Energy-saving stinky tofu marinating device
By designing an energy-saving stinky tofu braised device including a halogen machine, a spray device and a heating device, the problem of resource waste in the existing stinky tofu braised water accelerated fermentation device is solved, efficient heating and spray cleaning is achieved, and production costs and water resources are reduced.
Patent Information
- Application Number
- CN202422023753.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2025-05-27
- Estimated Expiration
- 2034-08-20
AI Technical Summary
现有臭豆腐卤水加速发酵装置存在资源浪费,导致生产成本增加,需要一种能够有效降低资源浪费的节能型臭豆腐卤制装置。
An energy-saving stinky tofu braised device including a halogen machine, a spray device and a heating device is designed to achieve efficient heating of brine through hot water circulation coils and hot water tanks, and spray and clean the hot water from the condensate overflow pipe to reduce water resource waste.
By reducing the overflow waste of hot water condensate, the device reduces the waste of water and steam resources in the production process of stinky tofu, improves production efficiency and product quality, and reduces production costs.
Smart Images

Figure CN222898324U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of stinky tofu brining, in particular to an energy-saving stinky tofu brining device. Background Technique
[0002] Changsha stinky tofu belongs to the slightly fermented type of stinky tofu. Its production process is that the tofu is not fermented, but the brine is fermented, and then the tofu is immersed in the brine for a period of time to be processed into stinky tofu. When fried and eaten, stinky tofu has a unique flavor of "smelling stinky but tasting delicious".
[0003] The stinky brine is one of the core keys to making stinky tofu and cannot be eaten directly. It is generally used to ferment tofu and its related food raw materials to form special stinky foods. However, there are many problems in the fermentation and use process of traditional brine. One of the more important problems is due to the brining temperature. In the prior art, in order to shorten the brining time, the brine is heated. For example, CN210620825U discloses a device for promoting the accelerated fermentation of stinky tofu brine, including a brining machine, the brining machine is connected with a heating device for heating the brine and a circulating device for updating the brine; the heating device includes a hot water circulation coil arranged in the brining machine, the hot water circulation coil is connected with a hot water heating tank, wherein, a connecting bracket is arranged between the hot water circulation coil and the bottom of the brining machine, the hot water circulation coil is a vertical annular basket, and the hot water circulation coil is arranged close to the side wall of the brining machine; the water inlet end of the circulating device is communicated with the bottom of the brining machine, and the water outlet end is communicated with the brining machine. During the use of this device, the condensed water generated by the hot water heating tank is directly discharged, resulting in waste of resources and increasing the production cost of stinky tofu. Therefore, it is urgent to improve the existing device for accelerating the fermentation of stinky tofu brine to further reduce the waste of resources such as water and steam during the stinky tofu brining process. Summary of the Utility Model
[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide an energy-saving stinky tofu brining device with a simple structure and capable of effectively reducing the production cost of stinky tofu.
[0005] The technical solution adopted by the utility model to solve its technical problems is:
[0006] An energy-saving stinky tofu brining device, including a brining machine and a spraying device. The brining machine is connected with a heating device for heating the brine and a circulating device for renewing the brine. The heating device includes a hot water circulation coil and a hot water tank arranged in the brining machine. The water inlet end and the water outlet end of the hot water circulation coil are respectively connected with the water outlet pipe and the water return pipe of the hot water tank. The condensate overflow pipe of the hot water tank is communicated with the main spraying water supply pipe, and the water outlet end of the main spraying water supply pipe is connected with the water inlet of the spraying device. The spraying device is arranged on the spraying section of the brining machine and the drying pool, and is used for cleaning the stinky tofu after brining. The water inlet end of the circulating device is communicated with the bottom brine discharge pipe of the brining machine, and its water outlet end is communicated with the brine inlet pipe of the brining machine.
[0007] The main spraying water supply pipe extends along the inner side wall of the brining machine to the lower part of the spraying device. The outer side wall of the main spraying water supply pipe exposed in the air is coated with a heat insulation layer, which reduces the heat loss when the condensate flows through the main spraying water supply pipe. At the same time, the hot water in the main spraying water supply pipe can further play a role in heating or keeping warm the brine.
[0008] The brining machine includes a feeding section, a brining pool, a spraying section, a drying pool and a discharging section connected in sequence, and a conveyor belt for conveying stinky tofu arranged in each section. A water receiving tray is arranged under the conveyor belt in the feeding section. A plurality of temperature control probes are arranged in the brining pool, and the temperature control probes are electrically connected with a PLC controller. At least two first spraying devices are arranged at intervals on the spraying section. A second spraying device and a bubbling device are arranged near the discharging section of the drying pool. A water receiving and collecting box is arranged between the spraying section and the drying pool.
