Modularized metal decorative curtain wall and tool
Through the modular design and the use of tooling modules, the problems of low efficiency and unstable quality of traditional box metal decorative lines are solved, and the prefabricated and efficient installation of metal decorative modules are realized, avoiding mutual interference and constraints with the installation of glass curtain walls.
Patent Information
- Application Number
- CN202420842103.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2025-05-30
- Estimated Expiration
- 2034-04-23
AI Technical Summary
There are many work contents for on-site production and installation of traditional box metal decorative lines, the workers have high work intensity and low installation efficiency. The installation quality is unstable due to human factors, and there are problems of mutual interference and constraints with the installation of glass curtain walls.
It provides a modular metal decorative curtain wall and tooling, including metal decorative modules and tooling modules. The metal decorative module consists of keel components, sealing components, connection codes and hanging codes. The tooling module includes a base and mounting frame, which is prefabricated in the factory through modular design to reduce on-site production and installation work.
The prefabrication of metal decorative modules has been realized, which significantly improves installation efficiency, reduces the influence of human factors, improves installation quality, avoids mutual interference and constraints with glass curtain wall installation, and is in line with the development trend of building industrialization.
Smart Images

Figure CN222923968U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of curtain wall decoration, and particularly relates to a modular metal decorative curtain wall and tooling. Background Art
[0002] In modern architecture, glass curtain walls have become an important carrier for the display of the facade form and visual effect of public buildings, especially super high-rise buildings, due to their advantages such as light self-weight, good permeability and daylighting. With the pursuit of personalized characteristics of buildings, the glass curtain wall facade is no longer single and pure, and various decorative components of different materials and shapes are widely used. Among them, box-shaped lattice metal decorative strips are widely used. On the one hand, since the box-shaped lattice metal decorative strips are suspended outside the glass curtain wall, the in-air installation operation is difficult, resulting in high labor intensity of workers and low installation efficiency. The installation quality is unstable due to the influence of human factors, and there are mutual interference and constraints in the installation processes of the box-shaped lattice metal decorative strips and the glass curtain wall. On the other hand, the trend of building industrialization is obvious, and the manufacturing and processing links of factory prefabricated decorative strips are particularly important. Content of the Utility Model
[0003] The purpose of the utility model is: aiming at the deficiencies in the above background art, to provide a modular solution to solve the problems of a large amount of on-site production and installation work content of traditional box-shaped metal decorative strips, high labor intensity of workers, low installation efficiency, and unstable installation quality affected by human factors; at the same time, it can also solve the technological problems such as mutual interference and constraints during the installation of box-shaped metal decorative strips and glass curtain walls.
[0004] To achieve the above purpose, the utility model provides a modular metal decorative curtain wall and tooling, including a metal decoration module and a tooling module;
[0005] The metal decoration module includes a keel assembly, a sealing plate assembly, a connecting code, and a hanging code; the keel assembly includes a cross bar and a vertical bar, the cross bar and the vertical bar form a frame structure, the sealing plate assembly includes a plurality of sealing plates, and the sealing plates are arranged on the outer surface of the frame structure to form a sealing structure; the connecting code is connected to the keel assembly, the hanging code is connected to the connecting code, and the hanging code is provided with a hanging point;
[0006] The tooling module includes a base and an installation frame, the installation frame is connected to the base, screw holes are formed in the installation frame for installing hanging screws and hanging nuts, and the hanging point of the hanging code can be hung on the hanging screw.
[0007] Further, the keel assembly includes two end rectangular frames, the end rectangular frames are composed of a front vertical bar, a rear vertical bar and an end cross bar, and the end rectangular frames are connected by long cross bars to form a box-shaped frame.
[0008] Further, the sealing plates include a front sealing plate, a rear sealing plate, a left sealing plate, a right sealing plate, an upper sealing plate and a lower sealing plate. A glue seam is left between two adjacent sealing plates to fill with sealant for internal sealing.
[0009] Further, a plurality of screw holes are vertically formed in the mounting frame.
[0010] Further, the mounting frame includes a bottom beam, a vertical beam and an inclined beam. The bottom beam is horizontally arranged, the vertical beam is vertically arranged and its bottom is connected to the bottom beam, the inclined beam is obliquely arranged and its two ends are respectively connected to the bottom beam and the vertical beam. The screw holes are formed in the vertical beam.
