Tunnel top sprinkler for tunnel construction
By designing a tunnel construction sprinkler with adjustable heights, the problem of poor sprinkling of existing sprinklers on tunnels of different heights is solved, and a better sprinkling effect on the top of the tunnel is achieved.
Patent Information
- Application Number
- CN202421872052.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2025-06-20
- Estimated Expiration
- 2034-08-05
AI Technical Summary
When existing tunnel construction sprinklers spray tunnels of different heights, the height of the spray head remains fixed, and the height of the water sprayed by the spray head is limited, resulting in poor sprinkling effect on the top of the tunnel and the sprayed water cannot be sprinkled on the top.
A tunnel top sprinkler for tunnel construction is designed, including a moving frame and an adjustment mechanism. The mobile rack is equipped with a water pipe and a nozzle. The support rack can be detached. The height of the nozzle is adjusted through the casing and screw mechanism to adapt to tunnels of different heights.
By adjusting the height of the nozzle, ensure that the sprayed water can better adhere to the top of the tunnel, improve the sprinkling effect, and avoid the problem that the water cannot sprinkle on the top.
Smart Images

Figure CN223004049U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction sprinkling, in particular to a tunnel top sprinkler for tunnel construction. Background Technique
[0002] During the process of tunnel construction, a sprinkler is required to sprinkle water on the top of the tunnel, which can effectively reduce the temperature in the tunnel and avoid the harm caused by the dust diffusion during construction to the construction workers.
[0003] During the use of the sprinkler, it is necessary to sprinkle water on the top of the tunnel through the nozzles installed on the pipeline. However, when the existing sprinkler is used to sprinkle water on tunnels of different heights, the height position of the nozzles remains fixed, and the height of the water sprayed by the nozzles is limited, which is likely to cause poor sprinkling effect on the top of the tunnel, and the sprayed water cannot be sprinkled on the top. Content of the Utility Model
[0004] The purpose of the utility model is to provide a tunnel top sprinkler for tunnel construction, so as to solve the problems in the above-mentioned background technique that when the sprinkler is used to sprinkle water on tunnels of different heights, the height position of the nozzles remains fixed, and the height of the water sprayed by the nozzles is limited, which is likely to cause poor sprinkling effect on the top of the tunnel, and the sprayed water cannot be sprinkled on the top.
[0005] To achieve the above purpose, the utility model provides the following technical solution, a tunnel top sprinkler for tunnel construction, including:
[0006] The main body, including a moving frame, one side of the moving frame is installed with moving wheels, the other side of the moving frame is installed with a support frame, the surface of the moving frame is provided with a water delivery pipe, the surface of the water delivery pipe is fixedly connected with nozzles, and the surface of the moving frame is fixedly connected with a water tank and a control box;
[0007] The adjusting mechanism, including a sleeve, the sleeve is sleeved on the surface of the support frame, the surface of the sleeve is fixedly connected with a mounting block, the surface of the mounting block is provided with a mounting hole, the surface of the moving frame is fixedly connected with a screw rod, the surface of the screw rod is installed with a first nut, the surface of the sleeve is provided with an adjusting hole, the surface of the support frame is provided with a jack, and a bolt is installed on the surface of the jack, and a second nut is installed on the surface of the bolt.
[0008] Preferably, there are two groups of the mounting blocks and the screw rods, the two groups of the mounting blocks and the screw rods are arranged on both sides of the sleeve, the screw rod passes through the surface of the mounting block through the mounting hole, the first nut is threadedly connected to the surface of the screw rod, and the first nut is abutted and connected to the surface of the mounting block.
[0009] Preferably, the diameter of the adjustment hole is the same as that of the jack, and there are two groups of jacks, which are arranged on both sides of the support frame. The bolt is inserted and connected to the surfaces of the adjustment hole and the jack.
[0010] Preferably, one end of the bolt is abutted and connected to the outer surface of the sleeve, and the other end of the bolt is threadedly connected to the surface of the second nut, and the second nut is abutted and connected to the surface of the sleeve.
[0011] Preferably, a protection mechanism is installed on the surface of the control box. The protection mechanism includes a protection chamber, which is installed on the outer surface of the control box. Extension plates and installation chambers are fixedly connected to the surface of the protection chamber. Through holes are opened on the surface of the installation chamber. A support spring and a limiting plate are movably connected to the inner surface of the installation chamber. A clamping block is fixedly connected to the surface of the limiting plate. An installation plate is fixedly connected to the surface of the moving frame, and a clamping hole is opened on the surface of the installation plate.
