pipe is aligned with the projection position.

2. The steel pipe plane position positioning device suitable for steel pipe column piles according to claim 1, characterized in that: A plurality of longitudinal strips are arranged between the two transverse strips, and two ends of the longitudinal strips are respectively connected to the two transverse strips.

3. The steel pipe plane position positioning device suitable for steel pipe column piles according to claim 1, characterized in that: The two ends of the arc strip are respectively connected to the diameter strip and the cross strip.

4. The steel pipe plane position positioning device suitable for steel pipe column piles according to claim 3, characterized in that: The outer periphery of the arc-shaped strip has a tangent position arranged tangentially to the trimming strip, and the tangent position abuts against the trimming strip.

5. The steel pipe plane position positioning device suitable for steel pipe column piles according to claim 4, characterized in that: The tangent position is fixed to the trimming strip by welding.

6. The steel pipe plane position positioning device applicable to steel pipe column piles according to any one of claims 1 to 5, characterized in that: The transverse strips and the diameter strips are respectively fixed on the steel casing through fixing members, and the fixing members are provided with positioning blocks, and the positioning blocks are abutted against the outer periphery of the steel casing.

7. The steel pipe plane position positioning device suitable for steel pipe column piles according to claim 6, characterized in that: The upper part of the fixing member has a sleeve hole for the transverse bar or the diameter bar to pass through, and the upper part of the fixing member is penetrated by a bolt, and the bolt fixes the fixing member and the transverse bar or the diameter bar relatively, and the positioning block is formed at the lower part of the fixing member.

8. The steel pipe plane position positioning device applicable to steel pipe column piles according to any one of claims 1 to 5, characterized in that: A lower level is provided on the transverse strip.

9. The steel pipe plane position positioning device suitable for steel pipe column piles according to claim 8, characterized in that: An upper level is provided on the diameter bar, and the upper level is staggered with the lower level and arranged perpendicularly to each other.

10. The steel pipe plane position positioning device applicable to steel pipe column piles according to any one of claims 1 to 5, characterized in that: There is an alignment gap between the plumb bob and the top of the steel pipe. The bottom of the plumb bob is connected to a plumb bar made of soft metal and extending to the outer circumference of the steel pipe. The plumb bar is provided with a plurality of bending plates, which are arranged at intervals along the length direction of the plumb bar. The bending plate has an inner curved surface, which is arranged toward the outer circumference of the steel pipe, and the curvature of the inner curved surface is consistent with the curvature of the outer circumference of the steel pipe.