River channel construction structure of geosynthetic clay liner
By setting up anchor grooves and concrete bases on both sides of the main body of the river foundation, and installing fixing nails and rivets on them, combining inclined plates and nonwoven geotextiles, the problem of unstable fixation of bentonite waterproof blankets is solved, and higher waterproof quality is achieved.
Patent Information
- Application Number
- CN202422188255.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2025-06-10
- Estimated Expiration
- 2034-09-06
AI Technical Summary
The existing bentonite waterproof blanket technology has unstable fixation, causing the waterproof blanket to slide or fall off, which affects the waterproof quality after the finished product.
By setting anchor grooves on both sides of the main body of the river foundation and installing fixing nails and rivets on the concrete base and connecting rods, combining inclined plates and nonwoven geotextiles, firm fixing of the bentonite waterproof blanket is achieved.
It effectively avoids the problem of sliding or falling off of the waterproof blanket, improves the connection stability of the waterproof blanket, and thus improves the waterproof quality after the finished product.
Smart Images

Figure CN222961972U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bentonite waterproof blankets, and specifically relates to a river construction structure of a bentonite waterproof blanket. Background Technique
[0002] The application of bentonite waterproof blankets in civil engineering such as water conservancy, environmental protection, transportation, railway, and civil aviation is becoming more and more extensive, and their unique anti-seepage performance has been highly recognized in the industry.
[0003] For example, the publication number is CN210216317U, and the Chinese authorized patent name is (A Water Storage Type Ecological Bottom Protection), including: loam, bentonite waterproof blanket, gabion cage, and ecological sand. The loam includes a lower loam layer and a loam protection layer, and the lower loam layer is laid on the original soil; the bentonite waterproof blanket is laid on the lower loam layer; a loam protection layer is laid on the bentonite waterproof blanket, a gravel cushion layer is laid on the loam protection layer, the gabion cage is laid on the gravel cushion layer, the upper surface of the gabion cage includes two parts, a bottom plane and a slope plane, the ecological sand is laid on the bottom plane, and the upper soil layer is laid on the surface of the slope plane. The bentonite waterproof blanket uses natural inorganic materials as the main anti-seepage material, with strong waterproofness, durability, and self-repair ability; the gabion cage has excellent anti-scouring performance and is convenient for construction; the loam protection layer improves the anti-seepage effect and protects the bentonite waterproof blanket from damage; the ecological sand can retain the river's own ecological environment, enhance the natural characteristics after river regulation, and at the same time purify water quality and conserve water sources.
[0004] However, the existing bentonite waterproof blanket technology has the problem of unstable fixation, resulting in the sliding or falling off of the waterproof blanket, thus affecting the waterproof quality of the finished product; therefore, it does not meet the existing requirements, and for this reason, we propose a river construction structure of a bentonite waterproof blanket. Content of the Utility Model
[0005] The purpose of the utility model is to provide a river construction structure of a bentonite waterproof blanket to solve the problem in the above background technique that the existing bentonite waterproof blanket technology has unstable fixation, resulting in the sliding or falling off of the waterproof blanket, thus affecting the waterproof quality of the finished product.
[0006] To achieve the above purpose, the utility model provides the following technical solution: A river construction structure of a bentonite waterproof blanket, including: a river foundation main body, anchor trenches are arranged inside the upper parts on both sides of the river foundation main body, first bentonite waterproof blankets are arranged on both sides of the inner wall of the river foundation main body, and there are two first bentonite waterproof blankets, and a second bentonite waterproof blanket is arranged on the lower end surface of the inner wall of the river foundation main body;
[0007] It further includes:
[0008] Concrete pedestals are installed inside both sides of the main body of the river channel foundation. There are two concrete pedestals, and both of the two concrete pedestals are integrally formed by inlay casting with the inside of both sides of the main body of the river channel foundation. Concrete connecting rods are arranged inside both of the two concrete pedestals, and the first bentonite waterproof blanket is fixed to the upper end face of the concrete connecting rod by first fixing nails;
[0009] Rivets are installed below the inside of the main body of the river channel foundation. There are several rivets, and inclined plates are arranged on both the left and right sides of the outer walls of the several rivets.
