Long screw stamping die

By designing long screw stamping molds, rapid demolding is achieved by using cylinder-driven mold separation, which solves the problem of difficult demolding of existing molds and improves production efficiency.

CN223159946UActive Publication Date: 2025-07-29HAIYAN HUACHENG FASTENERS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420758379.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2025-07-29
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

Existing stamping molds for screw production cannot be quickly released, resulting in inefficient production efficiency.

Method used

A long screw stamping mold is designed, and the second mold is moved by the first cylinder, and the first mold and the second mold are separated, so that the long screws naturally fall off into the material collection frame, and stable stamping and efficient mold release are achieved by the coordination of the guide rail and the guide groove.

Benefits of technology

Improve the production efficiency of long screws, facilitate user operation, and enhance production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223159946U_ABST
    Figure CN223159946U_ABST
Patent Text Reader

Abstract

The utility model discloses a long screw stamping die which comprises a machine frame, a stamping table is arranged at the upper end of the machine frame, a stamping frame is arranged at the upper end of the stamping table, a stamping mechanism is arranged at the lower end of the stamping frame, a die mechanism is arranged at the upper end of the stamping table, and the die mechanism comprises a first die, a second die and a first driving mechanism. The first die is fixedly arranged at the left end of the stamping frame, a guide rail is arranged at the right end of the stamping table, a guide groove is formed in the lower end of the second die, the guide rail is matched with the guide groove, a first stamping groove is formed in the right end of the first die, and a second stamping groove is formed in the left end of the second die. And the first stamping groove is matched with the second stamping groove. According to the long screw stamping die, stamping of a long screw can be achieved, then the first die and the second die are separated through the first air cylinder, the long screw naturally falls into the first material collecting frame, production efficiency is higher, and use is more convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of molds, and particularly relates to a long screw stamping die. Background Art

[0002] In industrial production, molds are various dies and tools used for injection molding, blow molding, extrusion, die casting, forging, smelting, stamping and other methods to obtain the required products. In short, a mold is a tool for making shaped articles. Such a tool is composed of various parts, and different molds are composed of different parts. A stamping die is one of the molds.

[0003] In the production process of long screws, stamping dies are often used to stamp the screws. However, the existing stamping dies for screw production cannot be quickly demolded, which reduces the production efficiency and is not convenient for users. Summary of the Invention

[0004] To solve the deficiencies of the prior art, the utility model provides a long screw stamping die.

[0005] To achieve the above object, the utility model provides the following technical solutions:

[0006] A long screw stamping die, including a frame. A stamping table is provided at the upper end of the frame. A stamping frame is provided at the upper end of the stamping table. A stamping mechanism is provided at the lower end of the stamping frame. A mold mechanism is provided at the upper end of the stamping table. The mold mechanism includes a first mold, a second mold and a first driving mechanism. The first mold is fixedly arranged at the left end of the stamping frame. A guide rail is provided at the right end of the stamping table. A guide groove is provided at the lower end of the second mold. The guide rail matches the guide groove. The first driving mechanism is used to drive the second mold to move. A first stamping groove is provided at the right end of the first mold. A second stamping groove is provided at the left end of the second mold. The first stamping groove matches the second stamping groove.

[0007] Further, the stamping mechanism includes a first stamping die, a first hydraulic cylinder and a first mounting plate. The first hydraulic cylinder is installed at the lower end of the stamping frame. The first mounting plate is installed at the lower end of the first hydraulic cylinder. The first stamping die is installed at the lower end of the first mounting plate. The first stamping die matches the first stamping groove and the second stamping groove.

[0008] Further, the stamping mechanism includes a first guide rod. The first guide rod is arranged at the upper end of the first mounting plate. First guide sleeves are provided at both ends of the stamping frame. The first guide sleeves correspond to the first guide rods one by one. A first baffle is provided at the upper end of the first guide rod.

[0009] Furthermore, a first support plate is provided at the lower end of the frame, a first material receiving frame is provided at the upper end of the first support plate, a first through hole is provided in the middle of the stamping table, the first through hole corresponds to the first stamping groove and the second stamping groove, and the first material receiving frame corresponds to the first through hole.

