Attached concrete construction operation platform
By designing an attached concrete construction operation platform, the problems of high cost of erecting traditional temporary scaffolds, high risks and low construction efficiency are solved, and safer and more economical construction results are achieved.
Patent Information
- Application Number
- CN202421787740.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2025-04-29
- Estimated Expiration
- 2034-07-26
AI Technical Summary
Traditional working platforms are generally equipped with temporary scaffolding. The installation cost of temporary scaffolding is high, the installation and dismantling process is high, and the construction efficiency is low.
An attached concrete construction operation platform was designed, including partition wall formwork, walkway board, walkway support, walkway handrail and formwork support. Through the reasonable layout and connection of these components, a stable support structure is formed, which reduces safety hazards and improves construction efficiency.
Through a stable support structure and a safe walkway handrail design, the platform reduces safety hazards during construction, reduces the risks brought about by repeated installation and demolition, reduces construction costs, and improves construction efficiency.
Smart Images

Figure CN222810457U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of scaffolds, in particular to an attached concrete construction operating platform. Background Art
[0002] The partition wall in the main structure adopts the construction technology of large steel formwork (5 meters high) and is equipped with three tension bolts. During the installation and reinforcement of the template tension bolts and the pouring of concrete, it is necessary to set up a work platform. The traditional work platform is generally a temporary scaffolding. The cost of setting up a temporary scaffolding is high, the risk of installation and removal is high, and the construction efficiency is low. In view of this, this application is specially filed. Utility Model Content
[0003] This application proposes an attached concrete construction operation platform to solve the technical problems in the prior art that traditional work platforms are generally temporary scaffolding, the temporary scaffolding is expensive to set up, the installation and removal process has great risks and hidden dangers, and the construction efficiency is low. The above technical purpose of the utility model is achieved through the following technical solutions:
[0004] An attached concrete construction operation platform comprises a partition wall formwork, a walkway board, a walkway support, a walkway handrail and a formwork support, wherein the walkway board is respectively arranged on the upper and lower sides of the partition wall formwork, the walkway supports are respectively arranged on the upper and lower sides of the partition wall formwork, the walkway supports are all located on the lower side of the walkway board, the walkway supports are in contact and cooperation with the walkway board, the walkway handrails are all arranged at the top edge of the walkway board, the formwork support is arranged between the upper side of the partition wall formwork and the ground, and the connection point between the formwork support and the partition wall formwork is flush with the connection point between the walkway support and the partition wall formwork.
[0005] Preferably, a sleeve is provided at the bottom of the walkway board, and the sleeve is plugged into the walkway support.
[0006] Preferably, the walkway board and the walkway support are connected to the partition wall formwork via hinges.
[0007] Preferably, the formwork support is connected to the ground via expansion bolts.
[0008] Preferably, the height of the walkway handrail is 1m.
[0009] Preferably, the angle between the formwork support and the ground is 55°-65°.
[0010] Compared with the prior art, the beneficial effects of the present invention include:
[0011] The formwork support and walkway support provide a stable support for the entire platform, reducing the potential safety hazards caused by unstable support. The design of the walkway handrail effectively prevents workers from falling during operation, thus improving construction safety. Compared with traditional scaffolding, the attached concrete construction operation platform reduces the risks caused by repeated and irregular installation and disassembly operations. It is economical and practical, and after one-time installation, there is no need for repeated installation and disassembly, thus reducing construction costs. It not only reduces storage space, but also reduces the difficulty of transportation and reinstallation, thus improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the utility model;
[0013] Figure 2 This is a schematic diagram of the folded state of this practical template.
[0014] In the figure: 1. Partition wall formwork; 2. Walkway board; 3. Walkway support; 4. Walkway handrail; 5. Formwork support. DETAILED DESCRIPTION
[0015] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0016] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0017] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the utility model. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the utility model.