[0010] Preferably, a groove cavity is arranged inside the end face of the second bentonite waterproof blanket, a fourth fixing nail is arranged inside the groove cavity, the lower end head of the fourth fixing nail penetrates and extends into the inside of the rivet, and the lower end head of the fourth fixing nail is in interference connection with the inside of the rivet.
[0011] Preferably, one ends of the two first bentonite waterproof blankets both cover the upper side of the second bentonite waterproof blanket.
[0012] Preferably, one ends of the two first bentonite waterproof blankets are installed at both ends of the second bentonite waterproof blanket and are fixedly connected to the main body of the river channel foundation by third fixing nails.
[0013] Preferably, the other ends of the two first bentonite waterproof blankets extend into the inside of the anchorage trench, and the other ends of the two first bentonite waterproof blankets are fixedly connected to the main body of the river channel foundation by second fixing nails.
[0014] Preferably, non-woven geotextiles are arranged on the lower sides inside both the two first bentonite waterproof blankets and the second bentonite waterproof blanket, HDPE films are arranged on both sides of the outer wall of the non-woven geotextile, sodium-based bentonite is arranged on the upper side of the non-woven geotextile, and a plastic flat wire woven geotextile is arranged on the upper side of the sodium-based bentonite.
[0015] Compared with the prior art, the beneficial effects of the utility model are:
[0016] 1. In the present utility model, when laying the waterproof blanket on the main body 100 of the river channel foundation through the provided rivets, inclined plates, fourth fixing nails, concrete bases, concrete connecting rods and first fixing nails, first lay the concave areas in the main body 100 of the river channel foundation. Before laying, first install the rivets 109 and the inclined plates 110 inside the foundation, then lay the second bentonite waterproof blanket 300 flat in the middle position of the main body 100 of the river channel foundation. After laying flat, pass the fourth fixing nail 108 from the upper end face to the lower end face of the second bentonite waterproof blanket 300, so that the fourth fixing nail 108 is interference-connected with the rivet 109, thereby fixing the second bentonite waterproof blanket 300. The position can be effectively fixed and strengthened by the inclined plate 110 on the outer wall of the rivet 109. When the position of the second bentonite waterproof blanket 300 moves, the set inclined plate 110 will tilt more and more into the riverbed with the angle, so as to be stable; pour the concrete base 102 inside both sides of the main body 100 of the river channel foundation, and then pour the concrete connecting rod 10201 on the inner wall of the concrete base 102, so that when the first bentonite waterproof blanket 200 is installed on both sides of the main body 100 of the river channel foundation, there are firm fixing points, effectively avoiding the problem that the existing bentonite waterproof blanket technology has unstable fixation, resulting in the sliding or falling off of the waterproof blanket, thus affecting the waterproof quality of the finished product.
[0017] 2. By providing the anchorage grooves inside the upper parts on both sides of the main body of the river channel foundation, and fixing the upper end of the first bentonite waterproof blanket with the second fixing nails, the connection stability of one side of the first bentonite waterproof blanket is effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 is the overall structural schematic diagram of the present utility model;
[0019] Figure 2 is the schematic diagram of the internal structure embedded in the concrete base of the present utility model;
[0020] Figure 3 is the schematic diagram of the internal structure of the bentonite waterproof blanket of the present utility model;
[0021] Figure 4 is the partial structural schematic diagram of the rivet of the present utility model;
[0022] Figure 5 is the schematic diagram of the internal structure at position A of the present utility model;
[0023] Figure 6 is the schematic diagram of the internal structure at position B of the present utility model;
[0024] In the figure: 100, the main body of the river channel foundation; 101, the first fixing nail; 102, the concrete base; 10201, the concrete connecting rod; 103, the anchorage groove; 105, the second fixing nail; 106, the third fixing nail; 107, the groove cavity; 108, the fourth fixing nail; 109, the rivet; 110, the inclined plate; 200, the first bentonite waterproof blanket; 201, the HDPE film; 202, the non-woven geotextile; 203, the sodium-based bentonite; 204, the plastic flat wire woven geotextile; 300, the second bentonite waterproof blanket. Detailed implementation mode
[0025] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments.
