Hoisting rigging for wind power installation crane

By designing a lifting rigging for wind power installation cranes and using cylinders to control the movement of the lifting plate, the problem of poor stability of wind power blades during drilling positioning or installation is solved, and more stable lifting and transportation is achieved.

CN222821106UActive Publication Date: 2025-05-02HENAN SHENGQI MASCH GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520560641.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-28
Publication Date
2025-05-02
Estimated Expiration
2035-03-28

AI Technical Summary

Technical Problem

The existing wind power blade lifting rigging has poor stability and uncertain swaying due to the suspended state during drilling positioning or installation, which affects the installation accuracy and transportation safety.

Method used

A lifting rigging for wind power installation cranes is designed, using balance seats, lifting rings, hooks, chains, hooks, cylinders and suspended plates. The movement of the suspended plate is controlled through the rod body of the cylinder to achieve stable shoveling and lifting of wind power blades.

Benefits of technology

When lifting wind power blades, the movement of the suspension plate is controlled through the cylinder to ensure that the blades are more stable in the air, facilitate installation and processing, and maintain a more balanced and stable suspension during transportation, improving transportation safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222821106U_ABST
    Figure CN222821106U_ABST
Patent Text Reader

Abstract

The utility model discloses a hoisting rigging for a wind power installation crane, which relates to the technical field of wind power blade hoisting rigging, and comprises a balance seat, a plurality of hoisting rings, hoisting hooks, a lock chain, a clamping hook, an air cylinder and a hoisting plate, the lifting hook is buckled on the lifting ring; and the chain is connected with the lifting hook. When the wind power blade is lifted, the lifting plate is controlled to move through the rod body of the air cylinder, so that the lifting plate can shovel all blades of a wind power generator, the wind power blade is lifted by the lifting plate when a crane lifts again, and the wind power blade is supported by the lifting plate in the lifting process, so that the wind power blade is more stable in the air, and the wind power blade is more stable. The wind power blade hoisting device is simple in structure and convenient to install and machine, and when the wind power blade is hoisted and transported, the wind power blade is suspended in a more balanced mode, and transportation is more stable and safer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of wind power blade hoisting rigging, and more specifically to a hoisting rigging used for a wind power installation crane. Background Art

[0002] Wind turbine blades are the core components of wind turbines. Their main function is to convert natural wind energy into electrical energy. They are responsible for capturing wind energy and converting it into mechanical energy, which is then converted into electrical energy through generators.

[0003] Crane lifting rigging is needed for the installation and processing of wind turbine blades on the market. The rigging lifts the wind turbine blades and performs drilling positioning or installation coordination on the blades. However, the existing crane lifting rigging usually lifts the wind turbine blades from the middle. When drilling holes, the blades are suspended in the air, with extremely poor stability, swaying, and easy to shake, which will undoubtedly cause great obstacles to the drilling positioning or installation process, and will also significantly increase the difficulties caused by the lifting and transportation process.

[0004] Based on the above background, a lifting rigging for a wind power installation crane is proposed to solve the problem. Summary of the invention

[0005] Other features and advantages of the utility model will be described in the following description, and partly become apparent from the description, or understood by implementing the utility model. The purpose and other advantages of the utility model can be realized and obtained through the structures specifically pointed out in the description and other drawings of the description.

[0006] The utility model aims to overcome the above-mentioned shortcomings and provide a hoisting rigging for a wind power installation crane.

[0007] To achieve the above-mentioned purpose, the technical solution of the utility model is: a lifting rigging for a wind power installation crane, including: a balance seat, a lifting ring, a hook, a chain, a hook, a cylinder, and a hanging plate, wherein a plurality of lifting rings are provided and are symmetrically arranged on the balance seat; the lifting hook is buckled on the lifting ring; the chain is connected to the lifting hook; the hook is connected to the chain; a plurality of cylinders are provided and are symmetrically arranged under the balance seat; and the hanging plate is connected to the rod body of the cylinder.

[0008] Preferably, the hanging plate adopts a right-angle plate structure.

[0009] Preferably, the vertical plate on the hanging plate is connected to the rod body of the cylinder, and the horizontal plate is used to support and lift the wind turbine blades.

[0010] Preferably, a slide rail is provided on the hanging plate.

[0011] Preferably, a lifting plate is installed on the hanging plate and is connected to the slide rail.

[0012] Preferably, a rubber anti-wear pad is attached to the lifting plate.

[0013] Preferably, a first bolt is connected to the lower side of the hanging plate, and the first bolt is threaded through the bottom of the hanging plate and abuts against the lower side of the lifting plate.

[0014] Preferably, a plurality of second bolts are threadedly connected to the lower side of the balancing seat and are used to fix the cylinder on the balancing seat.

[0015] The beneficial effects of the utility model are as follows: when lifting the wind turbine blades, the utility model controls the movement of the hanging plate through the rod body of the cylinder, so that the hanging plate can scoop up all the blades of the wind turbine. When the crane is lifted again, the hanging plate lifts the wind turbine blades. During the lifting process, the wind turbine blades are supported by the hanging plate, which has the effect of making the wind turbine blades more stable in the air and easier to install and process. Moreover, when lifting and transporting, the suspension of the wind turbine blades is more balanced, and the transportation will be more stable and safer. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a structural schematic diagram of a hoisting rigging for a wind power installation crane according to the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the hanging plate of the utility model from the first perspective;

[0018] Figure 3 This is a schematic structural diagram of the hanging plate of the utility model from a second viewing angle;

[0019] Figure 4 It is a schematic diagram of the structure of the balance seat of the utility model when viewed from above.

