Pre-embedded junction box fixing device of precast concrete member

Through the design of the clamping and clamping mechanism, the destructive and poor stability of the traditional junction box fixing method is solved, and the stable installation of the junction box is achieved and the fixing effect is enhanced.

CN223052701UActive Publication Date: 2025-07-01SHANGHAI HONGHAO BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422189610.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2025-07-01
Estimated Expiration
2034-09-06

AI Technical Summary

Technical Problem

In traditional installation projects, the fixing method of the junction box is highly destructive, poor stability, and the junction box is easy to move.

Method used

The junction mechanism and the ferrule mechanism are used to fix the junction box and the insertion plate through the junction mechanism. The elastic positioning of the shrapnel is used. The ferrule mechanism is connected to the wall steel bars through the cable tie to increase the contact area to achieve stable installation.

Benefits of technology

The junction box is installed stably, avoiding the destructiveness of the traditional fixing method, and enhancing the stability and fixing effect of the junction box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223052701U_ABST
    Figure CN223052701U_ABST
Patent Text Reader

Abstract

The utility model discloses a pre-embedded junction box fixing device of a precast concrete member, which comprises a junction box, a clamping mechanism, an inserting plate, a clamping sleeve mechanism and a wall body reinforcing steel bar, the clamping mechanism is connected to the back of the junction box, and the junction box is inserted and fixed with the inserting plate through the clamping mechanism; the clamping sleeve mechanism is connected to the back of the inserting plate, and the inserting plate is fixedly connected with the wall reinforcing steel bar through the clamping sleeve mechanism. According to the utility model, the junction box only needs to be clamped on the plug board, and then the plug board is clamped on the wall reinforcing steel bar; the clamping mechanism on the back of the junction box can be inserted along the insertion groove of the insertion plate, and the clamping block is bounced into the clamping hole by utilizing the elasticity of the elastic sheet, so that the junction box can be stably installed without falling off; the clamping sleeve mechanism on the back of the plug board can be fixedly connected with the wall reinforcing steel bar in a sleeving and binding matched mode, the contact area is greatly increased, the fixing effect is better and more stable, and the junction box cannot move after being installed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of prefabricated components, in particular to a fixing device for an embedded junction box of a precast concrete component. Background Art

[0002] When installing a junction box in a reinforced concrete wall in traditional installation projects, it is necessary to damage the building wall, install it after grooving, resulting in damage to the wall. At present, although the junction box can also be pre-embedded in the precast component in the form of a recessed box for installation, the junction box is generally fixed by directly bundling a steel wire rope to the wall reinforcement. The contact area between the junction box and the reinforcement is small, resulting in the junction box being prone to movement and poor stability. Content of the Utility Model

[0003] The technical problem to be solved by the utility model is to provide a fixing device for an embedded junction box of a precast concrete component, aiming to solve the technical problems existing in the prior art that the traditional installation and fixing method is destructive, the fixing effect of the junction box is poor and it is prone to movement, and the stability is poor.

[0004] The technical solution of the utility model is: a fixing device for an embedded junction box of a precast concrete component, including a junction box, a clamping mechanism, an insertion plate, a clamping sleeve mechanism, and wall reinforcement. The clamping mechanism is connected to the back of the junction box, and the junction box is fixedly connected to the insertion plate through the clamping mechanism; the clamping sleeve mechanism is connected to the back of the insertion plate, and the insertion plate is fixedly connected to the wall reinforcement through the clamping sleeve mechanism.

[0005] Further, in the utility model, the clamping mechanism includes a connecting plate, a cross plate connected to the back of the connecting plate, elastic pieces respectively arranged at both ends of the cross plate, and clamping blocks arranged on the elastic pieces. The connecting plate is fixedly connected to the junction box.

[0006] Further, in the utility model, the insertion plate includes an insertion plate body, a slot arranged in the insertion plate body, an opening arranged on the insertion plate body and communicating with the slot, and clamping holes arranged on both sides of the opening and communicating with the slot; the opening is used to guide the connecting plate of the clamping mechanism to insert, the slot is used to guide the cross plate, elastic pieces, and clamping blocks of the clamping mechanism to insert, and the clamping block can be positioned through the cooperation of the elastic piece and the clamping hole when sliding in the slot.

[0007] Further, in the utility model, the clamping sleeve mechanism includes a plurality of connecting sleeves. A notch is arranged on the connecting sleeve along its length direction. The connecting sleeve is sleeved on the wall reinforcement through the notch, and a connecting groove is arranged on the back of the insertion plate. The connecting sleeve is fixedly installed in the connecting groove.

[0008] Furthermore, in the present utility model, a cooperating tie head and tie strip are provided on the connecting ferrule. The tie head is fixedly connected to the outer side surface of the connecting ferrule, and the tie strip is fixedly connected to the bottom end of the connecting ferrule inside the notch. The tie strip can surround the wall reinforcement and cooperate with the tie head to tighten.