[0011] Further, a guide rail groove is arranged on the base, a guide installation hole is arranged on the bottom beam, a guide installation bolt is inserted in the guide installation hole, the bottom end of the guide installation bolt is connected with a guide block, the guide block is slidably arranged in the guide rail groove, and the top end of the guide installation bolt passes upward through the guide installation hole and is provided with a guide installation nut.
[0012] Further, the guide rail groove and the guide block are arranged in a dovetail shape or an inverted T-shaped fit.
[0013] The above solution of the present utility model has the following beneficial effects:
[0014] The modular metal decorative curtain wall and tooling provided by the present utility model realize the prefabrication of metal decorative modules in the factory, fully reduce the on-site fabrication and installation work content, significantly improve the installation efficiency, and are less affected by human factors and have stable installation quality, meeting the development trend of building industrialization; during subsequent on-site operations, it effectively avoids problems such as mutual interference and restriction in the installation processes between box-shaped lattice metal decorative lines and glass curtain walls and the easy burning of glass panels during on-site welding of keels in traditional processes;
[0015] Other beneficial effects of the present utility model will be described in detail in the subsequent specific implementation part. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a schematic diagram of the overall structure of the present utility model;
[0017] Figure 2 is a schematic diagram of the keel assembly of the present utility model;
[0018] Figure 3 is a schematic diagram of the inside of the metal decorative module of the present utility model;
[0019] Figure 4 is a schematic diagram of the sealing plate assembly of the present utility model;
[0020] Figure 5 Schematic diagram of the installation of the keel component of the present utility model on the tooling module;
[0021] Figure 6 Schematic diagram of the completion of the installation of the metal decoration module on the tooling module of the present utility model.
[0022]
Description of the reference numerals
[0023] 1 - Front vertical pole; 2 - Rear vertical pole; 3 - End cross bar; 4 - Long cross bar; 5 - Front sealing plate; 6 - Rear sealing plate; 7 - Left sealing plate; 8 - Right sealing plate; 9 - Upper sealing plate; 10 - Lower sealing plate; 11 - Glue joint; 12 - Connection code; 13 - Hanging code; 14 - Base; 15 - Mounting frame; 16 - Screw hole; 17 - Hanging screw; 18 - Guide rail groove; 19 - Guide installation bolt; 20 - Guide block; 21 - Guide installation nut. Detailed implementation manners
[0024] To facilitate the understanding of the present application, the present application will be described more comprehensively below with reference to the relevant drawings. The preferred embodiments of the present application are shown in the drawings. However, the present application can be implemented in many other different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure content of the present application more thorough and comprehensive.
[0025] It should be noted that when an element is referred to as "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0026] It should be understood that the orientation or positional relationship indicated by the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present application.
[0027] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the quantity of the indicated technical features. Thus, the features defined with "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the present application, "a plurality" means two or more unless otherwise specifically defined.
[0028] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field to which this application belongs.
[0029] As Figures 1-4 shown, an embodiment of the present utility model provides a modular metal decorative curtain wall and a tooling, including a metal decorative module and a tooling module. Among them, the metal decorative module is composed of a keel assembly and a sealing plate assembly. In this embodiment, the metal decorative module is box-shaped, so the keel assembly adopts two end rectangular frames, and the end rectangular frame is composed of a front vertical rod 1, a rear vertical rod 2 and an end cross rod 3, and then the two end rectangular frames are connected into a box-shaped frame by a long cross rod 4.
[0030] The sealing plate assembly includes a plurality of aluminum sealing plates, which are used to enclose and seal the outer surface of the keel assembly of each metal decorative module. Based on the box-shaped metal decorative module, the sealing plates sequentially include a front sealing plate 5, a rear sealing plate 6, a left sealing plate 7, a right sealing plate 8, an upper sealing plate 9 and a lower sealing plate 10. Among them, a glue joint 11 is left between two adjacent sealing plates to fill sealant to seal the inside of the metal decorative module and prevent dust, rainwater, etc. from entering the inside. It should be noted that in order to avoid the joints between the sealing plates at the corners and improve the convenience of installing the sealing plates, not all the sealing plates are flat structures. Among them, the four sides of the front sealing plate 5 and the rear sealing plate 6 are provided with vertical extension edges, the upper sealing plate 9 and the lower sealing plate 10 are provided with vertical extension edges on the left and right sides, and the left sealing plate 7 and the right sealing plate 8 are flat structures. Each sealing plate also has an installation folding edge at the joint and is fastened to the keel assembly by angle codes arranged at intervals.