[0010] Furthermore, a first clearance opening is provided at the right end of the frame, the first clearance opening matches the first material receiving frame, a first slide rail is provided at the upper end of the first support plate, a first roller is provided at the lower end of the first material receiving frame, the first roller matches the first slide rail, and a first handle is provided at the right end of the first material receiving frame.

[0011] Furthermore, the first driving mechanism includes a first cylinder, which is arranged at the right end of the stamping table, and the other end of the first cylinder is connected to the right end of the second mold.

[0012] The utility model discloses a long screw stamping die, which has the beneficial effect compared with the existing technology in that it can realize the stamping of long screws, and then push and pull the second die by the first cylinder to separate the first die, so that the long screw falls off naturally and falls into the first material receiving frame, which has higher production efficiency and is more convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram from one perspective of a preferred embodiment provided by the utility model.

[0014] Figure 2 It is a structural schematic diagram of another perspective of a preferred embodiment provided by the utility model.

[0015] The accompanying drawings include: 100, frame; 110, stamping table; 111, first through hole; 120, first support plate; 121, first slide rail; 130, first material receiving frame; 131, first roller; 132, first handle; 140, first clearance port / 210, first mold; 211, first stamping groove; 212, first positioning groove; 220, second mold; 221, second stamping groove; 222, first positioning column; 230, first cylinder; 300, stamping frame; 310, first hydraulic cylinder; 320, first mounting plate; 330, first stamping die; 340, first guide rod; 341, first baffle; 350, first guide cylinder. DETAILED DESCRIPTION

[0016] The utility model discloses a long screw punching die. The specific implementation of the utility model will be further described below in conjunction with preferred embodiments.

[0017] See attached figure Figure 1-2 , Figure 1It is a schematic structural view of a perspective of a preferred embodiment provided by the present utility model. Figure 2 It is a schematic structural view of another perspective of a preferred embodiment provided by the present utility model.

[0018] Preferred embodiment.

[0019] This embodiment provides a long screw stamping die, including a frame 100. A stamping table 110 is provided at the upper end of the frame 100. A stamping frame 300 is provided at the upper end of the stamping table 110. A stamping mechanism is provided at the lower end of the stamping frame 300. A die mechanism is provided at the upper end of the stamping table 110. The die mechanism includes a first die, a second die 220 and a first driving mechanism. The first die is fixedly arranged at the left end of the stamping frame 300. A guide rail is provided at the right end of the stamping table 110. A guide groove is provided at the lower end of the second die 220. The guide rail is matched with the guide groove. The first driving mechanism is used to drive the second die 220 to move. A first stamping groove 211 is provided at the right end of the first die. A second stamping groove 221 is provided at the left end of the second die 220. The first stamping groove 211 is matched with the second stamping groove 221.

[0020] Further, the stamping mechanism includes a first stamping die 330, a first hydraulic cylinder 310 and a first mounting plate 320. The first hydraulic cylinder 310 is installed at the lower end of the stamping frame 300. The first mounting plate 320 is installed at the lower end of the first hydraulic cylinder 310. The first stamping die 330 is installed at the lower end of the first mounting plate 320. The first stamping die 330 is matched with the first stamping groove 211 and the second stamping groove 221.

[0021] Further, the stamping mechanism includes a first guide rod 340. The first guide rod 340 is arranged at the upper end of the first mounting plate 320. First guide sleeves are provided at both ends of the stamping frame 300. The first guide sleeves correspond to the first guide rod 340 one by one. A first baffle 341 is provided at the upper end of the first guide rod 340.

[0022] Further, a first support plate 120 is provided at the lower end of the frame 100. A first material receiving frame 130 is provided at the upper end of the first support plate 120. A first through hole 111 is provided in the middle of the stamping table 110. The first through hole 111 corresponds to the first stamping groove 211 and the second stamping groove 221. The first material receiving frame 130 corresponds to the first through hole 111.

[0023] Furthermore, a first clearance opening is provided at the right end of the frame 100, and the first clearance opening matches the first material receiving frame 130. A first slide rail 121 is provided at the upper end of the first support plate 120, and a first roller 131 is provided at the lower end of the first material receiving frame 130, and the first roller 131 matches the first slide rail 121. A first handle 132 is provided at the right end of the first material receiving frame 130.

[0024] Furthermore, the first driving mechanism includes a first cylinder 230 , which is disposed at the right end of the punching table 110 , and the other end of the first cylinder 230 is connected to the right end of the second mold 220 .