[0012] Preferably, there are two groups of the installation chambers and the installation plates, and the two groups of the installation chambers and the installation plates are arranged on both sides of the protection chamber. The installation chamber is attached and connected to the surface of the installation plate. One end of the support spring is fixedly connected to the inner surface of the installation chamber, and the other end of the support spring is fixedly connected to the surface of the limiting plate.
[0013] Preferably, the limiting plate is abutted and connected to the inner surface of the installation chamber. The clamping block passes through the surface of the installation chamber through the through hole, and the clamping block is clamped and connected to the surface of the clamping hole. The diameter of the clamping hole is the same as that of the through hole.
[0014] Compared with the prior art, the beneficial effects of the present utility model are:
[0015] By disassembling the moving frame and the support frame, the height of the water delivery pipe and the nozzle installed on the support frame can be adjusted, so that the water sprayed by the nozzle can better adhere to the top of the tunnel, and the sprinkling effect of the sprinkler will be better. Under the connection of the bolt and the second nut, when the jack is aligned with the adjustment holes at different positions, the support frame can be fixed on the sleeve, so as to limit the support frame after adjusting the position.
[0016] By arranging a protection chamber on the surface of the control box, the control box can be protected to prevent the water sprayed by the nozzle towards the top of the tunnel from falling on the control box, thereby avoiding the situation that the electrical components are damaged due to water ingress into the control box. Under the action of the supporting force exerted by the support spring, the clamping of the clamping block and the clamping hole can be realized, so as to realize the limit installation of the protection chamber, and at the same time make the disassembly and assembly of the protection chamber more convenient, thereby facilitating the maintenance of the control box. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a front view three-dimensional schematic diagram of the structure of the present utility model;
[0018] Figure 2 This is the left-side perspective structural schematic diagram of the present utility model;
[0019] Figure 3 This is the perspective structural schematic diagram of the casing of the present utility model;
[0020] Figure 4 This is the perspective structural schematic diagram of the protective bin of the present utility model;
[0021] Figure 5 For the present utility model Figure 3 This is the perspective structural schematic diagram of the bolt in the present utility model;
[0022] Figure 6 For the present utility model Figure 4 This is the partial perspective sectional schematic diagram of the structure of the installation bin in the present utility model.
[0023] In the figure: 1. Moving frame; 11. Moving wheels; 12. Support frame; 13. Water delivery pipe; 14. Sprinkler head; 15. Water tank; 16. Control box; 2. Casing; 21. Installation block; 22. Installation hole; 23. Screw rod; 24. First nut; 25. Adjustment hole; 26. Insertion hole; 27. Bolt; 28. Second nut; 3. Protective bin; 31. Extension plate; 32. Installation bin; 33. Through hole; 34. Support spring; 35. Limiting plate; 36. Clamping block; 37. Installation plate; 38. Clamping hole. Specific embodiments
[0024] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0025] Please refer to Figures 1-6 , an embodiment provided by the present utility model:
[0026] A tunnel top sprinkler for tunnel construction, comprising:
[0027] The main body includes a moving frame 1. On one side of the moving frame 1, moving wheels 11 are installed. On the other side of the moving frame 1, a support frame 12 is installed. On the surface of the moving frame 1, a water delivery pipe 13 is provided. On the surface of the water delivery pipe 13, a spray head 14 is fixedly connected. On the surface of the moving frame 1, a water tank 15 and a control box 16 are fixedly connected. The support frame 12 can support and fix the spray head 14. Various electrical components are arranged in the control box 16 to control the movement of the moving wheels 11 and the start and stop of the water pump arranged in the water tank 15. Under the action of the water pump, water can be conveyed along the water delivery pipe 13 and sprayed on the top of the tunnel through the spray head 14.
[0028] The adjusting mechanism includes a sleeve 2. The sleeve 2 is sleeved on the surface of the support frame 12. On the surface of the sleeve 2, a mounting block 21 is fixedly connected. On the surface of the mounting block 21, a mounting hole 22 is provided. On the surface of the moving frame 1, a screw rod 23 is fixedly connected. On the surface of the screw rod 23, a first nut 24 is installed. On the surface of the sleeve 2, an adjusting hole 25 is provided. On the surface of the support frame 12, a jack 26 is provided. On the surface of the jack 26, a bolt 27 is installed. On the surface of the bolt 27, a second nut 28 is installed. Under the action of the sleeve 2, the height of the split support frame 12 can be extended, so that the height position of the spray head 14 installed on the support frame 12 can be adjusted, and the water sprayed by the spray head 14 can better adhere to the top of the tunnel.
