By designing a laying equipment for building electromechanical pipes, the pipeline is supported by adjusting mechanisms and guide rollers, combined with anti-detachment mechanisms and limit columns, the problem of wear during laying is solved, and the protection of the pipeline surface and the service life are extended.

CN222823835UActive Publication Date: 2025-05-02张文明
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421713047.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2025-05-02
Estimated Expiration
2034-07-19

AI Technical Summary

Technical Problem

Existing construction mechanical and electrical pipes are prone to wear due to friction when laying, shortening their service life.

Method used

A construction electromechanical pipe laying equipment is designed, and the height of the guide roller is adjusted using an adjustment mechanism to support the pipe through the guide roller to avoid direct contact with the pallet. An anti-detachment mechanism and limit column are provided on the guide roller to ensure that the pipe does not detach the guide roller when installed and moved.

Benefits of technology

It effectively protects the surface of the pipe, avoids wear, extends the service life of the pipe, and ensures smooth movement and safety of the pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222823835U_ABST
    Figure CN222823835U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building electromechanical pipelines, in particular to building electromechanical pipeline laying equipment which comprises two mounting plates, a supporting plate is jointly fixed to the two mounting plates, a connecting plate is arranged below the supporting plate, and an adjusting mechanism is jointly fixed to the connecting plate and the supporting plate. A plurality of first fixing frames are fixed to the side face, opposite to the mounting plate, of the connecting plate at equal intervals, first guide rollers are rotationally arranged on the first fixing frames, a plurality of holes are formed in the supporting plate in a penetrating mode, and the holes and the first guide rollers are arranged in a one-to-one correspondence mode. When the pipeline conveying device is used and a pipeline is installed and moved, the first guide rollers cannot abrade the surface of the pipeline, the second guide rollers can prevent the pipeline from being separated from the first guide rollers, the surface of the pipeline cannot be abraded, the surface of the pipeline is protected, and the service life of the pipeline is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building electromechanical pipelines, in particular to a building electromechanical pipeline laying device. Background Art

[0002] Most of today's enterprises have automated machinery and equipment, and the electromechanical installation industry was born as a result. It involves the installation of equipment, lines, and pipelines for general industrial and public and civil construction projects, 35 kV and below substation projects, and the production and installation of non-standard steel components. Electromechanical installation is a relatively large-scale project, and the project content includes boilers, ventilation and air-conditioning, refrigeration, electrical, instrumentation, motors, compressor units, radio, film, television broadcast control and other equipment. When installing existing electromechanical equipment, it is often necessary to lay corresponding pipelines.

[0003] When laying pipelines, in order to save space, the pipelines are usually laid on the roof. In order to fix the pipelines, fixing frames are used to hold up the pipelines. When installing the pipelines, since multiple fixing frames must be fixed on the roof in advance, it is inevitable that the pipelines will be pushed during installation. When the pipelines are pushed, the pipelines will rub against each other with the multiple fixing frames. During the friction, the surface of the pipelines is easily scratched, which will damage the protective layer on the surface of the pipelines and shorten the service life of the pipelines. Therefore, a building electromechanical pipeline laying equipment is needed to meet the needs. Utility Model Content

[0004] The utility model aims to solve the shortcoming of easy wear when laying building electromechanical pipelines in the prior art, and proposes a building electromechanical pipeline laying device.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A building mechanical and electrical pipeline laying equipment is designed, including two mounting plates, a support plate is commonly fixed on the two mounting plates, a connecting plate is provided under the support plate, an adjustment mechanism is commonly fixed on the connecting plate and the support plate, a plurality of first fixing frames are equidistantly fixed on the side of the connecting plate opposite to the mounting plate, a first guide roller is rotatably provided on the plurality of first fixing frames, a plurality of holes are penetrated on the support plate, and the plurality of holes and the plurality of first guide rollers are arranged in one-to-one correspondence.

[0007] Preferably, the adjustment mechanism comprises a plurality of adjustment components, the plurality of adjustment components are evenly fixed on two opposite sides of the support plate, and the plurality of adjustment components are all fixed on the connecting plate.

[0008] Preferably, the adjustment assembly includes a fixing plate, the fixing plate is fixed on the supporting plate, an electric telescopic rod is fixed on the fixing plate, and the electric telescopic rod is fixed on the connecting plate.

[0009] Preferably, an anti-slip mechanism is fixedly provided on each of the first fixing frames, and the anti-slip mechanism is arranged through the hole.

[0010] Preferably, the anti-slip mechanism includes two fixing rods, the two fixing rods are symmetrically fixed on the first fixing frame, a second fixing frame is fixed on each of the fixing rods, the second fixing frame is arranged to pass through the hole, and a second guide roller is rotatably provided on the second fixing frame.

[0011] Preferably, a pressing mechanism is commonly fixed on two of the second fixing frames on both sides of the same first fixing frame.

[0012] Preferably, the pressing mechanism comprises a connecting rod, the connecting rod is fixed on two of the second fixing frames, and a plurality of limiting columns are fixed on the connecting rod.