[0020] Figure numerals: balance seat -1, lifting ring -2, hook -3, chain -4, hook -5, cylinder -6, hanging plate -7, slide rail -8, lifting plate -9, first bolt -10, second bolt -11. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0022] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] See also Figure 1-4 The utility model provides a lifting rigging for a wind power installation crane, comprising: a balance seat 1, a lifting ring 2, a hook 3, a chain 4, a hook 5, a cylinder 6, and a hanging plate 7. The lifting ring 2 is provided in plurality and is symmetrically arranged on the balance seat 1; the hook 3 is buckled on the lifting ring 2; the chain 4 is connected to the hook 3; the hook 5 is connected to the chain 4; the cylinder 6 is provided in plurality and is symmetrically arranged under the balance seat 1; the hanging plate 7 is connected to the rod body of the cylinder 6.

[0024] When in use, the rigging is installed on the crane through the hook 5. When the wind turbine blade needs to be lifted, the crane lowers the height of the balance seat 1 so that the hanging plate 7 is level with the wind turbine blade. Then the rod of the cylinder 6 retracts and moves the hanging plate 7 toward the balance seat 1. There are several hanging plates 7, and the hanging plates 7 can scoop up all the blades of the wind turbine. When the crane is lifted again, it drives the hanging plates 7 to lift the wind turbine blades. During the lifting process, the wind turbine blades are supported by the hanging plates 7, which makes the wind turbine blades more stable in the air and easier to install and process.

[0025] According to some embodiments of the present application, the hanging plate 7 is optionally a right-angle plate structure, the vertical plate on the hanging plate 7 is connected to the rod body of the cylinder 6, and the horizontal plate is used to support the wind turbine blades.

[0026] According to some embodiments of the present application, optionally, a slide rail 8 is provided on the hanging plate 7, a lifting plate 9 is installed on the hanging plate 7 and connected to the slide rail 8, and a first bolt 10 is connected to the lower side of the hanging plate 7, and the first bolt 10 is threaded through the bottom of the hanging plate 7 and abuts against the lower side of the lifting plate 9. In order to make the wind turbine blade more stable on the hanging plate 7, by rotating the first bolt 10, the first bolt 10 is screwed upward against the lifting plate 9, and the lifting plate 9 moves upward under the action of the slide rail 8, and the wind turbine blade is supported to move upward until it is clamped between the rod body of the cylinder 6, so that not only wind turbine blades of different thicknesses can be supported, but also they can be clamped, so that they are not easily offset by processing and installation on the hanging plate 7, and effectively prevent them from separating from the hanging plate 7 and falling, causing unnecessary installation accidents.

[0027] According to some embodiments of the present application, optionally, a rubber anti-wear pad is attached to the lifting plate 9. The rubber anti-wear pad has the function of preventing a large wear on the surface of the wind turbine blade and protecting it.

[0028] According to some embodiments of the present application, optionally, a plurality of second bolts 11 are threadedly connected to the lower side of the balancing seat 1 and are used to fix the cylinder 6 on the balancing seat 1. By screwing the second bolts 11 upward, the second bolts 11 push the cylinder 6 against the balancing seat 1, thereby fixing and installing it. The operation is simple and easy to understand, and the installation is more convenient.

[0029] It should be understood that the embodiments disclosed in the present invention are not limited to the specific processing steps or materials disclosed herein, but should be extended to equivalent substitutions of such features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.

[0030] The "embodiment" mentioned in the specification means that the specific features or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present utility model. Therefore, phrases or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.

[0031] In addition, the described features or characteristics may be combined in one or more embodiments in any other suitable manner. In the above description, some specific details, such as thickness, quantity, etc., are provided to provide a comprehensive understanding of the embodiments of the utility model. However, those skilled in the relevant art will understand that the utility model can be implemented without one or more of the above specific details or can also be implemented using other methods, components, materials, etc.

Claims

1. A hoisting rigging for a wind power installation crane, characterized in that: include: Balance seat (1); A plurality of lifting rings (2) are provided and are symmetrically arranged on the balancing seat (1); A hook (3) which is buckled onto the lifting ring (2); A chain (4) connected to the hook (3); A hook (5) connected to the chain (4); A plurality of cylinders (6) are provided and are symmetrically arranged under the balance seat (1); A hanging plate (7) is connected to the rod body of the cylinder (6).

2. A hoisting rigging for a wind power installation crane according to claim 1, characterized in that: What the hanging plate (7) adopts is a right-angle plate structure.

3. The hoisting rigging for a wind power installation crane according to claim 2, characterized in that: The vertical plate on the hanging plate (7) is connected to the rod body of the cylinder (6), and the horizontal plate is used to support and lift the wind turbine blades.

4. The hoisting rigging for a wind power installation crane according to claim 1, characterized in that: A slide rail (8) is provided on the hanging plate (7).

5. The hoisting rigging for a wind power installation crane according to claim 4, characterized in that: A lifting plate (9) is installed on the hanging plate (7) and is connected to the slide rail (8).

6. The hoisting rigging for a wind power installation crane according to claim 5, characterized in that: A rubber anti-wear pad is attached to the jacking plate (9).

7. The hoisting rigging for a wind power installation crane according to claim 5, characterized in that: The lower side of the hanging plate (7) is connected with a first bolt (10), and the first bolt (10) is threadedly passed through the bottom of the hanging plate (7) and abuts against the lower side of the lifting plate (9).

8. The hoisting rigging for a wind power installation crane according to claim 1, characterized in that: A plurality of second bolts (11) are threadedly connected to the lower side of the balancing seat (1) and are used to fix the cylinder (6) on the balancing seat (1).