Bridge wet joint construction formwork

By adopting connecting rod lifting components and slurry stopper grooves in the bridge wet joint construction formwork, the problems of inconvenient adjustment of existing formwork and poor joints are solved, and construction efficiency and bridge quality are improved.

CN222834750UActive Publication Date: 2025-05-06YUXI AIRPORT EXPRESSWAY INVESTMENT & DEV CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421805514.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2025-05-06
Estimated Expiration
2034-07-29

AI Technical Summary

Technical Problem

During the construction of wet joints of bridges, the existing formwork is inconvenient to adjust, resulting in low construction efficiency and the formwork and bridge flange plates are not tightly closed, affecting the quality and aesthetics of the bridge.

Method used

A bridge wet joint construction formwork is designed, using connecting rod lifting components, which drives the connecting rod and bottom formwork to lift through a bidirectional screw, combining the sleeve and slurry stop groove to achieve rapid adjustment and close integration of the formwork.

Benefits of technology

It improves the installation efficiency of the formwork, ensures the tightness and smoothness of the joints, avoids the problem of slurry leakage, and improves the overall quality of the bridge wet joints.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222834750U_ABST
    Figure CN222834750U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge wet joint construction formwork which comprises a supporting table and a bottom formwork, the supporting table and the bottom formwork are connected through a connecting rod, a connecting rod lifting assembly is arranged on the supporting table and used for driving the connecting rod and the bottom formwork to ascend and descend, and a sleeve is sleeved on the connecting rod. According to the formwork, the connecting rod can be rapidly and conveniently adjusted through the connecting rod lifting assembly, then the installation efficiency of the formwork can be improved, the working efficiency can be improved, the connecting rod is sleeved with the sleeve, the sleeve serves as a wet joint preformed hole, and follow-up demolding is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge wet joint construction, in particular to a bridge wet joint construction template. Background Art

[0002] The construction process of wet joints in bridges has evolved from the previous construction method of building scaffolding and formwork to the current general equipment hanging formwork construction. It not only requires the use of a large amount of auxiliary building materials, but also the formwork and the bridge flange plate cannot be tightly closed, resulting in leakage, which affects the quality and appearance of the bridge. It is also limited by the site under the bridge, or affects the traffic under the bridge, and the safety risk of construction operations is high.

[0003] CN209412710U discloses a template for bridge wet joint construction, in which a bottom template is installed below the bridge wet joint, and both ends of the bottom template are in contact with the lower surface of the bridge beam, two longitudinal channel steels are installed on both sides of the top of the wet joint, a transverse connecting rod is installed, and the upper nut is tightened to make the bottom template fit closely with the lower surface of the bridge beam. However, the template has the problem of inconvenient adjustment. Utility Model Content

[0004] In view of the above problems, the utility model provides a bridge wet joint construction template, which can effectively improve the convenience of template adjustment to improve construction efficiency.

[0005] Specifically, the utility model provides a bridge wet joint construction template, including: a support platform and a bottom template, the support platform and the bottom template are connected by a connecting rod, a connecting rod lifting assembly is provided on the support platform, the connecting rod lifting assembly is used to drive the connecting rod and the bottom template to rise and fall, and a sleeve is sleeved on the connecting rod.

[0006] Furthermore, the connecting rod lifting assembly comprises:

[0007] A bidirectional screw rod, on which two sliders are arranged, and the bidirectional screw rod and the connecting rod are arranged in a staggered manner;

[0008] An upper connecting rod assembly, the lower end of which is hinged to the slider; the upper part of the connecting rod is connected to the upper connecting rod assembly;

[0009] A lower connecting rod assembly, the upper end of which is hinged to the slider and the lower end of which is connected to the support platform;

[0010] Furthermore, the upper connecting rod assembly comprises:

[0011] Two upper connecting rods are symmetrically arranged, and the bottom ends of the two upper connecting rods are respectively hinged to the two sliders;

[0012] A mounting seat connected to the upper ends of the two upper connecting rods, wherein the connecting rods are fixedly connected to the mounting seat;

[0013] The lower connecting rod assembly comprises:

[0014] Two lower connecting rods are symmetrically arranged, and the top ends of the two lower connecting rods are respectively hinged to the two sliders;

[0015] The fixing seat is fixed on the top of the supporting platform and is connected to the bottom ends of the two lower connecting rods; the connecting rod passes through the fixing seat and then extends upward and is fixedly connected to the mounting seat.

