Steel structure plant building tool

By designing adjustment mechanisms in steel structure factory building tools, including guide rods, sliders, fixing rings and positioning rods, the time-consuming problem of adjusting the ladder position in existing construction tools is solved, and rapid adjustment and improved work efficiency are achieved.

CN222862863UActive Publication Date: 2025-05-13GUANGZHOU YONGJIA ADVERTISING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421452904.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-05-13
Estimated Expiration
2034-06-24

AI Technical Summary

Technical Problem

The existing steel structure factory building tools take a long time to adjust the ladder position, reducing work efficiency.

Method used

A construction tool including a construction platform and a sliding connection of the ladder is designed. Adjustment mechanisms are provided on both sides of the ladder. Through the combination of guide rods, sliders, fixing rings and positioning rods, the ladder position is quickly adjusted.

Benefits of technology

By setting up an adjustment mechanism, staff can quickly adjust the ladder position, reduce adjustment time, and improve work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222862863U_ABST
    Figure CN222862863U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel structure plant building tool, and relates to the technical field of building tools, the steel structure plant building tool further comprises a construction platform, crawling ladders are slidably connected to the two sides of the construction platform, adjusting mechanisms are arranged on the two sides of the crawling ladders, the adjusting mechanisms comprise mounting plates, the mounting plates are located at the bottoms of the side walls of the crawling ladders, and guide rods are fixedly connected to the two sides of the tops of the mounting plates; the outer sides of the guide rods are slidably sleeved with sliding plates, one sides of the sliding plates are fixedly connected with fixing rings through connecting rods, the two sides of the interior of the construction platform are fixedly connected with supporting plates, and the two sides of the tops of the supporting plates are fixedly connected with a plurality of positioning rods used for being matched with the fixing rings. When goods or tools are stacked at the position, close to the crawling ladder, of the construction platform, a worker can quickly adjust the position of the crawling ladder, the time consumed by the worker for adjusting the position of the crawling ladder is shortened, and then the working efficiency of the worker is improved conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction tools, and more specifically, to a steel structure factory building construction tool. Background Art

[0002] In daily life, steel structure factory buildings mainly refer to those whose main load-bearing components are made of steel, including steel columns, steel beams, steel structure foundations, steel roof trusses and steel roofs. The walls of steel structures can also be maintained by brick walls. The characteristics of steel structure factory buildings are: steel structure buildings are light in weight, high in strength and large in span; steel structure buildings are highly fire-resistant and corrosion-resistant; steel structure buildings are easy to move and can be recycled without pollution.

[0003] The document with the prior art publication number CN219732700U provides a steel structure factory building tool. By arranging a fixing column and a bottom plate at the bottom of the fixing frame, the roller can be easily installed, and a brake part is arranged on the outside of the roller, so that the fixing frame can be conveniently fixed after moving. At the same time, a fixing column and a hook are arranged at one end of the ladder, and a slide groove that slides with the hook is arranged inside the fixing plate, so the position of the ladder can be conveniently adjusted, and a protective ring is arranged on the outside of the ladder, which improves safety and solves the problems that some existing construction climbing tools are inconvenient to move during use, inconvenient to fix after moving, poor protective effect during climbing, and inconvenient to adjust the climbing position.

[0004] Although the device has many beneficial effects, the following problems still exist: when constructing a steel structure factory building, workers are required to first build a long construction platform for construction, and a large amount of materials and tools are often piled on the construction platform. When the materials and tools piled on the construction platform are close to the ladder, the workers are required to adjust the position of the ladder. When the above-mentioned tool is used, the threaded rod needs to be repeatedly turned to position and release the ladder, which takes a long time for the workers to adjust the position of the ladder, and thus easily reduces the work efficiency of the workers. In view of this, we propose a steel structure factory building construction tool. Utility Model Content

[0005] The embodiment of the present application provides a tool for building a steel structure factory building, which solves the technical problem in the prior art that it takes a long time for workers to adjust the position of the ladder, thereby easily reducing the work efficiency of the workers. When stacking goods or tools near the ladder on the construction platform, the workers can quickly adjust the position of the ladder, thereby reducing the time spent by the workers on adjusting the position of the ladder, thereby facilitating the technical effect of improving the work efficiency of the workers.