[0009] Compared with the prior art, the present utility model has the following advantages: When fixing the junction box of the present utility model, it is only necessary to first snap the junction box onto the plug board and then snap the plug board onto the wall reinforcement; the snap connection mechanism on the back of the junction box can be inserted along the slot of the plug board, and the elastic piece's elasticity is used to pop the block into the card hole, thus completing the stable installation of the junction box, and the junction box will not come off; the ferrule mechanism on the back of the plug board can achieve fixed connection with the wall reinforcement by means of sleeving and cooperating with a tightened tie, greatly increasing the contact area, and the fixing effect is better and more stable, and the junction box will not move after installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 is a schematic structural diagram of the present utility model;

[0011] Figure 2 is an exploded view of the junction box and the snap connection mechanism in the present utility model after decomposition;

[0012] Figure 3 is a specific schematic structural diagram of the snap connection mechanism in the present utility model;

[0013] Figure 4 is a schematic diagram of the cooperation between the snap connection mechanism and the plug board in the present utility model;

[0014] Figure 5 is an installation schematic diagram of the snap connection mechanism and the plug board in the present utility model;

[0015] Figure 6 is an exploded view of the plug board and the ferrule mechanism in the present utility model after decomposition;

[0016] Figure 7 is a schematic diagram of the back structure of the plug board in the present utility model.

[0017] Wherein:

[0018] 1. Junction box;

[0019] 2. Snap connection mechanism; 201. Connecting plate; 202. Horizontal plate; 203. Elastic piece; 204. Block;

[0020] 3. Plug board; 301. Plug board body; 302. Connecting groove; 303. Slot; 304. Opening; 305. Card hole;

[0021] 4. Ferrule mechanism; 401. Connecting ferrule; 401a. Notch; 402. Tie head; 403. Tie strip;

[0022] 5. Wall reinforcement. Specific embodiments

[0023] The specific embodiments of the present utility model will be described in detail below with reference to the accompanying drawings.

[0024] Example:

[0025] As shown in the accompanying drawings, the specific embodiment of a fixing device for an embedded junction box of a precast concrete member of the present utility model is shown. Refer to Figure 1 and Figure 2 , which mainly includes a junction box 1, a clamping mechanism 2, an insertion plate 3, a ferrule mechanism 4, and a wall reinforcement 5. The junction box 1 and the clamping mechanism 2 are connected as a whole. The insertion plate 3 and the ferrule mechanism 4 are connected as a whole. The junction box 1 can be installed on the insertion plate 3 through the clamping mechanism 2, and the insertion plate 3 can be installed on the wall reinforcement 5 through the ferrule mechanism 4.

[0026] Refer to Figure 2 , Figure 3 , the clamping mechanism 2 is connected to the back of the junction box 1. The clamping mechanism 2 includes a connecting plate 201. The front part of the connecting plate 201 is fixedly connected to the back of the junction box 1. A transverse plate 202 is fixedly connected to the back of the connecting plate 201. Elastic pieces 203 are respectively provided at both ends of the transverse plate 202. The elastic pieces 203 are integrally formed with the transverse plate 202. A clamping block 204 is provided on each elastic piece 203. The distances between the two clamping blocks 204 and the center line of the connecting plate 201 are equal.

[0027] Refer to Figure 4 , Figure 5 , the insertion plate 3 includes an insertion plate body 301. A slot 303 is opened at the upper end of the insertion plate body 301. The upper end of the slot 303 communicates with the outside. An opening 304 communicating with the slot 303 is opened on the insertion plate body 301 above the slot 303. The width of the opening 304 is smaller than the width of the slot 303. The upper end of the opening 304 communicates with the outside. The size of the opening 304 is the same as the size of the connecting plate 201. Clamping holes 305 communicating with the slot 303 are respectively opened on the insertion plate body 301 on both sides of the opening 304. The distances between the two clamping holes 305 and the center line of the opening 304 are equal. The size of the clamping holes 305 is larger than the size of the clamping blocks 204, facilitating the smooth falling of the clamping blocks 204 into the clamping holes 305.

[0028] When the junction box 1 is connected to the plug board 3 through the clamping mechanism 2, the connecting plate 201 of the clamping mechanism 2 is aligned with the opening 304 of the plug board body 301, and the junction box 1 is slid so that its back is close to the plug board body 301 and slides. After the connecting plate 201 slides into the opening 304 for a distance, the block 204 will conflict with the plug board body 301. At this time, the sliding is stopped, and the spring pieces 203 at both ends of the cross plate 202 are slightly pressed down so that the block 204 can enter the slot 303. Then the junction box 1 is continued to slide, and the cross plate 202, the spring piece 203, and the block 204 are driven to slide in the slot 303. When the block 204 slides to the bottom of the card hole 305, the block 204 can use the elasticity of the spring piece 203 to bounce upward into the card hole 305, completing the positioning and installation of the junction box 1. At this time, the connecting plate 201 slides to the lower end of the opening 304, and the block 204 just falls into the card hole 305, with good installation accuracy.

