Electrical engineering investigation and construction integrated equipment

By designing an integrated electrical engineering survey and construction equipment including a flip-board workbench and dustproof board, the existing power engineering survey equipment has been solved and the problems of insufficient safety hazards and applicability during construction have been achieved, and higher safety and better operational convenience have been achieved.

CN222863303UActive Publication Date: 2025-05-13沙黛(上海)电气有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421834977.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-05-13
Estimated Expiration
2034-07-31

AI Technical Summary

Technical Problem

The existing power engineering surveying equipment lacks protective mechanism during construction, resulting in dust and gravel splashing, posing safety hazards, and lacks space for staff to record manual data, which is insufficient for applicability.

Method used

An integrated electrical engineering survey and construction equipment was designed, including the device base, console, flip-board workbench, dustproof board and other components. Through the flip of the flip workbench and the drop of the dustproof plate, an auxiliary support structure is formed to prevent dust and gravel from splashing, and to expand the usable area for staff to operate.

Benefits of technology

It effectively improves the safety of the device, prevents dust and gravel from causing harm to the staff, and improves the applicability of the device by expanding the area of ​​use, making it easier for staff to conduct surveying and mapping and construction operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222863303U_ABST
    Figure CN222863303U_ABST
Patent Text Reader

Abstract

The utility model discloses electrical engineering investigation and construction integrated equipment, which relates to the technical field of electrical engineering and comprises a device base, a console is arranged in the center of the device base, and a drilling mechanism is arranged at the bottom end of the console. According to the electrical engineering investigation and construction integrated equipment, when a worker needs to perform surveying and mapping or construction, the use area of the equipment is expanded by turning over the turning plate workbench, the worker can use the equipment conveniently, and during construction, a second dustproof plate can descend to make contact with the ground by turning over the turning plate workbench, so that the working efficiency is improved. A first dustproof plate is arranged at the bottom end of the cart seat, so that the device is conveniently supported in an auxiliary manner through a second dustproof plate, and meanwhile, through mutual cooperation of the first dustproof plate 5 and the second dustproof plate, the situation that dust and broken stones generated by the drilling mechanism splash to injure surrounding workers when the device performs construction through the drilling mechanism is prevented; and the safety of the device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electrical engineering, in particular to integrated electrical engineering survey and construction equipment. Background Art

[0002] At present, the purpose of power engineering survey is to investigate and study the site's topography, stratum lithology, geological structure, groundwater, surface water, and adverse geological phenomena, and provide a basis for evaluating the site's engineering geological conditions and reasonably determining the exploration project. The commonly used survey methods include pit exploration, drilling, and penetration. Among them, pit exploration is to obtain intuitive data and original soil samples of the stratum through the excavation of the exploration pit. Especially when the site's geological conditions are relatively complex, pit exploration can directly observe the structure and changes of the stratum.

[0003] For example, patent No. CN202310338745.8 discloses an electric power engineering survey device, wherein the side wall of the base is provided with multiple groups of adjustment mechanisms, and the side walls of the multiple groups of the adjustment mechanisms are provided with fixing mechanisms, the fixing mechanisms include a bracket, the side wall of the bracket is provided with a cross slide, the inner wall of the cross slide is slidably connected with a cross slider, the side wall of the cross slider is provided with a transmission box, the other end side wall of the cross slider is provided with a No. 2 motor, the output end of the No. 2 motor extends to the inside of the transmission box, the output end of the No. 2 motor extending to the inside of the transmission box is provided with a No. 1 bevel gear, the inner wall of the transmission box is rotatably connected with the No. 2 bevel gear, the bottom end of the No. 2 bevel gear is fixedly connected with a fixed column, the side wall of the bracket is provided with a stopper, the inner wall of the stopper is slidably connected with a moving rod, and the moving rod extends to the inside of the fixed column, one end of the moving rod extending to the inside of the fixed column is rotatably connected with two groups of connecting rods, the inner wall of the fixed column is rotatably connected with two groups of pins, and the two groups of pins are rotatably connected with the two groups of connecting rods. The utility model designs a fixing mechanism and utilizes the mutual cooperation of the fixing column, the moving rod and the clamping nail in the fixing mechanism, so that the clamping nail can be extended out of the fixing column after the fixing column is extended into the ground, so that the fixing column is firmly stuck in the soil layer, and the device is prevented from being lifted up due to the reverse force of the bottom plate during deep excavation. The adjusting mechanism is designed and the control box, the rotating plate and the telescopic plate in the adjusting mechanism are arranged, so that when the ground is relatively complex, the angles of the four groups of fixing columns and the distances of the fixing columns to be moved out can be adjusted separately, so that the bottom plate can still be firmly fixed on the ground on the undulating ground.

