Petroleum engineering pipeline support hanger
The pipe hanger design provides balanced support to oil engineering pipe joints using symmetrical and locking mechanisms, addressing uneven stress distribution and enhancing joint stability.
Patent Information
- Application Number
- CN202422239851.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2025-07-15
- Estimated Expiration
- 2034-09-12
AI Technical Summary
The existing petroleum engineering pipeline support hangers can only be supported from one side at the joint, resulting in uneven stress on both sides of the joint and poor support effect.
A petroleum engineering pipeline support hanger is designed, using a support device to clamp the fixed pipe from both sides of the joint, and provides auxiliary support and locking through the fixing assembly and locking assembly to ensure that the force on both sides of the joint is balanced.
The force balance on both sides of the joint is achieved, the support effect is improved, and the joints of different lengths are adapted to joints with fixed spacing through sliding connections, enhancing the stability and safety at the joints.
Smart Images

Figure CN223105486U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of petroleum pipeline support and hanger, in particular to a petroleum engineering pipeline support and hanger. Background Art
[0002] Oil pipeline supports and hangers refer to the general term for various structures used to support oil pipelines or constrain pipeline displacement. They are vital components in the oil pipeline system. They are used to support pipelines, constrain pipeline displacement and control pipeline vibration, and ensure the safe and stable operation of the pipeline system. Oil pipeline supports and hangers are widely used in pipelines of oil, natural gas and other transportation systems. They are not only used to support and constrain pipelines, but also optimize the overall performance of the pipeline system through reasonable layout and design, and improve the safety and economy of the pipeline system.
[0003] In contrast, a Chinese patent with authorization announcement number CN217208063U discloses a petroleum engineering pipeline support and hanger, including a base plate, a bracket fixedly connected to the top of the base plate, lifting ears fixedly connected to both sides of the bracket, a power box fixedly connected to the top of the bracket, a power assembly provided in the power box, a connecting column transmission-connected to the power assembly, two connecting columns, the bottom ends of the two connecting columns extend to the bracket and are fixedly connected to a connecting plate, buffer components are provided on the connecting plate and the base plate, the two buffer components are respectively provided with a first arc plate and a second arc plate, the first arc plate is adapted to the second arc plate, and a buffer pad is provided on the inner wall on one side where the first arc plate and the second arc plate are close to each other.
[0004] When supporting the pipe joint in the above patent, the pipe can only be supported from one side of the joint, resulting in uneven force on both sides of the joint and poor supporting effect. Therefore, a new device needs to be designed. Utility Model Content
[0005] The purpose of the utility model is to provide a petroleum engineering pipeline support and hanger to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A petroleum engineering pipeline support and hanger, comprising a supporting device for supporting suspension and sliding, and also comprising two fixing components symmetrically installed on the supporting device for clamping and fixing the pipeline from both sides of the joint and sliding to adjust the fixed spacing, and two locking components for auxiliary support and secondary locking and fixing are symmetrically arranged on both sides of the supporting device;
[0008] The locking assembly includes a sliding rod, and two fixing rods are symmetrically arranged at the front and rear ends of the sliding rod. Two limiting clips are symmetrically and slidably mounted on the sliding rod in the front and rear directions. A locking sleeve is provided on each of the opposite sides of the two limiting clips, and a locking pin is provided on the locking sleeve.
[0009] Further: The supporting device includes a supporting plate, and six fixing ears are evenly arranged around the supporting plate. Four first lifting arms are evenly arranged at the four corners below the supporting plate. A lifting rail is installed between two first lifting arms on the same side. A left - right threaded lead screw is arranged between the two lifting rails, and two second lifting arms are symmetrically arranged at the front and rear ends of the left - right threaded lead screw.
[0010] Further: The fixing assembly includes a slider, and two suspension screws are symmetrically arranged on both sides below the slider. A lower hoop is provided at the bottom of the two suspension screws. An upper hoop is provided above the lower hoop, and two fixing nuts are symmetrically arranged on both sides above the upper hoop.
[0011] Further: The limiting clip is U - shaped, and the locking sleeve is welded to the limiting clip.
[0012] Further: An anti - detachment pad is provided below the fixing nut, and the anti - detachment pad is made of silicone material.
[0013] Further: A knob is installed in front of the left - right threaded lead screw. The knob is cylindrical and made of 304 stainless steel.