[0016] Furthermore, a handle is provided at one end of the bidirectional screw rod, and the handle is used to rotate the bidirectional screw rod.

[0017] Furthermore, the support platform is configured to be height-adjustable.

[0018] Furthermore, a slurry-stopping groove is provided on the bottom template, and the slurry-stopping groove is used to install a slurry-stopping belt, and the slurry-stopping belt is used to prevent the concrete slurry from seeping out.

[0019] Working principle:

[0020] After the bottom of the connecting rod 2 is connected and fixed to the bottom template 3 by bolts, the slider 43 is driven to move by rotating the bidirectional screw rod 46, so that the connecting rod lifting assembly 4 is raised, and the connecting rod 2 and the bottom template 3 are driven upward synchronously, and finally the bottom template 3 is tightly combined with the bottom of the beam flange plate 6 on both sides of the wet joint.

[0021] Compared with the prior art, the utility model has the following beneficial effects:

[0022] (1) The bridge wet joint construction template provided by the utility model can quickly and conveniently adjust the connecting rod through the connecting rod lifting assembly, thereby improving the installation of the template and improving work efficiency.

[0023] (2) A grout-stopping groove is provided on the bottom formwork. During construction, a grout-stopping strip is installed in the groove. This allows the bottom formwork to be tightly combined with the bottom of the beam flange plates on both sides of the wet joint, ensuring that the joint is tight, does not deform, and does not leak grout. After demolding, the wet joint has a smooth line shape and a flat surface, forming an integral whole with the left and right flange plates, ensuring the overall quality of the wet joint.

[0024] (3) A sleeve is provided on the connecting rod as a reserved hole for the wet joint to facilitate subsequent demoulding. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the structure of the bridge wet joint construction template in Example 1;

[0026] Figure 2 An exploded view of the bridge wet joint construction template in Example 1;

[0027] Figure 3 It is a structural schematic diagram of the connecting rod lifting assembly in Example 1;

[0028] Figure 4 This is a schematic diagram of the usage status of the bridge wet joint construction template in Example 1.

[0029] Reference numerals:

[0030] 1-support platform; 2-connecting rod; 3-bottom template; 31-stop slurry groove; 4-connecting rod lifting assembly; 41-fixed seat; 42-lower connecting rod; 43-sliding block; 44-upper connecting rod; 45-mounting seat; 46-bidirectional screw rod; 47-handle; 5-sleeve; 6-flange plate. DETAILED DESCRIPTION

[0031] The present invention is further described in detail below through specific implementation modes in conjunction with the accompanying drawings.

[0032] Example 1

[0033] like Figure 1-4 As shown, this embodiment provides a bridge wet joint construction template, including: a support platform 1 and a bottom template 3, the support platform 1 and the bottom template 3 are connected by a connecting rod 2, the bottom template 3 and the connecting rod 2 are connected by nuts, and it is ensured that the bottom template 3 template can be freely disassembled from the bottom of the connecting rod 2, and the width of the bottom template 3 is preferably 5-10cm to enter the beam body flange plate 6. The support platform 1 is made of lightweight steel material, and the support platform 1 is divided into an upper support platform and a lower support platform. When in use, the legs on both sides of the lower support platform are placed on the left and right flange plates 6 of the wet joint. The upper support platform and the lower support platform are sleeved, and a number of positioning holes are provided on the side. By inserting the pins into different positioning holes, the height of the support platform 1 can be adjusted, and then the connecting rod 2 can be roughly raised and lowered.