[0013] Preferably, the limiting column is a rubber column.

[0014] The utility model provides a construction electromechanical pipeline laying equipment, which has the beneficial effect that when the construction electromechanical pipeline laying equipment is in use, an adjustment mechanism is used to adjust the heights of a plurality of first guide rollers and a plurality of second guide rollers, so that the plurality of first guide rollers all pass through a plurality of holes, so that the plurality of first guide rollers support the pipelines, so that the pipelines do not directly contact the support plate during installation and movement, and the plurality of first guide rollers are all rotatable, so that the plurality of first guide rollers will not wear the surface of the pipeline during installation and movement, and the arrangement of the plurality of second guide rollers can prevent the pipelines from detaching from the plurality of first guide rollers and will not wear the surface of the pipeline, thereby protecting the surface of the pipeline and ensuring the service life of the pipeline. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a front view of a building electromechanical pipeline laying device proposed by the utility model;

[0016] Figure 2 It is a side view of a building electromechanical pipeline laying device proposed by the utility model;

[0017] Figure 3 A top view of a building electromechanical pipeline laying device proposed by the utility model;

[0018] Figure 4 This is a state diagram of the building electromechanical pipelines of the building electromechanical pipeline laying equipment proposed by the utility model during installation.

[0019] In the figure: 1. mounting plate; 2. support plate; 3. hole; 4. fixing plate; 5. electric telescopic rod; 6. connecting plate; 7. first fixing frame; 8. first guide roller; 9. fixing rod; 10. second fixing frame; 11. second guide roller; 12. connecting rod; 13. limiting column; 14. mounting hole. DETAILED DESCRIPTION

[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0021] Example 1: Reference Figure 1-4 , a building electromechanical pipeline laying equipment, comprising two mounting plates 1, on which a support plate 2 is fixed together, the support plate 2 is an inverted U-shaped structure, the two mounting plates 1 are symmetrically arranged on the support plate 2, each mounting plate 1 is penetrated with a plurality of mounting holes 14, the plurality of mounting holes 14 are provided for the installation of a plurality of expansion bolts, the two mounting plates 1 are fixed on the roof by a plurality of expansion bolts, and the position of the support plate 2 is fixed, the pipeline passes through the support plate 2 of the inverted U-shaped structure, and the support plate 2 is used to hold up the pipeline;

[0022] A connecting plate 6 is provided under the support plate 2, and an adjusting mechanism is fixed on the connecting plate 6 and the support plate 2. The adjusting mechanism includes a plurality of adjusting components, and the plurality of adjusting components are evenly fixed on two opposite sides of the support plate 2, and the plurality of adjusting components are fixed on the connecting plate 6. The plurality of adjusting components synchronously control the rise or fall of the connecting plate 6, so that the connecting plate 6 is more stable when the height is adjusted. The adjusting component includes a fixed plate 4, and the fixed plate 4 is an L-shaped structure. The L-shaped fixed plate 4 not only increases the fixing area between the support plate 2, but also makes the fixing between the fixed plate 4 and the support plate 2 more firmly. The fixed plate 4 is fixed on the support plate 2, and an electric telescopic rod 5 is fixed on the fixed plate 4, and the electric telescopic rod 5 is fixed on the connecting plate 6. The height of the connecting plate 6 is adjusted by using a plurality of electric telescopic rods 5.

[0023] A plurality of first fixing frames 7 are fixed at equal intervals on the side of the connecting plate 6 opposite to the mounting plate 1, and first guide rollers 8 are rotatably provided on the plurality of first fixing frames 7. A plurality of holes 3 are penetrated through the support plate 2, and the plurality of holes 3 and the plurality of first guide rollers 8 are arranged in one-to-one correspondence. When the plurality of electric telescopic rods 5 adjust the height of the connecting plate 6, the plurality of first guide rollers 8 can pass through the plurality of holes 3 respectively, thereby adjusting the use positions of the plurality of first guide rollers 8.

[0024] When in use, multiple electric telescopic rods 5 are used to raise the connecting plate 6. The connecting plate 6 drives multiple first guide rollers 8 to pass through multiple holes 3 respectively through multiple first fixing frames 7. When the pipeline is installed, the pipeline is in contact with the multiple first guide rollers 8. The multiple first guide rollers 8 are not only used to separate the pipeline from the support plate 2, but also to support the pipeline, so that the pipeline does not directly contact the support plate 2 when it is installed and moved. In addition, the multiple first guide rollers 8 are all rotatable. When the pipeline is installed and moved, the multiple first guide rollers 8 will not wear the surface of the pipeline, so the surface of the pipeline is protected, thereby ensuring the service life of the pipeline.