[0014] Compared with the prior art, the beneficial effects are:
[0015] 1. Through the setting of clamping and fixing the pipeline from both sides of the joint, supporting the two pipelines connected at the joint from both sides of the joint, ensuring the balanced force on both sides of the joint and improving the supporting effect at the joint;
[0016] 2. Through the setting of auxiliary support, connecting the two fixing components from the bottom and providing auxiliary support to make their clamping centers collinear, further improving the supporting effect at the joint;
[0017] 3. Through the setting of sliding connection with a fixed spacing, it meets the use of joints with different lengths. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 is a schematic structural diagram of a pipeline support and hanger for petroleum engineering according to the present utility model;
[0019] Figure 2 is an axonometric view of the supporting device of a pipeline support and hanger for petroleum engineering according to the present utility model;
[0020] Figure 3It is an isometric view of the fixing component of a pipeline support hanger for petroleum engineering described in the present utility model;
[0021] Figure 4 It is an isometric view of the locking component of a pipeline support hanger for petroleum engineering described in the present utility model.
[0022] In the attached drawing reference numerals: 101, support plate; 102, fixing ear; 103, first lifting arm; 104, lifting rail; 105, second lifting arm; 106, right - and - left - hand threaded screw rod; 107, knob; 201, slider; 202, suspension screw rod; 203, lower hoop; 204, upper hoop; 205, fixing nut; 206, anti - detachment pad; 301, fixing rod; 302, sliding rod; 303, limit clamp; 304, locking sleeve; 305, locking pin. Specific embodiments
[0023] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present utility model.
[0024] Please refer to Figures 1-4 , a pipeline support hanger for petroleum engineering, including a support device for supporting and suspending and sliding, further including two fixing components symmetrically installed front and back on the support device for clamping and fixing the pipeline from both sides of the joint and sliding and adjusting the fixing distance, and two locking components symmetrically arranged on both sides of the support device for auxiliary support and secondary locking and fixing.
[0025] In this embodiment: The support device includes a support plate 101. Six fixing ears 102 are evenly arranged around the support plate 101. Four first lifting arms 103 are evenly arranged at the four corners under the support plate 101. A lifting rail 104 is installed between two first lifting arms 103 on the same side. A right - and - left - hand threaded screw rod 106 is arranged between the two lifting rails 104. Two second lifting arms 105 are symmetrically arranged at the front and rear ends of the right - and - left - hand threaded screw rod 106. A knob 107 is installed in front of the right - and - left - hand threaded screw rod 106. The knob 107 is cylindrical in shape and made of 304 stainless steel. Before use, the right - and - left - hand threaded screw rod 106 is rotated through the knob 107 under the support of the second lifting arm 105, so that it pushes the two fixing components to move relatively or away from each other along the lifting rail 104 under the support of the first lifting arm 103 to adjust the fixing distance. When in use, the support plate 101 is installed on the wall through the fixing ears 102, and the fixing components are supported and fixed through the lifting rail 104 at the bottom of the first lifting arm 103;
[0026] In this embodiment: The fixing component includes a slider 201. On both sides of the lower surface of the slider 201, two suspension screws 202 are symmetrically arranged. At the bottom of the two suspension screws 202, a lower hoop 203 is provided. Above the lower hoop 203, an upper hoop 204 is provided. On both sides above the upper hoop 204, two fixing nuts 205 are symmetrically arranged. Below the fixing nuts 205, an anti-detachment pad 206 is provided. The anti-detachment pad 206 is made of silicone material. Under the drive of the slider 201, the distance between the two fixing components is adjusted to be slightly larger than the joint length. Then, the two connected pipes are passed through the two fixing components, and the joint is located between the two fixing components. Then, the fixing nuts 205 are rotated so that the upper hoop 204 is pushed downward along the suspension screws 202 through the anti-detachment pad 206, and the lower hoop 203 is cooperated to clamp and fix the pipes from both sides of the joint, improving the stability at the joint;
[0027] In this embodiment: The locking component includes a slide bar 302. At the front and rear ends of the slide bar 302, two fixing bars 301 are symmetrically arranged. On the slide bar 302, two limit clips 303 are symmetrically and slidably installed in the front and rear. On the opposite sides of the two limit clips 303, a locking sleeve 304 is respectively provided. On the locking sleeve 304, a locking pin 305 is provided. The limit clip 303 is in a U shape. The locking sleeve 304 is welded to the limit clip 303. After the adjustment is completed, the locking pin 305 is rotated to tighten against the slide bar 302 to fix the position of the locking sleeve 304, so that the locking sleeve 304 locks the position of the fixing component through the limit clip 303. During use, the fixing bar 301 is fixed on the first boom 103, and the slide bar 302 provides support for the bottom of the fixing component, thereby providing auxiliary support for the pipes and enhancing their stability.