[0004] During construction, the electric power engineering survey device in this patent lacks a protective mechanism on the outside of the device, which causes dust and gravel generated during construction to scatter in all directions, easily injuring workers by mistake. This poses certain safety hazards, and when workers need to manually record survey data, the electric power engineering survey device has no space for the workers, making it insufficiently applicable. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides an integrated electrical engineering survey and construction device, which solves the problem that during the construction of the electric power engineering survey device, due to the lack of a protective mechanism on the outside of the electric power engineering survey device, dust and gravel generated by the construction will collapse in all directions, easily injuring workers by mistake, posing certain safety hazards. In addition, when the workers need to manually record the survey data, the electric power engineering survey device has no space for the workers, resulting in insufficient applicability.

[0006] To achieve the above objectives, the utility model is implemented through the following technical solutions: integrated electrical engineering survey and construction equipment, including a device base, a control console is provided at the center position of the device base, a drilling mechanism is provided at the bottom end of the control console, device side panels are provided at the front and rear ends of the control console, and flip workbenches are provided on both sides of the opposite surfaces of the two device side panels. The bottom end of the flip workbench is located on the inner wall of the device side panel and is movably connected to a second dustproof plate. A trolley seat is provided at the front and rear ends of the device base, and a first dustproof plate is provided at the bottom end of the trolley seat.

[0007] Preferably, both sides of the flap workbench are provided with a rotating shaft rod, one end of the rotating shaft rod passes through the device side plate and extends to the inner side of the device side plate, and the flap workbench is movably connected to the device side plate through the rotating shaft rod.

[0008] Preferably, connecting blocks are provided on both sides of the second dustproof plate, one side of the connecting block is located on the inner side of the device side plate and is provided with a lifting groove, one side of the connecting block extends to the inner side of the lifting groove, the bottom end of the connecting block is located on the inner side of the lifting groove and is provided with a screw rod, the screw rod penetrates the connecting block and the lifting groove and extends to the bottom end of the rotating shaft rod, and the screw rod is engaged with the connecting block.

[0009] Preferably, bevel gears are provided at the intersections of the rotating shaft rod and the screw rod, and the rotating shaft rod and the screw rod are connected through bevel gear transmission.

[0010] Preferably, spring pins are provided on both sides of the outer end surface of the flap workbench, one end of the spring pin is located at the top end of the device side plate and a limiting hole seat is provided, the shape of the spring pin is consistent with the hole on the inner side of the limiting hole seat, and the spring pin is inserted into the inner side of the limiting hole seat.

[0011] Preferably, the drilling mechanism includes a drill bit, a threaded rod and a servo motor. A pneumatic lifting mechanism is provided above the drilling mechanism at the bottom end of the inner wall of the console. The pneumatic lifting mechanism includes a cylinder and a gas rod. The bottom end of the gas rod extends to the top of the drilling mechanism.

[0012] Preferably, a main control chip is provided on the inner side of the console, and the console is electrically connected to the drilling mechanism and the pneumatic lifting mechanism.

[0013] Beneficial Effects

[0014] The utility model provides an integrated electrical engineering survey and construction device. Compared with the prior art, it has the following beneficial effects:

[0015] When the staff needs to survey or carry out construction, the flap workbench is flipped over to expand the use area of ​​the device, which is convenient for the staff to use. During construction, the flap workbench can be flipped over. During the flipping process of the flap workbench, the flap workbench drives the screw in the side panel of the device to rotate through the rotating shaft rod on one side, and the second dustproof plate is engaged with the screw rod, so that during the rotation of the screw rod, the second dustproof plate is lowered and contacts the ground. The bottom end of the cart seat is provided with a first dustproof plate, which is convenient for auxiliary support of the device through the second dustproof plate. At the same time, the first dustproof plate 5 and the second dustproof plate cooperate with each other to prevent the dust and gravel generated by the drilling mechanism from splashing and causing harm to the surrounding workers when the device is constructed through the drilling mechanism, thereby improving the safety of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the utility model device with the side panel opened;

[0018] Figure 3 It is a structural schematic diagram of the connection between the rotating shaft rod and the screw rod of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the control console of the utility model.