[0031] In addition, the metal decorative module also includes a connecting code 12 and a hanging code 13. The vertical rod at the rear of the keel assembly is detachably connected to the connecting code 12 by bolts. In this embodiment, the connecting code 12 is set to be L-shaped for easy connection with the corresponding vertical rod. At the same time, a corresponding slot is opened on the rear sealing plate 6 so that the connecting code 12 can extend to the outside of the metal decorative module from the slot position. Of course, the slot position will be sealed with sealant later to ensure the overall sealing effect. The outer end of the connecting code 12 is connected to the hanging code 13, and the hanging code 13 is used to hang on a transfer structure connected to the column, so a hanging point is provided on the hanging code.
[0032] In this embodiment, the tooling module includes a base 14 and an installation frame 15. Among them, the base 14 supports the installation frame 15, and the installation frame 15 is used to suspend and support the metal decorative module so that the sealing plates and sealant of the metal decorative module can be installed reliably and conveniently. Since the hanging code 13 on the metal decorative module has a hanging point, screw holes 16 are opened on the installation frame 15. The hanging screw 17 passes through the screw holes 16 and is fixed by a hanging nut, and the hanging screw 17 supports at the hanging point position to support the hanging code 13, thereby suspending and supporting the entire metal decorative module.
[0033] As a preferred embodiment, in this embodiment, a plurality of screw holes 16 are provided on the mounting frame 15, which not only adapt to the double hanging points of the hanging code 13, but also can adjust the hanging position of the hanging code 13 to adapt to metal decorative modules of different sizes.
[0034] As a preferred embodiment, in this embodiment, the mounting frame 15 includes a bottom beam, a vertical beam and an inclined beam. The bottom beam is horizontally arranged, the vertical beam is vertically arranged and its bottom is fixedly connected to the bottom beam, and the inclined beam is inclined and its two ends are respectively connected to the bottom beam and the vertical beam to support the vertical beam and ensure the stability of the entire mounting frame 15. Among them, the screw holes 16 are provided on the vertical beam.
[0035] Since the metal decorative module has various size specifications, that is, the distance between the two end rectangular frames changes, and the connection code 12 and the hanging code 13 are arranged on the rear vertical rod 2 of the end rectangular frame. To enable the mounting frame 15 to adapt to metal decorative modules of different size specifications, in this embodiment, the mounting frame 15 is adopted to be able to adjust its position relative to the base 14. Specifically, a guide rail groove 18 is provided on the base 14, a guide installation hole is provided on the bottom beam, a guide installation bolt 19 is inserted into the guide installation hole, one end of the guide installation bolt 19 is connected to a guide block 20, the guide block 20 is slidably arranged in the guide rail groove 18, and the other end of the guide installation bolt 19 passes upward through the guide installation hole and a guide installation nut 21 is provided. Preferably, the guide rail groove 18 and the guide block 20 are arranged in a dovetail shape or an inverted T shape for mating to further improve the stability of the mounting frame 15.
[0036] When arranging the mounting frame 15, after fixing the guide block 20 relative to the mounting frame 15, let the guide block 20 enter from the end of the guide rail groove 18, then adjust to the corresponding position and keep a corresponding distance between the two mounting frames 15 to adapt to metal decorative modules of different sizes, and then lock the guide installation nut 21.
[0037] Adopting the solution provided by this embodiment, the metal decorative module is prefabricated in the factory. Please refer to Figure 5 、 Figure 6 . First, complete the cutting and welding of the keel into a box-shaped frame, and open mounting holes for bolts at the corresponding positions of the vertical rods; then sequentially install the connection code 12, the rear sealing plate 6, and the hanging code 13 on the box-shaped frame and fix them; fine-tune the distance between the mounting frames 15 again according to the left and right widths, and after adjusting in place, tighten the guide installation nut 21; select appropriate screw holes 16 according to the height of the metal decorative module and the convenience of personnel operation and install the hanging screws 17; hang the metal decorative module on the mounting frame 15.