[0034] The upper support platform is provided with a connecting rod lifting assembly 4, which includes: a bidirectional screw rod 46, an upper connecting rod assembly and a lower connecting rod assembly. The upper connecting rod assembly includes: a mounting seat 45 and two symmetrically arranged upper connecting rods 44. The mounting seat 45 is hinged to the two upper connecting rods 44 respectively. The mounting seat 45 extends to one side and is then fixed to the top of the connecting rod 2 to stagger the bidirectional screw rod 46 to avoid mutual influence between the two. The lower connecting rod assembly includes: a fixing seat 41 and two symmetrically arranged lower connecting rods 43. The fixing seat 41 is fixed to the top of the upper support platform by bolts and connected to the bottom ends of the two lower connecting rods 43. A slider 43 is provided on the bidirectional screw rod 46, and the bottom end of the upper connecting rod 44 and the upper end of the lower connecting rod 42 are connected to the slider 43. A handle 47 is provided at one end of the bidirectional screw rod 46 to rotate the bidirectional screw rod 46. When the bidirectional screw rod 46 is rotated by the handle 47, the two sliders 43 can be driven to move closer or farther from each other, so that the height of the mounting seat 45 changes, thereby driving the connecting rod 2 to be lifted or lowered.

[0035] Furthermore, a sleeve 5 is sleeved on the connecting rod. After pouring, the sleeve 5 can form a wet joint reserved hole to facilitate subsequent demoulding and hanging of the template. Stop grout grooves 31 are set on both sides of the top of the bottom template 3. The inner edges of the stop grout grooves 31 are at the contact point between the bottom template 3 and the flange plate 6. When the stop grout belt is installed during construction, the bottom template 3 can be tightly combined with the bottom of the beam flange plate 6 on both sides of the wet joint to ensure that the joint is tight, does not deform, and does not leak grout. After demoulding, the wet joint has a smooth linear shape and a flat surface, and is integrated with the left and right flange plates 6 to ensure the overall quality of the wet joint. The problem of grout leakage after the usual wet joint construction is avoided.

[0036] The above specific examples are used to illustrate the present invention, which are only used to help understand the present invention and are not intended to limit the present invention. For those skilled in the art of the present invention, some simple deductions, deformations or substitutions can be made based on the idea of ​​the present invention.

Claims

1. A bridge wet joint construction template, comprising: A bottom template and a plurality of support platforms, wherein the support platform (1) and the bottom template (3) are connected via a connecting rod (2), characterized in that a connecting rod lifting assembly (4) is provided on the support platform (1), the connecting rod lifting assembly (4) is used to drive the connecting rod (2) and the bottom template (3) to rise and fall, and a sleeve (5) is sleeved on the connecting rod (2); The connecting rod lifting assembly (4) comprises: A bidirectional screw rod (46) on which two sliders (43) are arranged, and the bidirectional screw rod (46) and the connecting rod (2) are arranged in a staggered manner; An upper connecting rod assembly, the lower end of which is hinged to the slider (43); the upper part of the connecting rod (2) is connected to the upper connecting rod assembly; The upper end of the lower connecting rod assembly is hinged to the sliding block (43), and the lower end is connected to the supporting platform (1).

2. The bridge wet joint construction template according to claim 1, characterized in that: The upper connecting rod assembly comprises: Two upper connecting rods (44) are symmetrically arranged, and the bottom ends of the two upper connecting rods (44) are respectively hinged to the two sliding blocks (43); A mounting seat (45) connected to the upper ends of the two upper connecting rods (44), wherein the connecting rod (2) is fixedly connected to the mounting seat (45); The lower connecting rod assembly comprises: Two lower connecting rods (42) are symmetrically arranged, and the top ends of the two lower connecting rods (42) are respectively hinged to two sliding blocks (43); The fixing seat (41) is fixed on the top of the support platform (1) and is connected to the bottom ends of the two lower connecting rods (42); the connecting rod (2) passes through the fixing seat (41), extends upward and is fixedly connected to the mounting seat (45).

3. The bridge wet joint construction template according to any one of claims 1 to 2, characterized in that: A handle (47) is provided at one end of the bidirectional screw rod (46), and the handle (47) is used to rotate the bidirectional screw rod (46).

4. The bridge wet joint construction template according to claim 1, characterized in that: The support platform (1) is configured to be height-adjustable.

5. The bridge wet joint construction template according to claim 1, characterized in that: The bottom template (3) is provided with a grout-stopping groove (31), the grout-stopping groove (31) is used for installing a grout-stopping strip, and the grout-stopping strip is used to prevent concrete slurry from seeping out.