[0026] Embodiment 1
[0027] Please refer to Figure 1-6 , an embodiment provided by the present invention: a river channel construction structure of a bentonite waterproof blanket, including: the main body 100 of the river channel foundation, anchorage grooves 103 are arranged inside the upper parts on both sides of the main body 100 of the river channel foundation, and the first bentonite waterproof blankets 200 are arranged on both sides of the inner wall of the main body 100 of the river channel foundation, and there are two first bentonite waterproof blankets 200, and the second bentonite waterproof blanket 300 is arranged on the lower end surface of the inner wall of the main body 100 of the river channel foundation;
[0028] It also includes:
[0029] The concrete base 102, which is installed inside both sides of the main body 100 of the river channel foundation, there are two concrete bases 102, and both of the two concrete bases 102 are integrally formed by inlaying and pouring with the inside of both sides of the main body 100 of the river channel foundation. Concrete connecting rods 10201 are arranged inside both of the two concrete bases 102, and the first bentonite waterproof blanket 200 is fixed on the upper end surface of the concrete connecting rod 10201 through the first fixing nail 101;
[0030] The rivets 109, which are installed below the inside of the main body 100 of the river channel foundation, there are several rivets 109, and inclined plates 110 are arranged on the left and right sides of the outer walls of several rivets 109.
[0031] When laying the waterproof blanket on the main body 100 of the riverbed foundation, first lay it in the depressions in the main body 100 of the riverbed foundation. Before laying, first install the rivets 109 and the inclined plates 110 inside the foundation, and then lay the second bentonite waterproof blanket 300 flat in the middle of the main body 100 of the riverbed foundation. After laying, pass the fourth fixing nails 108 from the upper end face to the lower end face of the second bentonite waterproof blanket 300, so that the fourth fixing nails 108 are interference-connected with the rivets 109, thereby fixing the second bentonite waterproof blanket 300. Pour the concrete base 102 inside both sides of the main body 100 of the riverbed foundation, and then pour the concrete connecting rod 10201 on the inner wall of the concrete base 102, so that when the first bentonite waterproof blanket 200 is installed on both sides of the main body 100 of the riverbed foundation, there are firm fixing points.
[0032] Embodiment 2
[0033] Please refer to Figure 1 , a groove cavity 107 is arranged inside the end face of the second bentonite waterproof blanket 300, a fourth fixing nail 108 is arranged inside the groove cavity 107, the lower end head of the fourth fixing nail 108 penetrates and extends into the inside of the rivet 109, and the lower end head of the fourth fixing nail 108 is interference-connected with the inside of the rivet 109. One ends of the two first bentonite waterproof blankets 200 both cover the upper end of the second bentonite waterproof blanket 300.
[0034] The connection between the fourth fixing nail 108 and the rivet 109 firmly fixes the position of the second bentonite waterproof blanket 300.
[0035] Please refer to Figure 1 , one ends of the two first bentonite waterproof blankets 200 are installed at both ends of the second bentonite waterproof blanket 300 and are fixedly connected to the main body 100 of the riverbed foundation through the third fixing nails 106. The other ends of the two first bentonite waterproof blankets 200 extend into the inside of the anchorage trench 103, and the other ends of the two first bentonite waterproof blankets 200 are fixedly connected to the main body 100 of the riverbed foundation through the second fixing nails 105.
[0036] The other end of the first bentonite waterproof blanket 200 extends into the inside of the anchorage trench 103, so that when the first bentonite waterproof blanket 200 is laid on the slope, the position of one end can be firmly fixed.
[0037] Please refer to Figure 3 , non-woven geotextiles 202 are arranged on the lower sides inside the two first bentonite waterproof blankets 200 and the second bentonite waterproof blanket 300. HDPE films 201 are arranged on both sides of the outer wall of the non-woven geotextiles 202. Sodium bentonite 203 is arranged on the upper side of the non-woven geotextiles 202, and plastic flat wire woven geotextiles 204 are arranged on the upper side of the sodium bentonite 203.
[0038] When bentonite particles encounter water, they can adsorb water equivalent to five times their own weight, and the volume expands to more than 15 - 17 times the original. This expansion effect forms a high-density diaphragm, providing extremely low water permeability.
