Protective net for constructional engineering

Through structural designs such as removable base and winch, the problems of unstable installation and insufficient general use of the protective net are solved, and the stable installation and flexible adaptability of the protective net are achieved to ensure construction safety and pedestrian protection.

CN223135739UActive Publication Date: 2025-07-22SHANDONG YANZHOU CONSTR CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422224454.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2025-07-22
Estimated Expiration
2034-09-11

AI Technical Summary

Technical Problem

The protective nets used in existing construction projects are unstable to install, easily loosen, tilt or collapse, and are not widely used, inconvenient to assemble and disassemble, and are difficult to adapt to the length adjustment of different construction environments.

Method used

The first and second bases are adopted, combined with the hoist, column and driven roller structure, to achieve flexible adjustment of the effective area of the protective net, and through the cooperation of the canvas and driven rollers, the alignment and protection effect of the canvas and the protective net body are ensured.

Benefits of technology

The protective net is stable, adapted to various construction scenarios, prevented construction materials from falling, avoided the folding of canvas affecting the effective area, and protected pedestrian clothing from being stained.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223135739U_ABST
    Figure CN223135739U_ABST
Patent Text Reader

Abstract

The utility model provides a protective net for constructional engineering, and belongs to the technical field of buildings. The effective area of the protective net body is changed by calculating the effective area of the protective net expected to be needed by a construction site and changing the relative distance between the first base and the second base, so that the protective net for constructional engineering can be applied to various scenes and is high in universality; by arranging a winch, a first stand column, a second stand column, a first driven roller, a second driven roller and a protective net body, falling building materials are intercepted by the protective net body between the first stand column and the second stand column; by arranging canvas, a second driven roller and a third driven roller, it is guaranteed that the canvas is aligned with the front end and the rear end of the protective net body, it is avoided that the effective area of the canvas is affected by folding of the canvas, meanwhile, the canvas is used for intercepting gravel or other building materials with the size smaller than that of a net opening of the protective net body, and clothes of pedestrians are prevented from being stained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction, and particularly relates to a protective net for construction engineering. Background Technique

[0002] With the continuous development of social economy and the continuous improvement of construction level, various buildings have sprung up across the country. The emergence of various buildings has greatly improved people's living quality. However, in building construction, in order to prevent high-altitude falling stones, etc., it is usually necessary to set up a protective net outside the building or by the roadside to prevent building materials from falling and injuring pedestrians.

[0003] Many of the existing protective nets for construction engineering are temporary and are installed by simple bolts and nuts. This simple method is prone to looseness, which may lead to the inclination or collapse of the protective net. Moreover, it is very inconvenient and time-consuming to assemble and disassemble. At the same time, during the construction process, due to different construction environments, the effective length of the protective net needs to be adjusted during the construction of the protective net, and the versatility of the existing protective nets is not strong. Content of the Utility Model

[0004] The utility model aims at the problems in the prior art and provides a protective net for construction engineering.

[0005] In order to achieve the above purpose, the technical solution adopted in this application is as follows:

[0006] A protective net for construction engineering includes a first base and a second base; the first base is arranged on the left side of the second base; on the top surface of the first base, a first upright column and a shell are fixedly installed in sequence from right to left; on the second base, a winch and a second upright column are fixedly installed in sequence from right to left; the front cross-sections of the first upright column and the second upright column are T-shaped, and first driven rollers are fixedly installed at the left and right ends of the tops of the first upright column and the second upright column; the outer surface of the winch is wound with a protective net body, and the other end of the protective net body passes through the first driven roller on the right side of the second upright column, the first driven roller on the left side of the second upright column, the first driven roller on the right side of the first upright column, and the first driven roller on the left side of the first upright column in sequence and then passes through the top surface of the shell and is fixedly wound around the outer surface of the second driven roller; the second driven roller is fixedly installed inside the shell through a first support column whose other end is fixedly connected to the bottom surface of the inner wall of the shell;

[0007] The first base and the second base are detachably arranged on the ground.

[0008] Preferably, the inner side of one end of the protective net body close to the winch is fixedly connected to the top end of a canvas. The canvas is in contact with the inner side of the protective net body. The inner side of the canvas, at the end away from its connection with the protective net body, passes through the first driven roller on the right side of the second column, the first driven roller on the left side of the second column, the first driven roller on the right side of the first column, and the first driven roller on the left side of the first column in sequence, and then passes through the top surface of the housing and is fixedly wound around the outer side of the fourth driven roller; the fourth driven roller is fixedly installed inside the housing through a second support column whose other end is fixedly connected to the bottom surface of the inner wall of the housing.

