Prefabricated building curtain wall

By designing quickly assembled splicing units and embedded parts, the problem of high difficulty and cost of existing pre-installed building curtain walls in assembly and maintenance is solved, and the effect of rapid assembly and simplified maintenance is achieved.

CN222879005UActive Publication Date: 2025-05-16JIANGSU HONGYANG CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421900864.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2025-05-16
Estimated Expiration
2034-08-07

AI Technical Summary

Technical Problem

After the existing pre-installed building curtain wall is integrated and assembled in the factory, the transfer and hoisting weight is relatively high, and the assembly workers are difficult to operate. The later maintenance requires complete dismantling of the unit, which is costly and cumbersome.

Method used

A pre-installed architectural curtain wall is designed, using a splicing unit that can be quickly assembled and is fixedly connected to the exterior wall of the building through embedded parts. Multiple groups of splicing units can be spliced ​​together to form an integral curtain wall structure, and the outer frame and the inner frame can be separated and replaced separately from the frame.

Benefits of technology

It realizes rapid assembly and distributed assembly installation, reduces assembly difficulty and cost, simplifies the post-maintenance process, and allows quick replacement of independent units for easy operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222879005U_ABST
    Figure CN222879005U_ABST
Patent Text Reader

Abstract

The utility model discloses a prefabricated building curtain wall which comprises a plurality of groups of splicing units and embedded parts, the splicing units are fixedly connected with a building outer wall body through the embedded parts, each splicing unit comprises a frame, an outer frame, an inner frame and a connecting piece, edge grooves are formed in the front side and the rear side of each frame, and the outer frames and the inner frames are located in the edge grooves in the front side and the rear side respectively. A plurality of positioning mounting holes are formed in the edge grooves, first connecting grooves are formed in the corners of the rear side of the frame, a plurality of second connecting grooves are formed in the edge of the rear side of the frame, a plurality of fixing blocks are symmetrically arranged on the two sides of the rear face of the frame, mounting grooves are formed in the front sides of the embedded parts, and a plurality of galvanized embedded ribs are arranged on the rear sides of the embedded parts. The quick-assembly type assembled part has the advantages that by means of the splicing units capable of being quickly assembled, on-site assembly of a plurality of assembly parts is achieved, and later-stage maintenance is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building curtain walls, in particular to a preassembled building curtain wall. Background Art

[0002] Prefabricated building curtain wall refers to the building envelope structure in which the various components of the curtain wall (such as panels, supporting structures, connectors, etc.) are pre-processed and assembled into modules or units in the factory, and then transported to the construction site for installation. Since the components have been pre-assembled, on-site installation only requires simple splicing and fixing, which greatly shortens the construction period.

[0003] Prefabricated building curtain walls are generally assembled from panel mounting units and connectors and then fixedly connected to the wall. Current curtain wall units are generally integrated and assembled in factories. The weight of transportation and hoisting is large, and it is difficult for assembly workers to operate. When the curtain wall is maintained in the later stage, the entire unit needs to be completely disassembled before replacement or repair. This method is costly and the operation steps are cumbersome. Utility Model Content

[0004] The utility model provides a prefabricated building curtain wall to solve the problems that the above-mentioned curtain wall units are generally integrated and assembled in factories, the weight of transportation and hoisting is large, the assembly workers are difficult to operate, and when the curtain wall is maintained in the later stage, the whole unit needs to be completely disassembled before replacement or repair. This method has high cost and cumbersome operation steps.

[0005] In order to solve the above technical problems, the technical solution provided by the utility model is: a prefabricated building curtain wall, comprising several groups of splicing units and embedded parts, the splicing units are fixedly connected to the outer wall of the building through the embedded parts, the splicing units include a frame, an outer frame, an inner frame, and a connecting part, the front and rear sides of the frame are provided with side grooves, the outer frame and the inner frame are respectively located in the side grooves on the front and rear sides, a plurality of positioning and mounting holes are provided in the side grooves, the rear corners of the frame are provided with first connecting grooves, the rear edge of the frame is provided with a plurality of second connecting grooves, a plurality of fixing blocks are symmetrically provided on both sides of the rear of the frame, the front side of the embedded part is provided with an installation groove, the rear side of the embedded part is provided with a plurality of galvanized embedded ribs, adjacent fixing blocks are located in the installation grooves and are fixedly connected to the embedded parts by bolts.