[0018] Please refer to the attached Figure 1and Figure 2 The attached concrete construction operation platform includes a partition wall formwork 1, a walkway board 2, a walkway support 3, a walkway handrail 4 and a formwork support 5. The walkway board 2 is respectively arranged on the upper and lower sides of the partition wall formwork 1, and the walkway support 3 is respectively arranged on the upper and lower sides of the partition wall formwork 1. The walkway support 3 is located at the lower side of the walkway board 2. The walkway support 3 and the walkway board 2 are in contact and matched. The walkway board 2 and the walkway support 3 are connected to the partition wall formwork 1 through hinges. The walkway handrail 4 is arranged at the top edge of the walkway board 2. The height of the walkway handrail 4 is 1m. The formwork support 5 is arranged between the upper side of the partition wall formwork 1 and the ground. The connection point of the formwork support 5 and the partition wall formwork 1 is flush with the connection point of the walkway support 3 and the partition wall formwork 1. The formwork support 5 is connected to the ground through expansion bolts, and the angle between the formwork support 5 and the ground is 55°-65°.
[0019] By adopting the above technical scheme, the partition wall formwork 1 is first installed in a predetermined position as the basic support surface of the entire operating platform, and is arranged on the walkway board 2 and plugged with the walkway support 3 through the sleeve at the bottom to form a stable support structure. The design of the walkway board 2 allows workers to walk freely and work on it. The walkway support 3 is connected to the walkway board 2 by plugging. By setting the walkway support 3, the bottom of the walkway board 2 is supported and connected to the partition wall formwork 1 through hinges to ensure that the walkway support 3 can be flexibly adjusted and firmly support the walkway board 2, thereby forming a stable triangular support among the walkway support 3, the partition wall formwork 1 and the walkway board 2. By setting the walkway handrail 4, the side of the walkway board 2 is enclosed to improve the safety of workers working on the walkway board 2. The formwork support 5 is then installed between the upper side of the partition wall formwork 1 and the ground. The expansion bolts are firmly connected to the ground to form a stable supporting foundation; the angle of the formwork support 5 is 60°, which not only ensures stability but also facilitates adjustment to adapt to different construction environments; it should be noted that a sleeve is provided at the bottom of the walkway board 2, and the sleeve is plugged into the walkway support 3. When the walkway formwork needs to be folded up, the sleeve and the walkway support 3 can be separated, the walkway board 2 is folded upward, and the walkway support 3 is folded downward, so that the walkway support 3 is hidden between the vertical back ribs of the partition wall formwork 1. In detail, the walkway handrail 4 and the walkway board 2 are detachably connected. Compared with traditional scaffolding, the present application has less installation difficulty and is convenient for storage by arranging walkway boards 2, walkway supports 3 and walkway handrails 4, which reduces the risk of repeated installation and disassembly of traditional work frames and the irregularities of operations. It not only reduces the storage space, but also reduces the difficulty of transportation and reinstallation, thereby improving construction efficiency.
[0020] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.
Claims
1. The attached concrete construction operation platform is characterized by: The invention comprises a partition wall template (1), a walkway plate (2), a walkway support (3), a walkway handrail (4) and a template support (5), wherein the walkway plate (2) is respectively arranged on the upper and lower sides of the partition wall template (1), the walkway support (3) is respectively arranged on the upper and lower sides of the partition wall template (1), the walkway support (3) is located at the lower side of the walkway plate (2), the walkway support (3) and the walkway plate (2) are in contact and fit, the walkway handrail (4) is arranged at the top edge of the walkway plate (2), the template support (5) is arranged between the upper side of the partition wall template (1) and the ground, and the connection point between the template support (5) and the partition wall template (1) is flush with the connection point between the walkway support (3) and the partition wall template (1).
2. The attached concrete construction operation platform according to claim 1 is characterized in that: A sleeve is provided at the bottom of the walkway plate (2), and the sleeve is plugged into the walkway support (3).
3. The attached concrete construction operation platform according to claim 1 is characterized in that: The walkway board (2) and the walkway support (3) are both connected to the partition wall formwork (1) via hinges.
4. The attached concrete construction operation platform according to claim 1, characterized in that: The formwork support (5) is connected to the ground via expansion bolts.
5. The attached concrete construction operation platform according to claim 1, characterized in that: The height of the walkway handrail (4) is 1m.
6. The attached concrete construction operation platform according to claim 1, characterized in that: The angle between the formwork support (5) and the ground is 55°-65°.