Building engineering construction platform
By setting up a reversible protective plate with steps and a liftable storage tank on the construction platform, the difficulties in material handling and the high labor intensity of construction personnel are solved on the existing construction platform, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202421482881.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2034-06-26
AI Technical Summary
While the existing construction platforms ensure the safety of construction personnel, the guardrails cause difficulties in material handling, and construction personnel need to bend down frequently to get materials, resulting in low construction efficiency and high labor intensity.
Design a construction platform for construction projects, which facilitates material transportation and loading by setting up a first protective plate with steps; at the same time, flip blocks and fixing nails are set up to enhance the stability of the bottom plate; and a liftable storage tank is set up to improve the convenience of construction workers to pick up materials.
Through the reversible protective panel and liftable storage tank, convenient transportation and storage of materials are achieved, labor intensity of construction workers is reduced, and construction efficiency is improved.
Smart Images

Figure CN222835315U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building engineering construction, in particular to a building engineering construction platform. Background Art
[0002] Construction engineering refers to the planning, investigation, design, construction, completion and other technical work and completed engineering entities for the construction, reconstruction or expansion of buildings and ancillary structures and facilities, as well as the installation of supporting lines, pipelines and equipment; the construction projects of "buildings" include factories, theaters, hotels, shops, schools, hospitals and residences. The construction platform in the prior art needs to ensure the safety of construction workers while providing operation for them, and also needs to carry materials. In order to ensure the safety of construction workers, the existing construction platform is generally equipped with guardrails in four directions. Although the setting of the guardrails plays a protective role, it also has a great impact on the handling of materials. In addition, the materials are placed on the construction platform, and the construction workers standing on the construction platform need to bend down many times to pick up the materials for construction, which is cumbersome to operate, with low construction efficiency and high labor intensity.
[0003] Therefore, it is necessary to design a construction platform for building engineering to solve the above problems. Utility Model Content
[0004] In order to overcome the defects in the above-mentioned prior art, the utility model provides a construction platform for a building project. By setting a flip-up first protective plate with steps, the protection function is ensured while facilitating the transportation and loading of materials; at the same time, a flip block and fixing nails are provided to make the base plate more stable; a liftable storage trough is provided to enable construction workers to conveniently take materials and improve construction efficiency.
[0005] Technical Solution
[0006] A construction platform for a building project comprises a base plate, a universal wheel is arranged on the lower side surface of the base plate, a first electric telescopic rod is fixedly arranged on the upper side surface of the base plate, a construction platform is fixedly arranged on the upper end of the first electric telescopic rod, a rotatable stepped protective mechanism is hinged on the construction platform, a lifting mechanism for lifting materials is arranged in the middle position of the construction platform, and a fixing mechanism for fixing the base plate is also arranged on the base plate.
[0007] Furthermore, the protection mechanism includes two first protection plates hinged on the construction platform, the first protection plates are provided with steps, and a second protection plate is also fixedly provided on the construction platform.
[0008] Furthermore, a locking block is provided on a side wall opposite to the second protective plate, a locking rod is inserted into and slidably connected to the upper surface of the locking block, and a socket into which the locking rod can be inserted is provided on the first protective plate.
[0009] Furthermore, the lifting mechanism includes an installation space located in the upper surface of the construction platform, a second electric telescopic rod is fixedly arranged in the installation space, and a storage groove is fixedly arranged at the upper end of the second electric telescopic rod.
[0010] Furthermore, the fixing mechanism includes a flip block hinged on the bottom plate, and a fixing hole penetrates through the flip block.
[0011] Furthermore, a fixing nail for enhancing the fixing effect can be inserted into the fixing hole.
[0012] Furthermore, a limiting counterweight block is fixedly provided on the bottom plate.
[0013] Beneficial Effects
[0014] Compared with the prior art, the utility model has the following beneficial effects: by providing a flippable first protective plate with steps, the protection function is ensured while facilitating the transportation and loading of materials; at the same time, a flip block and fixing nails are provided, so that the bottom plate can be more stable; a liftable storage trough is provided, so that construction workers can conveniently take materials and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a structural schematic diagram of a construction platform for a building project according to the utility model;
[0016] Figure 2 for Figure 1 Schematic diagram of the structure in the AA direction;
[0017] Figure 3 for Figure 1 Enlarged view of point B in the middle.