[0006] The embodiment of the present application provides a steel structure factory building construction tool, including: a construction platform;

[0007] Both sides of the construction platform are slidably connected with ladders to facilitate construction when workers are building a factory building;

[0008] Both sides of the ladder are provided with adjustment mechanisms for workers to quickly adjust the position of the ladder;

[0009] The adjustment mechanism includes a mounting plate, which is located at the bottom of the side wall of the ladder, and guide rods are fixedly connected to both sides of the top of the mounting plate. A sliding plate is provided on the outer sliding sleeve of the guide rod, and a fixing ring is fixedly connected to one side of the sliding plate through a connecting rod. Support plates are fixedly connected to both sides of the interior of the construction platform, and a plurality of positioning rods for cooperating with the fixing rings are fixedly connected to both sides of the top of the support plate, so as to improve the adjustment speed of the staff.

[0010] By adopting the above technical solution and setting an adjustment mechanism, when stacking goods or tools near the ladder on the construction platform, the staff can quickly adjust the position of the ladder, thereby reducing the time spent by the staff on adjusting the position of the ladder, thereby facilitating improving the work efficiency of the staff.

[0011] Optionally, the height of the positioning rod is greater than that of the fixing ring, and the size of the inner side of the fixing ring is equal to the size of the two ends of the positioning rod, so as to facilitate the fixing ring to be sleeved on the outer side of the positioning rod.

[0012] By adopting the above technical solution, by limiting the fixing ring and the positioning rod, since the height of the positioning rod is greater than the height of the positioning ring, the positioning ring needs to rise and move a large distance to disengage from the positioning rod, thereby preventing the fixing ring from detaching from the positioning rod at will.

[0013] Optionally, the top of the guide rod is fixedly connected to a limit plate, both sides of the bottom of the slide plate are fixedly connected to springs, and the bottom end of the spring is fixedly connected to the top of the mounting plate to prevent the slide plate from moving at will.

[0014] By adopting the above technical solution and setting a spring, the upward movement of the slide plate will pull the spring, so that the staff needs to use greater force to pull the slide plate upward, thereby preventing the connecting rod and the fixing ring from rising and moving at will.

[0015] Optionally, slide grooves are provided on both sides of the construction platform and one side of the support plate, and sliders are symmetrically fixedly connected to the top and bottom of the other side of the ladder, and the sliders are slidably connected in the slide grooves, thereby facilitating horizontal displacement of the ladder.

[0016] By adopting the above technical solution, by providing the slide groove and the slider, when the ladder moves, the slider can be driven to move in the slide groove, so that the ladder can be horizontally displaced along the direction of the slide groove.

[0017] Optionally, connecting plates are fixedly connected to both sides of the mounting plate, and the connecting plates are connected to the ladder via threaded rods, thereby facilitating the staff to disassemble and assemble the mounting plate.

[0018] By adopting the above technical solution and setting a threaded rod, the connecting plate can be separated from the ladder after the staff unscrews the threaded rod, thereby making it convenient for the staff to separate the mounting plate from the ladder, and further facilitating the staff to assemble or disassemble the adjustment mechanism and the ladder.

[0019] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0020] 1. By setting up the adjustment mechanism, when stacking goods or tools near the ladder on the construction platform, the staff can quickly adjust the position of the ladder, reducing the time spent by the staff on adjusting the position of the ladder, thereby facilitating improving the work efficiency of the staff.

[0021] 2. By setting the spring, the upward movement of the slide plate will pull the spring, so that the staff needs to use greater force to pull the slide plate upward, thereby preventing the connecting rod and the fixing ring from rising and moving at will.