[0038] Then, install other cover plates, apply sealant at the sealant joint 11 of the cover plate, and install the rubber strip installation grooves and rubber strips on the left and right sides of the metal decoration module. Remove the metal decoration module to form a unit finished product. The hanging screw 17 can be left on the mounting bracket 15, and only the position needs to be adjusted during the next operation. When assembly line operation is required, the base 14 can be made to a certain length, and multiple mounting brackets 15 are arranged thereon to achieve simultaneous operation of multiple workstations.
[0039] In summary, the solution provided in this embodiment realizes the prefabrication of the metal decoration module in the factory, fully reduces the on-site fabrication and installation work content, significantly improves the installation efficiency, is less affected by human factors, and has stable installation quality, which conforms to the development trend of building industrialization; during subsequent on-site operations, it effectively avoids problems such as mutual interference and restriction in the installation process between the box-shaped lattice metal decoration line and the glass curtain wall, and the problem that the keel is easily welded on-site and burns the glass panel in the traditional process.
[0040] The technical features of the above embodiments can be combined arbitrarily. For the sake of concise description, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, it should be considered as the scope described in this specification.
[0041] The above embodiments only represent several implementation manners of the present application, and the description thereof is relatively specific and detailed, but it should not be construed as a limitation on the scope of the application. It should be noted that for those of ordinary skill in the art, without departing from the concept of the present application, several modifications and improvements can still be made, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application should be subject to the appended claims.
Claims
1. A modular metal decorative curtain wall and tooling, characterized in that: Including metal decoration module and tooling module; The metal decoration module comprises a keel assembly, a sealing plate assembly, a connection code (12), and a hanging code (13); the keel assembly comprises a crossbar and a vertical bar, the crossbar and the vertical bar form a frame structure, the sealing plate assembly comprises a plurality of sealing plates, the sealing plates are arranged on the outer surface of the frame structure to form a sealing structure; the connection code (12) is connected to the keel assembly, the hanging code (13) is connected to the connection code (12), and the hanging code (13) is provided with a hanging point; The tooling module comprises a base (14) and a mounting frame (15), wherein the mounting frame (15) is connected to the base (14), and a screw hole (16) is provided on the mounting frame (15), wherein the screw hole (16) is used to install a hanging screw (17) and a hanging nut, and the hanging point of the hanging code (13) can be hung on the hanging screw (17).
2. A modular metal decorative curtain wall and tooling according to claim 1, characterized in that: The keel assembly comprises two end rectangular frames, each of which is composed of a front upright bar (1), a rear upright bar (2) and an end cross bar (3). The end rectangular frames are connected to form a box-type frame via a long cross bar (4).
3. A modular metal decorative curtain wall and tooling according to claim 2, characterized in that: The sealing plates include a front sealing plate (5), a rear sealing plate (6), a left sealing plate (7), a right sealing plate (8), an upper sealing plate (9) and a lower sealing plate (10), and a glue gap (11) is left between two adjacent sealing plates to fill with sealant for internal sealing.
4. A modular metal decorative curtain wall and tooling according to claim 1, characterized in that: The mounting frame (15) is provided with a plurality of screw holes (16) in the vertical direction.
5. A modular metal decorative curtain wall and tooling according to claim 1, characterized in that: The mounting frame (15) comprises a bottom beam, a vertical beam and an inclined beam, wherein the bottom beam is arranged horizontally, the vertical beam is arranged vertically and the bottom is connected to the bottom beam, the inclined beam is arranged obliquely and the two ends are respectively connected to the bottom beam and the vertical beam, and the screw hole (16) is provided on the vertical beam.
6. A modular metal decorative curtain wall and tooling according to claim 5, characterized in that: The base (14) is provided with a guide rail groove (18), the bottom beam is provided with a guide mounting hole, a guide mounting bolt (19) is inserted into the guide mounting hole, the bottom end of the guide mounting bolt (19) is connected to a guide block (20), the guide block (20) is slidably arranged in the guide rail groove (18), and the top end of the guide mounting bolt (19) is passed upward from the guide mounting hole and is provided with a guide mounting nut (21).
7. A modular metal decorative curtain wall and tooling according to claim 6, characterized in that: The guide rail groove (18) and the guide block (20) are arranged to be matched in a dovetail shape or an inverted T shape.