[0006] Among them, multiple groups of splicing units are spliced ​​together to form an overall curtain wall structure, and the outer frame and inner frame in the splicing unit can be separated from the frame and replaced individually.

[0007] As an improvement, the first connection grooves between the four adjacent groups of splicing units form an angle installation area, wherein one of the connection members is located in the angle installation area, and the connection member is fixedly connected to the frame by bolts.

[0008] As an improvement, an edge installation area is formed between two adjacent groups of splicing units, and one of the connecting pieces is located in the edge installation area.

[0009] As an improvement, glass plates are provided inside the outer frame and the inner frame, and a plurality of matching holes corresponding to the positions of the mounting holes are provided on the outer frame and the inner frame, and a single bolt can complete the connection between the outer frame, the frame body and the inner frame.

[0010] As an improvement, adjacent outer side surfaces of the frames are sealed and connected by means of a sealant.

[0011] The advantages of the utility model are: 1. Through the splicing units that can be assembled quickly, multiple assembly parts can be assembled on site, and the dispersed components are convenient for the transportation and lifting of materials. The frame can be fixed to the building first, and then the glass, stone slabs and other materials that constitute the curtain wall can be installed, which reduces the difficulty of assembly;

[0012] 2. It is convenient for later maintenance. The outer frame and inner frame in the splicing unit can be separated from the frame and replaced separately. This structure is convenient for on-site assembly. During the later maintenance of the curtain wall, the outer or inner layer of the independent unit can be quickly replaced and maintained, which is easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a partial assembly front view of the curtain wall of the utility model.

[0014] Figure 2 It is a rear view of a partial assembly of the curtain wall of the utility model.

[0015] Figure 3 It is a schematic diagram of the exploded structure of the splicing unit of the utility model.

[0016] As shown in the figure: 1. Splicing unit; 2. Embedded parts; 3. Frame; 4. Outer frame; 5. Inner frame; 6. Connectors; 7. Side grooves; 8. Mounting holes; 9. First connecting grooves; 10. Second connecting grooves; 11. Fixing blocks; 12. Mounting grooves; 13. Galvanized embedded ribs; 14. Corner mounting area; 15. Side mounting area; 16. Glass plate; 17. Matching holes. DETAILED DESCRIPTION

[0017] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0018] Combined with Figure 1 , Figure 2 , Figure 3A prefabricated building curtain wall comprises several groups of splicing units 1 and embedded parts 2. The splicing units 1 are fixedly connected to the outer wall of the building through the embedded parts 2. The splicing unit 1 comprises a frame 3, an outer frame 4, an inner frame 5, and a connecting part 6. The outer sides of adjacent frames 3 are sealed and connected by sealant. The front and rear sides of the frame 3 are provided with side grooves 7. The outer frame 4 and the inner frame 5 are respectively located in the side grooves 7 on the front and rear sides. Several positioning and mounting holes 8 are provided in the side grooves 7. The rear corners of the frame 3 are provided with first connecting grooves 9. The rear edge of the frame 3 is provided with several second connecting grooves 10. Several fixing blocks 11 are symmetrically provided on both sides of the rear of the frame 3. The front side of the embedded part 2 is provided with a mounting groove 12. The rear side of the embedded part 2 is provided with several galvanized embedded ribs 13. The adjacent fixing blocks 11 are located in the mounting grooves 12 and are fixedly connected to the embedded part 2 by bolts. The double-layer splicing unit 1 structure can improve the sound insulation and thermal insulation performance of the curtain wall.