[0039] Working principle: When laying the waterproof blanket on the main body 100 of the river channel foundation, first lay the depressions in the main body 100 of the river channel foundation. Before laying, first install the rivets 109 and the inclined plates 110 inside the foundation, then lay the second bentonite waterproof blanket 300 flat in the middle position of the main body 100 of the river channel foundation. After laying, pass the fourth fixing nail 108 from the upper end face to the lower end face of the second bentonite waterproof blanket 300, so that the fourth fixing nail 108 is interference-connected with the rivet 109 to fix the second bentonite waterproof blanket 300. Then lay the first bentonite waterproof blanket 200. One end of each of the two first bentonite waterproof blankets 200 covers the end face of the second bentonite waterproof blanket 300, and then fix it with the third fixing nail 106. At the same time, pour the concrete base 102 inside both sides of the main body 100 of the river channel foundation, and then pour the concrete connecting rod 10201 on the inner wall of the concrete base 102, so that when the first bentonite waterproof blanket 200 is installed on both sides of the main body 100 of the river channel foundation, there are firm fixing points. The other ends of the two first bentonite waterproof blankets 200 are installed inside the anchor trench 103 and fixed in position with the second fixing nail 105. After the first bentonite waterproof blanket 200 and the second bentonite waterproof blanket 300 are laid, lay a layer of yellow mud on top of them.
[0040] For those skilled in the art, it is obvious that the present utility model is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic characteristics of the present utility model. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present utility model is defined by the appended claims rather than the above description. Therefore, all changes falling within the meaning and scope of the equivalent elements of the claims are intended to be included in the present utility model. Any reference signs in the claims should not be regarded as limiting the claimed rights.
Claims
1. A bentonite waterproof blanket river channel construction structure, comprising a river channel foundation body (100), anchoring grooves (103) are arranged inside the upper part of both sides of the river channel foundation body (100), first bentonite waterproof blankets (200) are arranged on both sides of the inner wall of the river channel foundation body (100), and two first bentonite waterproof blankets (200) are arranged, and a second bentonite waterproof blanket (300) is arranged on the lower end surface of the inner wall of the river channel foundation body (100); Features: Also includes: A concrete base (102) is installed inside the two sides of the channel foundation body (100), and two concrete bases (102) are provided. The two concrete bases (102) are integrally formed by embedded casting inside the two sides of the channel foundation body (100), and the two concrete bases (102) are provided with concrete connecting rods (10201) inside, and the first bentonite waterproof blanket (200) is fixed to the upper end surface of the concrete connecting rod (10201) by a first fixing nail (101); The rivet (109) is installed at the lower part of the channel foundation body (100), and a plurality of the rivets (109) are provided. Inclined plates (110) are provided on both sides of the outer walls of the plurality of rivets (109).
2. The river channel construction structure of a bentonite waterproof blanket according to claim 1, characterized in that: A groove cavity (107) is arranged inside the end surface of the second bentonite waterproof blanket (300), and a fourth fixing nail (108) is arranged inside the groove cavity (107). The lower end of the fourth fixing nail (108) penetrates and extends to the inside of the rivet (109), and the lower end of the fourth fixing nail (108) is interference-connected with the inside of the rivet (109).
3. The river channel construction structure of a bentonite waterproof blanket according to claim 1, characterized in that: One end of each of the two first bentonite waterproof blankets (200) covers the upper end of the second bentonite waterproof blanket (300).
4. The river channel construction structure of a bentonite waterproof blanket according to claim 1, characterized in that: One end of the two first bentonite waterproof blankets (200) is installed at two ends of the second bentonite waterproof blanket (300), and is fixedly connected to the river channel foundation body (100) via a third fixing nail (106).
5. The river channel construction structure of a bentonite waterproof blanket according to claim 1 is characterized in that: The other ends of the two first bentonite waterproof blankets (200) extend into the interior of the anchoring trench (103), and the other ends of the two first bentonite waterproof blankets (200) are fixedly connected to the river channel foundation body (100) via second fixing nails (105).
6. The river channel construction structure of a bentonite waterproof blanket according to claim 1 is characterized in that: A non-woven geotextile (202) is arranged on the lower side of the interior of the first bentonite waterproof blanket (200) and the second bentonite waterproof blanket (300), HDPE films (201) are arranged on both sides of the outer wall of the non-woven geotextile (202), sodium-based bentonite (203) is arranged on the upper side of the non-woven geotextile (202), and a plastic flat wire woven geotextile (204) is arranged on the upper side of the sodium-based bentonite (203).
Citation Information
Patent Citations
Water storage type ecological protection bottom
CN210216317U