[0029] Furthermore, there are two groups of the mounting block 21 and the screw rod 23. The two groups of the mounting block 21 and the screw rod 23 are arranged on both sides of the sleeve 2. The screw rod 23 passes through the surface of the mounting block 21 through the mounting hole 22. The first nut 24 is threadedly connected to the surface of the screw rod 23. The first nut 24 is in abutting connection with the surface of the mounting block 21. The sleeve 2 and the moving frame 1 are connected through the mounting block 21 and the screw rod 23. And under the connection of the mounting hole 22 and the screw rod 23, the disassembly and assembly of the sleeve 2 can be realized and it can be replaced regularly to ensure safety.
[0030] Furthermore, the diameter of the adjusting hole 25 is the same as the diameter of the jack 26. There are two groups of the jacks 26. The two groups of the jacks 26 are provided on both sides of the support frame 12. The bolt 27 is inserted and connected to the surfaces of the adjusting hole 25 and the jack 26. The adjusting holes 25 are arranged in a linear array on the surface of the sleeve 2. Under the alignment of the jack 26 and the adjusting holes 25 at different positions, the height of the support frame 12 and the spray head 14 can be adjusted. The bolt 27 passes through the surfaces of the sleeve 2 and the support frame 12 through the adjusting hole 25 and the jack 26.
[0031] Furthermore, one end of the bolt 27 is in abutting connection with the outer surface of the sleeve 2. The other end of the bolt 27 is threadedly connected to the surface of the second nut 28. The second nut 28 is in abutting connection with the surface of the sleeve 2. Under the connection of the bolt 27 and the second nut 28, the position of the adjusted support frame 12 can be fixed.
[0032] Furthermore, a protection mechanism is installed on the surface of the control box 16. The protection mechanism includes a protection chamber 3, which is installed on the outer surface of the control box 16. An extension plate 31 and an installation chamber 32 are fixedly connected to the surface of the protection chamber 3. Through holes 33 are formed on the surface of the installation chamber 32. A support spring 34 and a limit plate 35 are movably connected to the inner surface of the installation chamber 32. A clamping block 36 is fixedly connected to the surface of the limit plate 35. An installation plate 37 is fixedly connected to the surface of the moving frame 1. A clamping hole 38 is formed on the surface of the installation plate 37. Under the action of the protection chamber 3, the control box 16 can be protected to prevent water droplets from falling on the control box 16 during watering and causing water ingress inside. Moreover, through the extension plate 31, the protection range of the protection chamber 3 can be further extended.
[0033] Furthermore, two groups of the installation chamber 32 and the installation plate 37 are provided. The two groups of the installation chamber 32 and the installation plate 37 are arranged on both sides of the protection chamber 3. The installation chamber 32 is attached to the surface of the installation plate 37. One end of the support spring 34 is fixedly connected to the inner surface of the installation chamber 32, and the other end of the support spring 34 is fixedly connected to the surface of the limit plate 35. Under the connection of the installation chamber 32 and the installation plate 37, the protection chamber 3 can be installed on the surface of the moving frame 1. Under the action of the support spring 34, a support force can be applied to the limit plate 35.
[0034] Furthermore, the limit plate 35 is in abutting connection with the inner surface of the installation chamber 32. The clamping block 36 passes through the through hole 33 and is connected to the surface of the installation chamber 32. The clamping block 36 is in clamping connection with the surface of the clamping hole 38. The diameter of the clamping hole 38 is the same as that of the through hole 33. The clamping block 36 is movably connected to the surfaces of the through hole 33 and the clamping hole 38. Moreover, through the clamping of the clamping block 36 and the clamping hole 38, the installed protection chamber 3 can be limited and fixed.
[0035] Working principle: When the position of the nozzle 14 needs to be adjusted, first pull the support frame 12 upward so that it slides along the inner surface of the sleeve 2. When it moves to the appropriate position, the jacking hole 26 and the adjustment hole 25 at the corresponding position are aligned. At this time, insert the bolt 27 into the adjustment hole 25 and the jacking hole 26, and connect the second nut 28 to the bolt 27 through the thread and abut it against the surface of the sleeve 2 to complete the adjustment of the height of the nozzle 14. When the sleeve 2 needs to be replaced, loosen and remove the first nut 24 at the corresponding position through the thread, and pull the sleeve 2 so that the installation block 21 is removed along the screw 23 through the installation hole 22 for replacement.