[0018] Reference Numbers
[0019] Protective mechanism 901, lifting mechanism 902, fixing mechanism 903, base plate 1, first electric telescopic rod 2, universal wheel 3, fixing nail 4, limiting counterweight block 5, construction platform 6, first protective plate 7, storage slot 8, second electric telescopic rod 9, installation space 10, locking block 11, locking rod 12, flip block 13, fixing hole 14, socket 15, step 16, second protective plate 17. DETAILED DESCRIPTION
[0020] In order to better illustrate the content of the utility model, the following is a description with reference to the accompanying drawings and implementation examples:
[0021] have Figure 1-Figure 3 As shown, the utility model discloses a construction platform for a building project, comprising a base plate 1, a universal wheel 3 is arranged on the lower side surface of the base plate 1, a first electric telescopic rod 2 is fixedly arranged on the upper side surface of the base plate 1, a construction platform 6 is fixedly arranged on the upper end of the first electric telescopic rod 2, a rotatable stepped protective mechanism 901 is hinged on the construction platform 6, a lifting mechanism 902 for lifting materials is arranged in the middle position of the construction platform 6, and a fixing mechanism 903 for fixing the base plate 1 is also arranged on the base plate 1.
[0022] Furthermore, the protection mechanism 901 includes two first protection plates 7 hinged to the construction platform 6 , the first protection plates 7 are provided with steps 16 , and the construction platform 6 is also fixedly provided with a second protection plate 17 .
[0023] Furthermore, a locking block 11 is provided on a side wall opposite to the second protective plate 17 , a locking rod 12 is inserted into and slidably connected to the upper surface of the locking block 11 , and a socket 15 into which the locking rod 12 can be inserted is provided on the first protective plate 7 .
[0024] Furthermore, the lifting mechanism 902 includes an installation space 10 located in the upper surface of the construction platform 6 , a second electric telescopic rod 9 is fixedly installed in the installation space 10 , and a storage slot 8 is fixedly installed at the upper end of the second electric telescopic rod 9 .
[0025] Furthermore, the fixing mechanism 903 includes a flip block 13 hinged on the bottom plate 1 , and a fixing hole 14 penetrates through the flip block 13 .
[0026] Furthermore, a fixing nail 4 can be inserted into the fixing hole 14 to enhance the fixing effect.
[0027] Furthermore, a limiting counterweight block 5 is fixedly provided on the base plate 1 .
[0028] Specifically, the base plate 1 can be moved by the universal wheel 3. After the base plate 1 is moved into position, the lower flip block 13 is flipped over, and the fixing nails 4 are passed through the fixing holes 14 and inserted into the ground to strengthen the fixing of the base plate 1 and ensure the overall stability.
[0029] When in use, the locking rod 12 is pulled out upwards, and the first protective plate 7 is flipped down until the lower end of the first protective plate 7 abuts against the ground. At this time, the construction personnel can walk onto the construction platform 6 by means of the steps 16, so as to facilitate the transportation of materials into the storage tank 8;
[0030] After loading, the first protective plate 7 is flipped to a vertical state, and then the locking rod 12 is inserted to fix it, and then the first electric telescopic rod 2 is started to raise the construction platform 6 to the required height;
[0031] At the same time, the second electric telescopic rod 9 is activated to lift the storage tank 8 to the required position, thereby making it easier for construction workers to take materials during work and improving construction efficiency.
[0032] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it; although the technical solution of the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solution recorded in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not make the essence of the corresponding technical solution deviate from the spirit and scope of the technical solution of each embodiment of the utility model.
Claims
1. A construction platform for a building project, characterized in that: The invention comprises a base plate (1), a universal wheel (3) is arranged on the lower side of the base plate (1), a first electric telescopic rod (2) is fixedly arranged on the upper side of the base plate (1), a construction platform (6) is fixedly arranged at the upper end of the first electric telescopic rod (2), a rotatable stepped protective mechanism (901) is hingedly connected to the construction platform (6), a lifting mechanism (902) for lifting materials is arranged at the middle position of the construction platform (6), and a fixing mechanism (903) for fixing the base plate (1) is also arranged on the base plate (1).
2. A construction engineering construction platform according to claim 1, characterized in that: The protection mechanism (901) comprises two first protection plates (7) hinged to the construction platform (6), the first protection plates (7) being provided with steps (16), and a second protection plate (17) being fixedly provided on the construction platform (6).
3. A construction engineering construction platform according to claim 2, characterized in that: A locking block (11) is provided on a side wall opposite to the second protective plate (17), a locking rod (12) is inserted into and slidably connected to the upper surface of the locking block (11), and a socket (15) capable of being inserted by the locking rod (12) is provided on the first protective plate (7).
4. A construction engineering construction platform according to claim 3, characterized in that: The lifting mechanism (902) comprises an installation space (10) located in the upper surface of the construction platform (6), a second electric telescopic rod (9) is fixedly arranged in the installation space (10), and a storage groove (8) is fixedly arranged at the upper end of the second electric telescopic rod (9).
5. A construction engineering construction platform according to claim 4, characterized in that: The fixing mechanism (903) comprises a flip block (13) hinged on the bottom plate (1), and a fixing hole (14) passes through the flip block (13).
6. A construction engineering construction platform according to claim 5, characterized in that: A fixing nail (4) for enhancing the fixing effect can be inserted into the fixing hole (14).
7. A construction engineering construction platform according to claim 6, characterized in that: A position-limiting counterweight block (5) is also fixedly provided on the bottom plate (1).