[0009] The water inlet pipes of the first spraying device and the second spraying device are communicated with the main spraying water supply pipe through a spraying branch pipe with a three-way joint or a connector.
[0010] Both the first spraying device and the second spraying device include a water collecting tank and a spraying guide plate arranged on one side of the water collecting tank. An inlet for communicating with the main spraying water supply pipe is arranged on one side of the water collecting tank.
[0011] The cross section of the spraying guide plate is in an S shape, so that the spraying water in the water collecting tank forms a waterfall-like water flow after flowing out along the spraying guide plate, improving the cleaning effect of the brine on the surface of the stinky tofu.
[0012] The hot water tank includes a tank body, a steam pipe, a water outlet pipe, a water return pipe, a water inlet pipe, and a condensate overflow pipe. The steam pipe is connected to the bottom of the tank body and is located below the water outlet pipe and the water return pipe. The water inlet pipe is arranged at the top of the hot water tank. The condensate overflow pipe is arranged on one side above the water outlet tank. A temperature sensor is arranged inside the hot water tank. Electromagnetic control valves are arranged on the steam pipe, the water outlet pipe, the water return pipe, the water inlet pipe, and the condensate overflow pipe. The temperature sensor and the electromagnetic control valves are electrically connected to a PLC controller. By comparing the temperature detected by the temperature control probe and the temperature sensor received by the PLC controller with the set temperature, and then regulating the electromagnetic control valves on the steam pipe, the water outlet pipe, the water return pipe, the water inlet pipe, and the condensate overflow pipe, the temperature of the brine in the marinating machine can be accurately controlled.
[0013] The circulation device includes a fermentation tank. The water inlet end of the fermentation tank is connected to the brine discharge pipe of the marinating machine through a brine pumping pump, and the water outlet end is connected to the brine inlet pipe of the marinating machine.
[0014] The beneficial effects of the energy-saving stinky tofu marinating device of the present utility model:
[0015] The energy-saving stinky tofu marinating device uses a heating device to heat the brine of the marinating machine, and uses the hot water flowing out from the condensate overflow pipe of the hot water tank for the spray cleaning of the stinky tofu after marinating. It can not only reduce the waste caused by the overflow of condensate water in the hot water tank and reduce the water consumption of the spray device after marinating the stinky tofu, but also further maintain the temperature of the brine in the marinating machine, reduce the temperature difference between the stinky tofu after spray water bath marinating, and thus improve the quality of the stinky tofu.
[0016] At the same time, the hot water circulation coil of the heating device can quickly increase the temperature of the brine. In daily use, the temperature of the hot water tank can be set to 55°C. After the water temperature in the tank reaches the specified temperature, the valve is opened. During and after the use of the brine, it can always maintain 37°C, reducing the marinating time. It can make the marinating time in winter the same as that in summer, shortening by one hour, and at the same time reducing the rest time, from the previous 6 hours of rest to the current 1 hour. Description of the Drawings
[0017] Figure 1 It is a schematic structural diagram of the energy-saving stinky tofu marinating device according to an embodiment of the present utility model;
[0018] Figure 2 It is a schematic structural diagram of the spray device in the energy-saving stinky tofu marinating device according to an embodiment of the present utility model.
[0019] Among them: 1. Circulation device, 11. Fermentation tank, 12. Brine inlet pipe, 13. Brine discharge pipe, 14. Brine pumping water pump, 2. PLC controller, 3. Heating device, 31. Hot water tank, 311. Water inlet pipe, 312. Tank body, 313. Condensate overflow pipe, 314. Temperature sensor, 315. Water outlet pipe, 316. Steam pipe, 317. Return water pipe, 32. Hot water circulation coil, 4. Brine-curing machine, 41. Feeding section, 411. Water receiving tray, 42. Brine-curing pool, 43. Spraying section, 44. Drying pool, 45. Discharging section, 5. Spraying water supply main pipe, 6. Spraying device, 61. First spraying device, 611. Water collecting tank, 612. Spraying guide plate, 6113. Water inlet, 62. Second spraying device, 7. Water receiving and collecting box, 8. Bubbling device. Detailed implementation mode
[0020] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0021] An energy-saving stinky tofu brine-curing device of the present invention includes a brine-curing machine 4 and a spraying device 6. The brine-curing machine 4 is connected with a heating device 3 for heating brine and a circulation device 1 for updating brine; the heating device 3 includes a hot water circulation coil 32 and a hot water tank 31 arranged in the brine-curing machine 4. The water inlet end and the water outlet end of the hot water circulation coil 32 are respectively connected with the water outlet pipe 315 and the return water pipe 317 of the hot water tank 31; the condensate overflow pipe 313 of the hot water tank 31 is communicated with the spraying water supply main pipe 5, and the water outlet end of the spraying water supply main pipe 5 is connected with the water inlet 613 of the spraying device 6; the spraying device 6 is arranged on the spraying section 43 and the drying pool 44 of the brine-curing machine 4 for cleaning the stinky tofu after brine-curing. The water inlet end of the circulation device 1 is communicated with the bottom brine discharge pipe 13 of the brine-curing machine 4, and its water outlet end is communicated with the brine inlet pipe 12 of the brine-curing machine 4.