[0022] 3. By setting the threaded rod, after the staff unscrews the threaded rod, the connecting plate can be separated from the ladder, thereby facilitating the staff to separate the mounting plate from the ladder, and further facilitating the staff to assemble or disassemble the adjustment mechanism and the ladder. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of the overall structure of a steel structure factory building construction tool according to an embodiment of the present application;

[0024] Figure 2 A schematic diagram of the connection structure between a construction platform and a support plate of a steel structure factory building construction tool according to an embodiment of the present application;

[0025] Figure 3 A schematic diagram of the connection structure of a ladder and a mounting plate of a steel structure factory building construction tool according to an embodiment of the present application;

[0026] Figure 4 It is a structural enlarged schematic diagram of the A area of ​​a steel structure factory building construction tool according to an embodiment of the present application;

[0027] Explanation of the numbers in the figure: 1. Construction platform; 2. Ladder; 3. Adjustment mechanism; 31. Support plate; 32. Positioning rod; 33. Mounting plate; 34. Guide rod; 35. Slide plate; 36. Fixing ring; 37. Spring; 38. Limiting plate; 39. Slider; 4. Connecting plate; 5. Threaded rod. DETAILED DESCRIPTION

[0028] The present application is further described in detail below in conjunction with the accompanying drawings.

[0029] Reference Figure 1 and Figure 2 , the embodiment of the present application discloses a steel structure factory building construction tool. The steel structure factory building construction tool includes: a construction platform 1;

[0030] Both sides of the construction platform 1 are slidably connected with ladders 2, which is convenient for workers to carry out construction when building a factory building;

[0031] Adjustment mechanisms 3 are provided on both sides of the ladder 2 for workers to quickly adjust the position of the ladder 2;

[0032] The adjusting mechanism 3 includes a mounting plate 33, which is located at the bottom of the side wall of the ladder 2. Guide rods 34 are fixedly connected to both sides of the top of the mounting plate 33. A slide plate 35 is provided on the outer sliding sleeve of the guide rod 34. A fixing ring 36 is fixedly connected to one side of the slide plate 35 through a connecting rod. Support plates 31 are fixedly connected to both sides of the interior of the construction platform 1. Multiple positioning rods 32 for cooperating with the fixing ring 36 are fixedly connected to both sides of the top of the support plate 31, so as to improve the adjustment speed of the staff.

[0033] Reference Figure 1 The height of the positioning rod 32 is greater than the height of the fixing ring 36, and the size of the inner side of the fixing ring 36 is equal to the size of the two ends of the positioning rod 32, so that the fixing ring 36 is easily mounted on the outer side of the positioning rod 32, so that the fixing ring 36 can no longer move horizontally.

[0034] Reference Figure 3 and Figure 4 The top of the guide rod 34 is fixedly connected to a limiting plate 38, so that after the slide plate 35 moves to a position in contact with the limiting plate 38, it can no longer move upward.

[0035] Reference Figure 3 and Figure 4 Springs 37 are fixedly connected to both sides of the bottom of the slide plate 35, the bottom end of the spring 37 is fixedly connected to the top of the mounting plate 33, and the spring 37 is sleeved on the outside of the guide rod 34, so as to prevent the slide plate 35 from moving at will.

[0036] Reference Figure 3 and Figure 4 A handle is fixedly connected to the other side of the slide plate 35, and the cross section of the handle is T-shaped, so that it is convenient for the staff to pull the slide plate 35 to move upward.

[0037] Reference Figure 2 and Figure 3Slide grooves are provided on both sides of the construction platform 1 and one side of the support plate 31, and sliders 39 are symmetrically fixedly connected to the top and bottom of the other side of the ladder 2. The sliders 39 are slidably connected in the slide grooves, so that the ladder 2 can be horizontally displaced.

[0038] Reference Figure 2 and Figure 3 The cross section of the slider 39 is in a convex shape, which makes it easy to prevent the slider 39 from escaping from the slide groove and also prevents the ladder 2 from separating from the construction platform 1.