[0036] When using the sprinkler, first cover the protection bin 3 on the outer surface of the control box 16 and place it between two groups of mounting plates 37. At the same time, press the clamping block 36 into the mounting bin 32, so that the limiting plate 35 slides along the inner surface of the through hole 33, and the support spring 34 is in a compressed state. When the protection bin 3 abuts against the moving frame 1, at this time, under the action of the supporting force applied by the support spring 34, the limiting plate 35 abuts against the inner surface of the mounting bin 32, and the clamping block 36 passes through the through hole 33 and engages with the engaging hole 38, thereby completing the installation of the protection bin 3 to achieve the protection of the control box 16.
[0037] For those skilled in the art, it is obvious that the present invention is not limited to the details of the above-described exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-limiting. The scope of the present invention is defined by the appended claims rather than the above description. Therefore, all changes falling within the meaning and scope of the equivalent elements of the claims are intended to be included in the present invention. Any reference signs in the claims should not be regarded as limiting the claimed invention.
Claims
1. A tunnel top sprinkler for tunnel construction, characterized in that: include: The main body comprises a mobile frame (1), a mobile wheel (11) is installed on one side of the mobile frame (1), a support frame (12) is installed on the other side of the mobile frame (1), a water pipe (13) is arranged on the surface of the mobile frame (1), a nozzle (14) is fixedly connected to the surface of the water pipe (13), and a water tank (15) and a control box (16) are fixedly connected to the surface of the mobile frame (1); The adjustment mechanism comprises a sleeve (2), the sleeve (2) being sleeved on the surface of a support frame (12), the surface of the sleeve (2) being fixedly connected to a mounting block (21), the surface of the mounting block (21) being provided with a mounting hole (22), the surface of the mobile frame (1) being fixedly connected to a screw rod (23), the surface of the screw rod (23) being provided with a first nut (24), the surface of the sleeve (2) being provided with an adjustment hole (25), the surface of the support frame (12) being provided with an insertion hole (26), the surface of the insertion hole (26) being provided with a bolt (27), and the surface of the bolt (27) being provided with a second nut (28).
2. The tunnel top sprinkler for tunnel construction according to claim 1, characterized in that: The mounting block (21) and the screw rod (23) are provided in two groups. The two groups of the mounting block (21) and the screw rod (23) are provided on both sides of the sleeve (2). The screw rod (23) passes through the surface of the mounting block (21) through the mounting hole (22). The first nut (24) is connected to the surface of the screw rod (23) through a thread. The first nut (24) is abutted against the surface of the mounting block (21).
3. The tunnel top sprinkler for tunnel construction according to claim 1, characterized in that: The diameter of the adjustment hole (25) is the same as the diameter of the insertion hole (26). Two groups of the insertion holes (26) are provided. The two groups of the insertion holes (26) are opened on both sides of the support frame (12). The bolts (27) are plugged and connected on the surfaces of the adjustment hole (25) and the insertion hole (26).
4. The tunnel top sprinkler for tunnel construction according to claim 1, characterized in that: One end of the bolt (27) is abutted against the outer surface of the sleeve (2), and the other end of the bolt (27) is threadedly connected to the surface of a second nut (28), and the second nut (28) is abutted against the surface of the sleeve (2).
5. The tunnel top sprinkler for tunnel construction according to claim 1, characterized in that: A protective mechanism is installed on the surface of the control box (16), and the protective mechanism comprises a protective bin (3). The protective bin (3) is installed on the outer surface of the control box (16), and an extension plate (31) and a mounting bin (32) are fixedly connected to the surface of the protective bin (3), and a through hole (33) is provided on the surface of the mounting bin (32). A support spring (34) and a limit plate (35) are movably connected to the inner surface of the mounting bin (32), and a clamping block (36) is fixedly connected to the surface of the limit plate (35). A mounting plate (37) is fixedly connected to the surface of the mobile frame (1), and a clamping hole (38) is provided on the surface of the mounting plate (37).
6. The tunnel top sprinkler for tunnel construction according to claim 5, characterized in that: The mounting bin (32) and the mounting plate (37) are provided in two groups, and the two groups of the mounting bin (32) and the mounting plate (37) are provided on both sides of the protection bin (3), the mounting bin (32) is fitted and connected to the surface of the mounting plate (37), one end of the support spring (34) is fixedly connected to the inner surface of the mounting bin (32), and the other end of the support spring (34) is fixedly connected to the surface of the limit plate (35).
7. The tunnel top sprinkler for tunnel construction according to claim 5, characterized in that: The limiting plate (35) is abutted against the inner surface of the installation bin (32), the clamping block (36) penetrates through the through hole (33) and is connected to the surface of the installation bin (32), the clamping block (36) is clamped and connected to the surface of the clamping hole (38), and the diameter of the clamping hole (38) is the same as the diameter of the through hole (33).