[0025] Embodiment 2: In embodiment 1, although the pipeline is supported by multiple first guide rollers 8 when it moves, there is no limit device on the side of the pipeline, and the staff cannot ensure that the pipeline always moves on the multiple first guide rollers 8. That is, the pipeline is easy to fall off from the multiple first guide rollers 8 when it moves, which is not only not conducive to the movement of the pipeline, but also causes the support plate 2 to wear the surface of the pipeline. Figure 1-4 As another preferred embodiment of the utility model, the difference from embodiment 1 is that an anti-slip mechanism is fixedly provided on each first fixing frame 7, and the anti-slip mechanism is arranged through the hole 3. The setting of the anti-slip mechanism allows the pipeline to always move on the multiple first guide rollers 8 when moving, ensuring smooth and safe movement of the pipeline.

[0026] The anti-slip mechanism includes two fixing rods 9, which are symmetrically fixed on the first fixing frame 7. A second fixing frame 10 is fixed on each fixing rod 9. The second fixing frame 10 is set to pass through the hole 3. A second guide roller 11 is rotatably provided on the second fixing frame 10. The multiple second guide rollers 11 are adjusted together with the height of the multiple first guide rollers 8 through the multiple second fixing frames 10 and the multiple fixing rods 9 respectively. Even if the position of the pipeline is offset when it moves on the multiple first guide rollers 8, the pipeline will not be separated from the multiple first guide rollers 8 due to the obstruction of the multiple second guide rollers 11 on both sides.

[0027] A pressing mechanism is commonly fixed on the two second fixing frames 10 on both sides of the same first fixing frame 7. The pressing mechanism includes a connecting rod 12, which is fixed on the two second fixing frames 10. A plurality of limiting columns 13 are fixed on the connecting rod 12. The limiting columns 13 are rubber columns. The rubber columns are elastic and can not only ensure the stability of the pipeline but also prevent damage to the pipeline when the pipeline expands and contracts due to heat. In addition, the contact surface between the plurality of limiting columns 13 and the pipeline is much smaller than the contact surface between the connecting rod 12 and the pipeline, which is more conducive to natural heat dissipation of the pipeline.

[0028] During use, when the pipeline is installed, the multiple second guide rollers 11 move up together with the multiple first guide rollers 8. While the multiple first guide rollers 8 are used to support the pipeline, the multiple second guide rollers 11 are also used to limit the two sides of the pipeline to ensure that the pipeline has a smooth path when moving, and to ensure that the pipeline can always move on the multiple first guide rollers 8. After the pipeline is installed, the multiple electric telescopic rods 5 are used again to lower the height of the connecting plate 6, so that the multiple first guide rollers 8 pass through the multiple holes 3 respectively until the pipeline and the support plate 2 are in contact. At this time, the multiple limit columns 13 on the multiple connecting rods 12 are against the pipeline to limit the pipeline on the support plate 2.

[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A building electromechanical pipeline laying device, comprising two mounting plates (1), characterized in that: A support plate (2) is fixed on the two mounting plates (1) together, a connecting plate (6) is provided below the support plate (2), an adjustment mechanism is fixed on the connecting plate (6) and the support plate (2) together, a plurality of first fixing frames (7) are fixed at equal intervals on the side of the connecting plate (6) opposite to the mounting plate (1), a first guide roller (8) is rotatably provided on the plurality of first fixing frames (7), a plurality of holes (3) are penetrated on the support plate (2), and the plurality of holes (3) and the plurality of first guide rollers (8) are arranged in a one-to-one correspondence.

2. The building electromechanical pipeline laying equipment according to claim 1, characterized in that: The adjustment mechanism comprises a plurality of adjustment components, wherein the plurality of adjustment components are evenly fixed on two opposite side surfaces of the support plate (2), and the plurality of adjustment components are all fixed on the connecting plate (6).

3. The building electromechanical pipeline laying equipment according to claim 2, characterized in that: The adjustment assembly comprises a fixing plate (4), wherein the fixing plate (4) is fixed on the supporting plate (2), an electric telescopic rod (5) is fixed on the fixing plate (4), and the electric telescopic rod (5) is fixed on the connecting plate (6).

4. The building electromechanical pipeline laying equipment according to claim 1, characterized in that: An anti-slip mechanism is fixedly provided on each of the first fixing frames (7), and the anti-slip mechanism is arranged through the hole (3).

5. The building electromechanical pipeline laying equipment according to claim 4, characterized in that: The anti-slip mechanism comprises two fixing rods (9), the two fixing rods (9) are symmetrically fixed on the first fixing frame (7), each fixing rod (9) is fixed with a second fixing frame (10), the second fixing frame (10) is arranged to pass through the hole (3), and a second guide roller (11) is rotatably provided on the second fixing frame (10).

6. The building electromechanical pipeline laying equipment according to claim 5, characterized in that: A pressing mechanism is commonly fixed on the two second fixing frames (10) on both sides of the same first fixing frame (7).

7. The building electromechanical pipeline laying equipment according to claim 6, characterized in that: The pressing mechanism comprises a connecting rod (12), the connecting rod (12) being fixed on two of the second fixing frames (10), and a plurality of limiting columns (13) being fixed on the connecting rod (12).

8. The building electromechanical pipeline laying equipment according to claim 7, characterized in that: The limiting column (13) is a rubber column.