[0028] Working principle: Before use, the two fixing components are adjusted. Under the support of the second boom 105, the left-right threaded screw rod 106 is rotated through the knob 107, so that it drives the two fixing components to move relative to or away from each other along the suspension rail 104 under the support of the first boom 103 through the slider 201, and the distance between the two fixing components is adjusted to be slightly larger than the joint length. Then, the locking pin 305 is rotated to tighten against the slide bar 302 to fix the position of the locking sleeve 304, so that the locking sleeve 304 locks the position of the fixing component through the limit clip 303, completing the adjustment; During use, the support plate 101 is installed on the wall through the fixing ear 102, so that it supports the fixing component through the suspension rail 104 at the bottom of the first boom 103. Then, the two connected pipes are passed through the two fixing components, and the joint is located between the two fixing components. Then, the fixing nuts 205 are rotated so that the upper hoop 204 is pushed downward along the suspension screws 202 through the anti-detachment pad 206, and the lower hoop 203 is cooperated to clamp and fix the pipes from both sides of the joint, improving the stability at the joint. At this time, the fixing bar 301 is fixed on the first boom 103, and the slide bar 302 provides support for the bottom of the fixing component, thereby providing auxiliary support for the pipes and enhancing their stability.
[0029] Although embodiments of the present utility model have been shown and described, those of ordinary skill in the art can understand that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principle and spirit of the present utility model. The scope of the present utility model is defined by the appended claims and their equivalents.
Claims
1. An oil engineering pipeline support hanger, including a support device for supporting, suspending and sliding, characterized in that: It further includes two fixing components symmetrically installed on the front and rear of the support device for clamping and fixing the pipeline on both sides of the joint and sliding and adjusting the fixing distance, and two locking components symmetrically arranged on both sides of the support device for auxiliary support and secondary locking and fixing; The locking component includes a sliding rod (302), two fixing rods (301) symmetrically arranged at the front and rear ends of the sliding rod (302), two limit clips (303) symmetrically and slidably installed on the sliding rod (302) front and rear, a locking sleeve (304) is respectively arranged on the opposite sides of the two limit clips (303), and a locking pin (305) is arranged on the locking sleeve (304).
2. The pipe hanger for petroleum engineering according to claim 1, characterized in that: The support device includes a support plate (101), six fixing ears (102) are evenly arranged around the support plate (101), four first lifting arms (103) are evenly arranged at the four corners under the support plate (101), a lifting rail (104) is installed between the two first lifting arms (103) on the same side, a left - right threaded screw rod (106) is arranged between the two lifting rails (104), and two second lifting arms (105) are symmetrically arranged at the front and rear ends of the left - right threaded screw rod (106).
3. The pipe hanger for petroleum engineering according to claim 1, characterized in that: The fixing component includes a slider (201), two suspension screw rods (202) symmetrically arranged on both sides under the slider (201), a lower hoop (203) is arranged at the bottom of the two suspension screw rods (202), an upper hoop (204) is arranged above the lower hoop (203), and two fixing nuts (205) are symmetrically arranged on both sides above the upper hoop (204).
4. The pipe support hanger for petroleum engineering according to claim 1, characterized in that: The limit clip (303) is U - shaped, and the locking sleeve (304) is welded to the limit clip (303).
5. The pipe support hanger for petroleum engineering according to claim 3, characterized in that: A anti - detachment pad (206) is arranged under the fixing nut (205), and the anti - detachment pad (206) is made of silicone material.
6. The pipe hanger for petroleum engineering according to claim 2, characterized in that: A knob (107) is installed in front of the left - right threaded screw rod (106), the knob (107) is cylindrical in shape and is made of 304 stainless steel material.
Citation Information
Patent Citations
Petroleum engineering pipeline support hanger