[0020] In the figure: 1. device base; 2. control console; 3. device side panel; 4. cart seat; 5. first dustproof plate; 6. flip-up workbench; 7. lifting slot; 8. rotating shaft rod; 9. screw rod; 10. bevel gear; 11. connecting block; 12. drilling mechanism; 13. limit hole seat; 14. spring pin; 15. second dustproof plate. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-4The utility model provides a technical solution: an integrated electrical engineering survey and construction device, including a device base 1, a control console 2 is provided at the center of the device base 1, a drilling mechanism 12 is provided at the bottom end of the control console 2, the drilling mechanism 12 includes a drill bit, a threaded rod and a servo motor, and a pneumatic lifting mechanism is provided above the drilling mechanism 12 at the bottom end of the inner wall of the control console 2, the pneumatic lifting mechanism includes a cylinder and a gas rod, and the bottom end of the gas rod extends to the top of the drilling mechanism 12, and a main control chip is provided on the inner side of the control console 2, and the control console 2 is electrically connected to the drilling mechanism 12 and the pneumatic lifting mechanism, and then the drilling mechanism 12 and the pneumatic lifting mechanism are controlled by the control console 2;

[0023] Device side panels 3 are provided at both the front and rear ends of the console 2, and flap workbenches 6 are provided on both sides of the opposite surfaces of the two device side panels 3. Rotating shaft rods 8 are provided on both sides of the flap workbenches 6. One end of the rotating shaft rod 8 penetrates the device side panel 3 and extends to the inner side of the device side panel 3. The flap workbench 6 is movably connected to the device side panel 3 through the rotating shaft rod 8. The bottom end of the flap workbench 6 is located at the inner wall of the device side panel 3 and is movably connected with a second dustproof plate 15. Connecting blocks 11 are provided on both sides of the second dustproof plate 15. One side of the connecting block 11 is located on the inner side of the device side panel 3 and is provided with a lifting groove 7. One side of the connecting block 11 extends to the inner side of the lifting groove 7. The bottom end of the connecting block 11 is located on the inner side of the lifting groove 7 and is provided with a screw rod 9. The screw rod 9 penetrates the connecting block 11 and the lifting groove 7 and extends to the bottom end of the rotating shaft rod 8. The screw rod 9 and the connecting block 11 are meshed with each other. A bevel gear 10 is provided at the intersection of the rotating shaft rod 8 and the screw rod 9. The rotating shaft rod 8 and the screw rod 9 are connected to each other. 9 is connected by bevel gear 10 transmission, and a trolley seat 4 is provided at both ends of the device base 1, and a first dustproof plate 5 is provided at the bottom end of the trolley seat 4. When the staff needs to survey or carry out construction, the use area of ​​the device is expanded by turning over the flap workbench 6, which is convenient for the staff to use. During construction, the flap workbench 6 can be turned over, and during the turning process of the flap workbench 6, the flap workbench 6 drives the screw 9 in the device side plate 3 to rotate through the rotating shaft rod 8 on one side, and the second dustproof plate 15 is meshed with the screw 9, so that during the rotation process of the screw 9, the second dustproof plate 15 is lowered and contacts with the ground, so that the device can be supported by the second dustproof plate 15 while preventing the dust and gravel generated by the drilling mechanism 12 from splashing and causing harm to the surrounding staff when the device is constructed through the drilling mechanism 12, thereby improving the safety of the device;

[0024] Spring pins 14 are provided on both sides of the outer end surface of the flap workbench 6. One end of the spring pin 14 is located at the top of the device side plate 3 and a limiting hole seat 13 is provided. The shape of the spring pin 14 is consistent with the hole on the inner side of the limiting hole seat 13. The spring pin 14 is inserted into the inner side of the limiting hole seat 13. When the flap workbench 6 is flipped over, the position of the flap workbench 6 is fixed by the spring pin 14 to improve the stability of the device.