[0039] Reference Figure 4 Both sides of the mounting plate 33 are fixedly connected with connecting plates 4, and the connecting plates 4 are connected to the ladder 2 through threaded rods 5, so that it is convenient for workers to disassemble and assemble the mounting plate 33.

[0040] The implementation principle of a steel structure factory building tool in the embodiment of the present application is as follows: when construction materials or construction tools are stacked near the ladder 2 on the construction platform 1, the staff can pull the slide plate 35 to move upward, so that the slide plate 35 pulls the spring 37 and drives the connecting rod and the fixing ring 36 to move upward, so that the fixing ring 36 is detached from the outside of one of the positioning rods 32. At this time, the staff can push the ladder 2 to move horizontally. When the ladder 2 moves, it can drive the mounting plate 33, the guide rod 34, the slide plate 35, the connecting rod and the fixing ring 36 to move horizontally. When the ladder 2 moves to the specified position, the staff releases the slide plate 35, so that the pulled spring 37 rebounds and drives the slide plate 35 to move downward. The downward movement of the slide plate 35 can drive the fixing ring 36 to move downward through the connecting rod, so that the fixing ring 36 is sleeved on the outside of another positioning rod 32, thereby facilitating the rapid adjustment of the position of the ladder 2.

[0041] An embodiment of the present application provides a tool for building a steel structure factory. By setting an adjustment mechanism 3, when stacking goods or tools near a ladder 2 on a construction platform 1, workers can quickly adjust the position of the ladder 2, thereby reducing the time spent by the workers on adjusting the position of the ladder 2, thereby facilitating improving the work efficiency of the workers.

Claims

1. A tool for building a steel structure factory building, comprising a construction platform (1), characterized in that: Include: Both sides of the construction platform (1) are slidably connected with ladders (2), which facilitates workers to carry out construction when building a factory building; Both sides of the ladder (2) are provided with adjustment mechanisms (3) for workers to quickly adjust the position of the ladder (2); The adjustment mechanism (3) comprises a mounting plate (33), the mounting plate (33) being located at the bottom of the side wall of the ladder (2), the top of the mounting plate (33) being fixedly connected to guide rods (34) on both sides, the outer sliding sleeve of the guide rod (34) being provided with a slide plate (35), one side of the slide plate (35) being fixedly connected to a fixing ring (36) via a connecting rod, the inside of the construction platform (1) being fixedly connected to support plates (31) on both sides, the top of the support plate (31) being fixedly connected to a plurality of positioning rods (32) for cooperating with the fixing ring (36), so as to facilitate improving the adjustment speed of the staff.

2. The steel structure factory building construction tool according to claim 1, characterized in that: The height of the positioning rod (32) is greater than the height of the fixing ring (36), and the size of the inner side of the fixing ring (36) is equal to the size of the two ends of the positioning rod (32), so that the fixing ring (36) can be easily sleeved on the outer side of the positioning rod (32).

3. The steel structure factory building construction tool according to claim 2, characterized in that: The top of the guide rod (34) is fixedly connected to a limit plate (38), and both sides of the bottom of the slide plate (35) are fixedly connected to springs (37), and the bottom end of the spring (37) is fixedly connected to the top of the mounting plate (33), so as to prevent the slide plate (35) from moving at will.

4. The steel structure factory building construction tool according to claim 3, characterized in that: Slide grooves are provided on both sides of the construction platform (1) and one side of the support plate (31), and sliders (39) are symmetrically fixedly connected to the top and bottom of the other side of the ladder (2), and the sliders (39) are slidably connected in the slide grooves, thereby facilitating the horizontal displacement of the ladder (2).

5. The steel structure factory building construction tool according to claim 4, characterized in that: Connecting plates (4) are fixedly connected to both sides of the mounting plate (33), and the connecting plates (4) are connected to the ladder (2) via threaded rods (5), so that it is convenient for workers to disassemble and assemble the mounting plate (33).

Citation Information

Patent Citations

  • Steel structure plant building tool

    CN219732700U