[0022] The spraying water supply main pipe 5 extends along the inner side wall of the brine-curing machine 4 to the lower part of the spraying device 6, and the outer side wall of the spraying water supply main pipe 5 exposed in the air is coated with a heat insulation coating to reduce the heat loss when the condensate flows through the spraying water supply main pipe 5.
[0023] The brining machine 4 includes a feeding section 41, a brining tank 42, a spraying section 43, an airing tank 44, and a discharging section 45 connected in sequence, as well as conveyor belts arranged in each section for conveying stinky tofu. A water receiving tray 411 is provided below the conveyor belt of the feeding section 41. A plurality of temperature control probes are provided in the brining tank 42, and the temperature control probes are electrically connected to the PLC controller 2. Two first spraying devices 61 are arranged at intervals on the spraying section 43. A second spraying device 62 and a bubbling device 8 are provided near the discharging section 45 in the airing tank 44. A water receiving and collecting box 7 is provided between the spraying section 43 and the airing tank 44.
[0024] The water inlet pipes 311 of the first spraying device 61 and the second spraying device 62 are communicated with the spraying water supply main pipe 5 through spraying branch pipes with three-way joints or adapters.
[0025] Both the first spraying device 61 and the second spraying device 62 include a water collecting tank 611 and a spraying diversion plate 612 arranged on one side of the water collecting tank 611. A water inlet 613 communicated with the spraying water supply main pipe 5 is provided on one side of the water collecting tank 611.
[0026] The cross-section of the spraying diversion plate 612 is in an S shape, so that the spraying water in the water collecting tank 611 forms a waterfall-like water flow after flowing out through the spraying diversion plate 612, improving the cleaning effect of the brine on the surface of the stinky tofu.
[0027] The hot water tank 31 includes a tank body 312, a steam pipe 316, a water outlet pipe 315, a water return pipe 317, a water inlet pipe 311, and a condensate overflow pipe 313. The steam pipe 316 is communicated with the bottom of the tank body 312 and is located below the water outlet pipe 315 and the water return pipe 317. The water inlet pipe 311 is arranged at the top of the hot water tank 31. The condensate overflow pipe 313 is arranged on one side above the water outlet tank. A temperature sensor 314 is provided inside the hot water tank 31. Electromagnetic control valves are provided on the steam pipe 316, the water outlet pipe 315, the water return pipe 317, the water inlet pipe 311, and the condensate overflow pipe 313. The temperature sensor 314 and the electromagnetic control valves are electrically connected to the PLC controller 2. By comparing the temperatures detected by the temperature control probes and the temperature sensor 314 received by the PLC controller 2 with the set temperature, and then, the electromagnetic control valves on the steam pipe 316, the water outlet pipe 315, the water return pipe 317, the water inlet pipe 311, and the condensate overflow pipe 313 are adjusted, so as to accurately control the temperature of the brine in the brining machine 4.
[0028] The circulation device 1 includes a fermentation tank 11. The water inlet end of the fermentation tank 11 is connected to the brine discharge pipe 13 of the brining machine 4 through a brine pumping pump 14, and the water outlet end is connected to the brine inlet pipe 12 of the brining machine 4.
[0029] Among them, the hot water circulation coil 32 can be set with reference to the prior art. For example, the solution disclosed in CN201921411941.9, an apparatus for accelerating the fermentation of stinky tofu brine, is adopted: "A connecting bracket is provided between the hot water circulation coil 32 and the bottom of the brine cooker 4. The hot water circulation coil 32 is a vertical annular basket, and the hot water circulation coil 32 is arranged close to the side wall of the brine cooker 4." Or the hot water circulation coil 32 is horizontally arranged at the bottom of the brine cooker 4, and the hot water circulation coil 32 is distributed in a structure of a figure-eight shape, multiple U-shapes or mosquito coil shapes.
[0030] The working principle and usage method of the present utility model:
[0031] For the energy-saving stinky tofu brine cooker of the present utility model, the steam in the steam pipe 316 is used to heat the water in the hot water tank 31 to a set temperature. The hot water enters the hot water circulation coil 32 through the water outlet pipe 315 to heat the brine in the brine cooker 4, and then flows back to the hot water tank 31 through the water return pipe 317 for recycling. The condensed water in the hot water tank 31 enters the spray water supply main pipe 5 through the condensed water overflow pipe 313. The spray water supply main pipe 5 extends along the inner side wall of the brine cooker 4 to the lower part of the spray device 6, which can heat or keep warm the brine in the brine cooker 4, and then the spray device 6 sprays and cleans the stinky tofu after brining, thereby reducing the water consumption and production energy consumption during the stinky tofu brining process, and improving the quality of stinky tofu by reducing the temperature difference between the spray water and the stinky tofu after brining.