[0025] When working, push the device to a suitable position, turn on the power, start the device, and use the control console 2 to provide device side panels 3 at both ends. Both sides of the opposite surfaces of the two device side panels 3 are provided with flip-up workbenches 6. The flip-up workbenches 6 are movably connected to the device side panels 3 through the rotating shaft rod 8, and the bottom end of the flip-up workbench 6 is located on the inner wall of the device side panel 3 and is movably connected to the second dustproof plate 15. When the staff needs to survey or carry out construction, the flip-up workbench 6 is turned over to expand the use area of ​​the device, which is convenient for the staff to use. During construction, The flap workbench 6 flips over, and during the flipping process of the flap workbench 6, the flap workbench 6 drives the screw 9 in the side plate 3 of the device to rotate through the rotating shaft rod 8 on one side, and the second dustproof plate 15 is engaged with the screw 9, so that during the rotation of the screw 9, the second dustproof plate 15 is lowered and contacts the ground, so that the second dustproof plate 15 can be used to assist in supporting the device through the second dustproof plate 15, and prevent the dust and gravel generated by the drilling mechanism 12 from splashing and causing harm to the surrounding personnel when the device is constructed through the drilling mechanism 12, thereby improving the safety of the device.

[0026] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

Claims

1. An integrated electrical engineering survey and construction device, comprising a device base (1), characterized in that: A control console (2) is provided at the center of the device base (1), a drilling mechanism (12) is provided at the bottom end of the control console (2), device side panels (3) are provided at both the front and rear ends of the control console (2), a flap workbench (6) is provided on both sides of the opposite surfaces of the two device side panels (3), the bottom end of the flap workbench (6) is located on the inner wall of the device side panel (3) and is movably connected to a second dustproof plate (15), a trolley seat (4) is provided at both the front and rear ends of the device base (1), and a first dustproof plate (5) is provided at the bottom end of the trolley seat (4).

2. The electrical engineering survey and construction integrated equipment according to claim 1, characterized in that: A rotating shaft rod (8) is provided on both sides of the flap workbench (6), one end of the rotating shaft rod (8) penetrates the device side plate (3) and extends to the inner side of the device side plate (3), and the flap workbench (6) is movably connected to the device side plate (3) via the rotating shaft rod (8).

3. The electrical engineering survey and construction integrated equipment according to claim 1, characterized in that: The second dustproof plate (15) is provided with a connecting block (11) on both sides; one side of the connecting block (11) is located on the inner side of the device side plate (3) and is provided with a lifting groove (7); one side of the connecting block (11) extends to the inner side of the lifting groove (7); the bottom end of the connecting block (11) is located on the inner side of the lifting groove (7) and is provided with a screw rod (9); the screw rod (9) passes through the connecting block (11) and the lifting groove (7) and extends to the bottom end of the rotating shaft rod (8); the screw rod (9) and the connecting block (11) are meshed with each other.

4. The electrical engineering survey and construction integrated equipment according to claim 3, characterized in that: A bevel gear (10) is provided at the intersection of the rotating shaft rod (8) and the screw rod (9), and the rotating shaft rod (8) and the screw rod (9) are connected in transmission via the bevel gear (10).

5. The electrical engineering survey and construction integrated equipment according to claim 1, characterized in that: Spring pins (14) are provided on both sides of the outer end surface of the flap workbench (6); one end of the spring pin (14) is located at the top end of the device side plate (3) and a limiting hole seat (13) is provided; the shape of the spring pin (14) is consistent with the hole on the inner side of the limiting hole seat (13); the spring pin (14) is inserted into the inner side of the limiting hole seat (13).

6. The electrical engineering survey and construction integrated equipment according to claim 1, characterized in that: The drilling mechanism (12) comprises a drill bit, a threaded rod and a servo motor. A pneumatic lifting mechanism is provided above the drilling mechanism (12) at the bottom end of the inner wall of the console (2). The pneumatic lifting mechanism comprises a cylinder and a gas rod. The bottom end of the gas rod extends to the top end of the drilling mechanism (12).

7. The electrical engineering survey and construction integrated equipment according to claim 1, characterized in that: A main control chip is provided on the inner side of the console (2), and the console (2) is electrically connected to the drilling mechanism (12) and the pneumatic lifting mechanism.

Citation Information

Patent Citations

  • Electric power engineering surveying device

    CN116446867A