[0025] Working principle: The first cylinder 230 pushes the second die 220 to move to the left. Through the cooperation of the guide rail and the guide groove, the first stamping groove 211 and the second stamping groove 221 are combined to form a complete stamping groove. The right end of the first die is provided with a first positioning groove 212, and the left end of the second die 220 is provided with a first positioning column 222. The first positioning column 222 corresponds to the first positioning groove 212 one-to-one, ensuring the stability of the first die and the second die 220. The screws to be punched are placed in the first punching groove 211 and the second punching groove 221. The first hydraulic cylinder 310 punches downward, driving the first mounting plate 320 to move downward. The first guide rod 340 ensures the linear downward movement of the first mounting plate 320, thereby ensuring that the first punching die 330 is aligned with the first punching groove 211 and the second punching groove 221 for punching. Then drive the first cylinder 230 to move the second mold 220 to the right, and the first mold and the second mold 220 are separated. The stamped long screw falls into the first material receiving frame 130 through the first through hole 111. The first material receiving frame 130 can be pulled out through the first handle 132 to transfer the long screw.

[0026] It is worth mentioning that the technical features such as the stamping groove involved in this utility model patent application should be regarded as prior art. The specific structure, working principle and possible control method and spatial layout method of these technical features can be selected by conventional means in the field, and should not be regarded as the utility model points of this utility model patent. This utility model patent will not be further elaborated.

[0027] For those skilled in the art, it is still possible to modify the technical solutions described in the aforementioned embodiments, or to replace some of the technical features therein with equivalents. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model should be included in the scope of protection of the present utility model.

Claims

1. A long screw stamping die, characterized in that, The invention comprises a frame (100), wherein the upper end of the frame (100) is provided with a punching platform (110), the upper end of the punching platform (110) is provided with a punching frame (300), the lower end of the punching frame (300) is provided with a punching mechanism, the upper end of the punching platform (110) is provided with a mold mechanism, the mold mechanism comprises a first mold, a second mold (220) and a first driving mechanism, the first mold is fixedly arranged at the left end of the punching frame (300), the right end of the punching platform (110) is provided with a guide rail, the lower end of the second mold (220) is provided with a guide groove, the guide rail matches the guide groove, the first driving mechanism is used to drive the second mold (220) to move, the right end of the first mold is provided with a first punching groove (211), the left end of the second mold (220) is provided with a second punching groove (221), the first punching groove (211) and the second punching groove (220) are connected to each other. 1); a first support plate (120) is provided at the lower end of the frame (100), a first material receiving frame (130) is provided at the upper end of the first support plate (120), a first through hole (111) is provided in the middle of the punching table (110), the first through hole (111) corresponds to the first punching groove (211) and the second punching groove (221), and the first material receiving frame (130) corresponds to the first through hole (111); a first clearance opening is provided at the right end of the frame (100), the first clearance opening matches the first material receiving frame (130), a first slide rail (121) is provided at the upper end of the first support plate (120), a first roller (131) is provided at the lower end of the first material receiving frame (130), the first roller (131) matches the first slide rail (121), and a first handle (132) is provided at the right end of the first material receiving frame (130).

2. The long screw stamping die according to claim 1, wherein, The stamping mechanism comprises a first stamping die (330), a first hydraulic cylinder (310) and a first mounting plate (320), wherein the first hydraulic cylinder (310) is mounted on the lower end of the stamping frame (300), the first mounting plate (320) is mounted on the lower end of the first hydraulic cylinder (310), the first stamping die (330) is mounted on the lower end of the first mounting plate (320), and the first stamping die (330) matches the first stamping groove (211) and the second stamping groove (221).

3. The long screw stamping die according to claim 2, wherein, The punching mechanism includes a first guide rod (340), the first guide rod (340) is arranged at the upper end of the first mounting plate (320), and first guide sleeves are provided at both ends of the punching frame (300), the first guide sleeves correspond to the first guide rod (340) one by one, and a first baffle (341) is provided at the upper end of the first guide rod (340).

4. The long screw stamping die according to claim 1, characterized in that, The first driving mechanism comprises a first cylinder (230), the first cylinder (230) is arranged at the right end of the punching table (110), and the other end of the first cylinder (230) is connected to the right end of the second mold (220).