[0019] Among them, multiple groups of splicing units 1 are spliced ​​together to form an overall curtain wall structure. The outer frame 4 and the inner frame 5 in the splicing unit 1 can be separated from the frame and replaced individually. This structure is convenient for on-site assembly, and during the later maintenance of the curtain wall, the outer or inner layer of the independent unit can be quickly replaced and maintained, which is easy to operate.

[0020] The first connecting grooves 9 between the four adjacent groups of splicing units 1 form a corner installation area 14, in which one of the connecting members 6 is located, and the connecting member 6 is fixedly connected to the frame 3 by bolts. An edge installation area 15 is formed between two adjacent groups of splicing units 1, in which one of the connecting members 6 is located in the edge installation area 15. The frames 3 of the splicing units 1 can be connected one by one through the connecting members 6, and the inner splicing installation method can maintain the aesthetics of the overall curtain wall facade.

[0021] The outer frame 4 and the inner frame 5 are both provided with a glass plate 16, and the outer frame 4 and the inner frame 5 are both provided with a plurality of matching holes 17 corresponding to the positions of the mounting holes 8. A single bolt can complete the connection between the outer frame 4, the frame body and the inner frame 5, thereby simplifying the installation steps and improving the installation efficiency. This type of connection should be noted that during later maintenance, the outer frame 4 and the inner frame 5 need to be removed at the same time.

[0022] During the specific implementation of the utility model, multiple groups of splicing units are connected one by one, and the combined fixing plates are inserted into the installation grooves and reinforced by bolts. The connecting parts are respectively placed in the corner installation area and the side installation area, and are connected and fastened by bolts. The frames are sealed with sealant, and the outer frame and the inner frame are placed in the side grooves at the same time. The double-layer glass plate is fixed by bolts passing through the matching holes and the installation holes. During later maintenance, it is only necessary to remove the outer frame and the inner frame in the side grooves for replacement.

[0023] The above describes the utility model and its implementation methods, which are not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A prefabricated building curtain wall, comprising a plurality of groups of splicing units (1) and embedded parts (2), wherein the splicing units (1) are fixedly connected to the building outer wall through the embedded parts (2), characterized in that: The splicing unit (1) comprises a frame (3), an outer frame (4), an inner frame (5), and a connecting piece (6). The frame (3) is provided with side grooves (7) on the front and rear sides. The outer frame (4) and the inner frame (5) are respectively located in the side grooves (7) on the front and rear sides. A plurality of positioning and mounting holes (8) are provided in the side grooves (7). The corners of the rear side of the frame (3) are provided with first connecting grooves (9). The rear edge of the frame (3) is provided with a plurality of second connecting grooves (10). A plurality of fixing blocks (11) are symmetrically provided on both sides of the rear of the frame (3). The front side of the embedded part (2) is provided with a mounting groove (12). The rear side of the embedded part (2) is provided with a plurality of galvanized embedded ribs (13). Adjacent fixing blocks (11) are located in the mounting grooves (12) and are fixedly connected to the embedded part (2) by bolts.

2. The prefabricated building curtain wall according to claim 1, characterized in that: The first connection grooves (9) between the four adjacent groups of splicing units (1) form an angle installation area (14), wherein a connection member (6) is located in the angle installation area (14), and the connection member (6) is fixedly connected to the frame (3) by bolts.

3. The prefabricated building curtain wall according to claim 1, characterized in that: An edge installation area (15) is formed between two adjacent groups of splicing units (1), and one of the connecting pieces (6) is located in the edge installation area (15).

4. The prefabricated building curtain wall according to claim 1, characterized in that: A glass plate (16) is provided inside the outer frame (4) and the inner frame (5), and a plurality of matching holes (17) corresponding to the positions of the mounting holes (8) are provided on the outer frame (4) and the inner frame (5).

5. The prefabricated building curtain wall according to claim 1, characterized in that: The outer side surfaces of adjacent frames (3) are sealed and connected by means of sealant.