[0029] Reference Figure 6 , Figure 7 , the clamping mechanism 4 is connected to the back of the plug board 3. The clamping mechanism 4 includes a plurality of connecting clamps 401, and a plurality of connecting grooves 302 are provided on the back of the plug board 3. The connecting clamps 401 are fixedly installed in the connecting grooves 302 one by one. The size and shape of the connecting grooves 302 are adapted to the connecting clamps 401, so that the connecting clamps 401 can be fitted with the connecting grooves 302. A notch 401a is provided at the bottom of each connecting clamp 401 along its length direction, and the length of the notch 401a is the same as that of the connecting clamp 401. The connecting clamp 401 is elastic, so that the connecting clamp 401 can be installed on the wall reinforcement 5 through the notch 401a.

[0030] Each connecting sleeve 401 is also provided with a matching tie head 402 and tie strip 403. The tie head 402 is fixedly connected to the outer surface of the connecting sleeve 401, and one end of the tie strip 403 is fixedly connected to the bottom of the connecting sleeve 401 inside the notch 401a. The installation position of the tie head 402 and the tie strip 403 is more convenient for tightening and installation. After the connecting sleeve 401 is sleeved on the wall reinforcement 5, the tie strip 403 can be pulled outward to bypass the wall reinforcement 5 and then inserted into the tie head 402 for tightening, which can play a further fixing role and ensure that the overall installation is more secure and will not move. In this embodiment, the tie head 402 and the tie strip 403 on each connecting sleeve 401 are arranged in two groups at intervals, which can also be adjusted as needed.

[0031] Of course, the above embodiments are only for illustrating the technical concept and features of the utility model, and their purpose is to enable people familiar with the technology to understand the content of the utility model and implement it accordingly, and they cannot be used to limit the protection scope of the utility model. Any modifications made according to the spirit of the main technical solution of the utility model should be included in the protection scope of the utility model.

Claims

1. A prefabricated concrete component embedded junction box fixing device, characterized in that: The invention comprises a junction box (1), a clamping mechanism (2), a plug plate (3), a clamping mechanism (4), and a wall reinforcement (5); the clamping mechanism (2) is connected to the back of the junction box (1); the junction box (1) is plugged and fixed to the plug plate (3) via the clamping mechanism (2); the clamping mechanism (4) is connected to the back of the plug plate (3); the plug plate (3) is fixedly connected to the wall reinforcement (5) via the clamping mechanism (4).

2. The embedded junction box fixing device of a precast concrete component according to claim 1, characterized in that: The clamping mechanism (2) comprises a connecting plate (201), a transverse plate (202) connected to the back of the connecting plate (201), spring sheets (203) respectively arranged at both ends of the transverse plate (202), and a clamping block (204) arranged on the spring sheets (203); the connecting plate (201) is fixedly connected to the junction box (1).

3. The embedded junction box fixing device of a precast concrete component according to claim 2, characterized in that: The plug board (3) comprises a plug board body (301), a slot (303) arranged in the plug board body (301), an opening (304) arranged on the plug board body (301) and connected to the slot (303), and clamping holes (305) arranged on both sides of the opening (304) and connected to the slot (303); the opening (304) is used to guide the insertion of the connecting plate (201) of the clamping mechanism (2), the slot (303) is used to guide the insertion of the transverse plate (202), the spring sheet (203), and the clamping block (204) of the clamping mechanism (2); when the clamping block (204) slides in the slot (303), it can be positioned through the cooperation between the spring sheet (203) and the clamping hole (305).

4. The embedded junction box fixing device of a precast concrete component according to claim 3 is characterized in that: The clamping sleeve mechanism (4) comprises a plurality of connecting clamping sleeves (401), each of which is provided with a notch (401a) along its length direction, and the connecting clamping sleeve (401) is sleeved onto the wall reinforcement (5) through the notch (401a). The back of the plug plate (3) is provided with a connecting groove (302), and the connecting clamping sleeve (401) is fixedly installed in the connecting groove (302).

5. The embedded junction box fixing device of a precast concrete component according to claim 4, characterized in that: The connecting sleeve (401) is provided with a matching tie head (402) and a tie strip (403); the tie head (402) is fixedly connected to the outer surface of the connecting sleeve (401); the tie strip (403) is fixedly connected to the bottom end of the connecting sleeve (401) inside the notch (401a); the tie strip (403) can surround the wall reinforcement (5) and cooperate with the tie head (402) to tighten.