[0009] Preferably, there are also two third driven rollers provided at the entrance of the protective net body and the canvas into the housing at the top inside the housing, namely a left third driven roller and a right third driven roller; the left third driven roller is in contact with the outer side of the protective net body, and the right third driven roller is in contact with the inner side of the canvas; the inner side of the protective net body between the left third driven roller and the right third driven roller is in close contact with the outer side of the canvas.

[0010] Compared with the prior art, the advantages and positive effects of the present utility model are as follows:

[0011] For a protective net for construction engineering of the present utility model, by calculating the effective area of the protective net required for the construction site, and by changing the relative distance between the first base and the second base to realize the change of the effective area of the protective net body, the protective net for construction engineering of the present application can be applied to various scenarios and has strong versatility; through the setting of a winch, a first column, a second column, a first driven roller, a second driven roller, and the protective net body, the protective net body between the first column and the second column intercepts the falling building materials; by setting a canvas, a second driven roller, and a fourth driven roller, it ensures the alignment of the front and rear ends of the canvas and the protective net body, avoids the folding of the canvas from affecting the effective area of the canvas, and at the same time uses the canvas to intercept the sand or other building materials with sizes smaller than the mesh opening of the protective net body, so as to avoid soiling the clothes of pedestrians. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the technical solutions in the embodiments of the present utility model or the prior art, the following will briefly introduce the drawings required for the description of the embodiments or the prior art. Obviously, the following drawings are some embodiments of the present utility model. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.

[0013] Figure 1 is a schematic structural diagram of the present utility model;

[0014] Figure 2 is Figure 1 a partial enlarged view of part A (the connection between the protective net body and the canvas) in

[0015] In the above figures: 1 is the first base; 2 is the second base; 3 is the first column; 4 is the housing; 5 is the winch; 6 is the second column; 7 is the first driven roller; 701 is the first driven roller on the right side of the second column; 702 is the first driven roller on the left side of the second column; 703 is the first driven roller on the right side of the first column; 704 is the first driven roller on the left side of the first column; 8 is the main body of the protective net; 9 is the second driven roller; 10 is the first support column; 11 is the canvas; 12 is the fourth driven roller; 13 is the second support column; 14 is the third driven roller; 1401 is the left third driven roller; 1402 is the right third driven roller. Detailed implementation mode

[0016] In order to more clearly understand the above-mentioned objects, features and advantages of the present invention, the present invention will be further described below with reference to the drawings and embodiments. It should be noted that, without conflict, the embodiments of the present application and the features in the embodiments can be combined with each other.

[0017] In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention can also be implemented in other ways different from those described herein. Therefore, the present invention is not limited by the specific embodiments disclosed in the following specification.

[0018] Embodiment 1, as shown in Figure 1 、 Figure 2 shown, a protective net for construction engineering of the present application includes a first base 1 and a second base 2; the first base 1 is arranged on the left side of the second base; on the top surface of the first base 1, a first column 3 and a housing 4 are fixedly installed in sequence from right to left; on the second base 2, a winch 5 and a second column 6 are fixedly installed in sequence from right to left; the front cross-sections of the first column 3 and the second column 6 are T-shaped, and first driven rollers 7 are fixedly installed at the left and right ends of the tops of the first column 3 and the second column 6; the outer surface of the winch 5 is surrounded by the main body of the protective net 8, and the other end of the main body of the protective net 8 passes through the first driven roller 701 on the right side of the second column, the first driven roller 702 on the left side of the second column, the first driven roller 703 on the right side of the first column, and the first driven roller 704 on the left side of the first column in sequence, passes through the top surface of the housing 4 and is fixedly wound around the outer surface of the second driven roller 9; the second driven roller 9 is fixedly installed inside the housing 4 through a first support column 10 whose other end is fixedly connected to the bottom surface of the inner wall of the housing 4;

[0019] The first base 1 and the second base 2 are detachably arranged on the ground; during use, the effective area of the protective net body 8 required is calculated according to the environment of the construction site, and the effective area of the protective net body 8 is changed by changing the relative distance between the first base 1 and the second base 2, so that the protective net for construction projects of the present application can be applied to various scenarios and has strong versatility; during storage, the protective net body 8 is wound on the outer side of the second driven roller 9, and the protective net body 8 is drawn to the winch 5 by starting the motor on the back of the winch 5 to realize the unfolding of the protective net body 8. Pedestrians can walk under the protective net body 8 between the first base 1 and the second base 2, and the protective net body 8 intercepts the building materials falling from a height.