[0032] For the energy-saving stinky tofu brine cooker of the present utility model, the number of the first spray device 61 and the second spray device 62 arranged in the spray section 43 of the brine cooker 4 can be adjusted according to the spray requirements. For example, 3 first spray devices 61 are arranged at intervals on the spray section 43, and 2 second spray devices 62 are arranged at intervals near the discharging section 45 of the drying pool 44. Those skilled in the art can understand and implement the changes of the above technical features through the written description, so no additional drawings will be given for illustration.
[0033] Finally, it should be noted that: the above are only the preferred embodiments of the present utility model, which are only used to illustrate the technical solutions of the present utility model and are not used to limit the protection scope of the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present utility model are all included in the protection scope of the present utility model.
Claims
1. An energy-saving stinky tofu stewing device, characterized in that: The invention comprises a braising machine (4) and a spraying device (6); the braising machine (4) is connected to a heating device (3) for heating brine and a circulation device (1) for renewing brine; the heating device (3) comprises a hot water circulation coil (32) and a hot water tank (31) arranged in the braising machine (4); the water inlet end and the water outlet end of the hot water circulation coil (32) are respectively connected to the water outlet pipe (315) and the water return pipe (317) of the hot water tank (31); the hot water tank (31 ) is connected to the spray water supply pipe (5), and the water outlet end of the spray water supply pipe (5) is connected to the water inlet of the spray device (6); the spray device (6) is arranged on the spray section (43) and the drying pool (44) of the braising machine (4) and is used to clean the stinky tofu after braising; the water inlet end of the circulation device (1) is connected to the bottom brine discharge pipe (13) of the braising machine (4), and the water outlet end thereof is connected to the brine inlet pipe (12) of the braising machine (4).
2. The energy-saving stinky tofu stewing device according to claim 1, characterized in that: The spray water supply pipe (5) extends along the inner wall of the marinating machine (4) to below the spray device (6), and the outer wall of the spray water supply pipe (5) exposed to the air is coated with a heat insulation coating.
3. The energy-saving stinky tofu stewing device according to claim 1, characterized in that: The braising machine (4) comprises a feeding section (41), a braising pool (42), a spraying section (43), a spreading pool (44) and a discharging section (45) which are connected in sequence, and a conveyor belt arranged in each section for conveying stinky tofu. A water receiving tray (411) is arranged below the conveyor belt of the feeding section (41). A plurality of temperature control probes are arranged in the braising pool (42), and the temperature control probes are electrically connected to a PLC controller (2). At least two first spray devices (61) are arranged at intervals on the spraying section (43). A second spray device (62) and a bubbling device (8) are arranged in the spreading pool (44) near the discharging section (45). A water collecting box (7) is arranged between the spraying section (43) and the spreading pool (44).
4. The energy-saving stinky tofu stewing device according to claim 3, characterized in that: The water inlet pipes (311) of the first spray device (61) and the second spray device (62) are connected to the spray water supply main pipe (5) via a spray branch pipe with a tee or an adapter.
5. The energy-saving stinky tofu stewing device according to claim 3, characterized in that: The first spray device (61) and the second spray device (62) both comprise a water collecting box (611) and a spray guide plate (612) arranged on one side of the water collecting box (611); one side of the water collecting box (611) is provided with a water inlet (613) connected to a spray water supply main pipe (5).
6. The energy-saving stinky tofu stewing device according to claim 5, characterized in that: The cross section of the spray guide plate (612) is S-shaped.
7. The energy-saving stinky tofu stewing device according to claim 1, characterized in that: The hot water tank (31) comprises a tank body (312), a steam pipe (316), a water outlet pipe (315), a water return pipe (317), a water inlet pipe (311) and a condensed water overflow pipe (313); the steam pipe (316) is connected to the bottom of the tank body (312) and is located below the water outlet pipe (315) and the water return pipe (317); the water inlet pipe (311) is arranged at the top of the hot water tank (31); the condensed water overflow pipe (313) is arranged on one side above the water outlet tank; a temperature sensor (314) is arranged inside the hot water tank (31); and electromagnetic control valves are arranged on the steam pipe (316), the water outlet pipe (315), the water return pipe (317), the water inlet pipe (311) and the condensed water overflow pipe (313); the temperature sensor (314) and the electromagnetic control valve are electrically connected to the PLC controller (2).