[0020] The inner side of one end of the protective net body 8 close to the winch 5 is fixedly connected to the top end of a canvas 11. The canvas 11 is in contact with the inner side of the protective net body 8. The width of the front and rear ends of the canvas 11 is the same as that of the protective net body 8. The inner side of the canvas 11 away from the end connected to the protective net body 8 passes through the first driven roller 701 on the right side of the second column, the first driven roller 702 on the left side of the second column, the first driven roller 703 on the right side of the first column, and the first driven roller 704 on the left side of the first column in sequence and then passes through the top surface of the housing 4 and is fixedly wound on the outer side of the fourth driven roller 12; the fourth driven roller 12 is fixedly installed inside the housing 4 by a second support column 13 whose other end is fixedly connected to the bottom surface of the inner wall of the housing 4; thus, a canvas 11 is arranged below the protective net body 8 between the first base 1 and the second base 2, which can effectively intercept gravel or sand and gravel smaller than the mesh opening of the protective net body 8 and prevent pedestrians' clothes from being soiled.

[0021] At the entrance of the protective net body 8 and the canvas 11 into the housing 4 at the top inside the housing 4, there are also two third driven rollers 14, namely the left third driven roller 1401 and the right third driven roller 1402; the left third driven roller 1401 is in contact with the outer side of the protective net body 8, and the right third driven roller 1402 is in contact with the inner side of the canvas; the inner side of the protective net body 8 between the left third driven roller 1401 and the right third driven roller 1402 is in close contact with the outer side of the canvas 11; since the canvas 11 is soft, it is easy to fold during the winding or extraction process, which is likely to affect the effective area of the canvas 11. The setting of the third driven roller 14 flattens the canvas 11 and clamps the canvas 11 and the protective net body 8 during the subsequent movement, so that the canvas 11 and the protective net body 8 will not shift during the extraction process, affecting the ability to intercept the falling building materials.

[0022] The above are only the preferred embodiments of the present utility model, and do not limit the present utility model in other forms. Any person skilled in the relevant art may use the technical content disclosed above to make changes or modifications into equivalent embodiments with equivalent changes and apply them to other fields. However, as long as it does not depart from the technical solution content of the present utility model, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present utility model still fall within the protection scope of the technical solution of the present utility model.

Claims

1. A protective net for construction engineering, characterized in that, It includes a first base (1) and a second base (2); the first base (1) is arranged on the left side of the second base; on the top surface of the first base (1), a first upright column (3) and a housing (4) are fixedly installed in sequence from right to left; on the second base (2), a winch (5) and a second upright column (6) are fixedly installed in sequence from right to left; the front cross-sections of the first upright column (3) and the second upright column (6) are T-shaped, and first driven rollers (7) are fixedly installed at the left and right ends of the tops of the first upright column (3) and the second upright column (6); a protective net body (8) is wound around the outer side of the winch (5), and the other end of the protective net body (8) passes through the first driven roller (701) on the right side of the second upright column, the first driven roller (702) on the left side of the second upright column, the first driven roller (703) on the right side of the first upright column, and the first driven roller (704) on the left side of the first upright column in sequence, passes through the top surface of the housing (4), and is fixedly wound around the outer side of the second driven roller (9); the second driven roller (9) is fixedly installed inside the housing (4) through a first support column (10) whose other end is fixedly connected to the bottom surface of the inner wall of the housing (4). The first base (1) and the second base (2) are detachably arranged on the ground.

2. The protective net for construction engineering according to claim 1, wherein, The inner side of the end of the protective net body (8) close to the winch (5) is fixedly connected to the top end of a canvas (11), the canvas (11) is in contact with the inner side of the protective net body (8), and the inner side of the canvas (11) away from the end connected to the protective net body (8) passes through the first driven roller (701) on the right side of the second upright column, the first driven roller (702) on the left side of the second upright column, the first driven roller (703) on the right side of the first upright column, and the first driven roller (704) on the left side of the first upright column in sequence, passes through the top surface of the housing (4), and is fixedly wound around the outer side of the fourth driven roller (12); the fourth driven roller (12) is fixedly installed inside the housing (4) through a second support column (13) whose other end is fixedly connected to the bottom surface of the inner wall of the housing (4).

3. The protective net for construction projects according to claim 2, characterized in that, At the place where the protective net body (8) and the canvas (11) enter the housing (4) at the top inside the housing (4), third driven rollers (14) are also arranged. There are two third driven rollers (14), namely a left third driven roller (1401) and a right third driven roller (1402); the left third driven roller (1401) is in contact with the outer side of the protective net body (8), and the right third driven roller (1402) is in contact with the inner side of the canvas; the inner side of the protective net body (8) between the left third driven roller (1401) and the right third driven roller (1402) is in close contact with the outer side of the canvas (11).