Concrete pouring device for building equipment
By designing a concrete pouring device with stirring and cleaning and quantitative leveling functions, the problem of inconvenience of concrete solidification and cleaning is solved, efficient mixing and precise control are achieved, and working efficiency is improved.
Patent Information
- Application Number
- CN202421907323.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2025-07-29
- Estimated Expiration
- 2034-08-08
AI Technical Summary
The existing concrete mixing device may easily cause concrete to solidify when the storage time is long, and it will be inconvenient to clean, resulting in internal adhesion and accumulation, affecting the next use and reducing working efficiency.
A concrete pouring device including a mixing cleaning part and a quantitative leveling part is designed. The concrete is stirred by a motor drive the mixing rod, the scraper scrapes the sticky bottom, and the inner wall stack is slid by the cylinder driving the connecting rod to slide and scrape it away. The concrete usage is controlled in combination with the discharge pipe to reduce manual operation.
Effectively prevent the formation of concrete hard blocks, simplify the cleaning process, reduce manual operations, improve work efficiency and control accuracy of concrete filling.
Smart Images

Figure CN223161137U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a concrete pouring device for construction equipment. Background Technique
[0002] Concrete pouring refers to the process of pouring concrete into a mold until it is plasticized. In civil engineering construction, materials such as concrete are put into a mold to form a predetermined shape for building construction. Concrete refers to the general term for engineering composite materials in which aggregate is cemented into a whole by a cementitious material and is widely used in civil engineering. When pouring concrete, the free height of the concrete should not exceed 2m, and corresponding measures should be taken when it exceeds 3m.
[0003] Nowadays, the concrete mixing device often causes the concrete inside the device to solidify due to a long storage time. Generally, a mixing shaft is used to mix and stir the concrete. However, after this mixing method is used, a large amount of concrete adheres to the inner wall of the storage tank, which is not easy to clean. After long-term use, accumulation occurs, which is not convenient for the next use. After pouring, manual scraping of the excess concrete is required, which is time-consuming and laborious and reduces work efficiency. Content of the Utility Model
[0004] The purpose of the utility model is to provide a concrete pouring device for construction equipment to solve the problems put forward in the above background technique.
[0005] To achieve the above purpose, the utility model provides the following technical solution: A concrete pouring device for construction equipment, including a bottom plate, four moving wheels are fixedly installed at the bottom of the bottom plate, a push plate is fixedly installed at the top of the bottom plate, a push rod is arranged inside the push plate, and a protective pad is fixedly sleeved on the outer wall of the push rod. A controller is fixedly installed on the outer surface of the push plate, and a mixing tank is fixedly installed at the top of the bottom plate; a mixing and pouring assembly is arranged inside and above the mixing tank; the mixing and pouring assembly includes: a mixing and cleaning part, the mixing and cleaning part is arranged inside and above the mixing tank; a quantitative leveling part, the quantitative leveling part is arranged on one side of the mixing tank.
[0006] Preferably, the mixing and cleaning part includes: a top plate, the top plate is fixedly installed on the top of the mixing tank; a motor is arranged above the top plate and is fixedly installed on the top of the top plate through a motor cover, the output end of the motor is provided with a mixing rod, and the mixing rod movably penetrates through the top plate and extends into the mixing tank. Stirring blades are equidistantly and evenly sleeved on the outer wall of the mixing rod, and a first scraper is fixedly installed at the bottom of the mixing rod.
[0007] Preferably, a connection frame is fixedly installed on the top of the top plate. A long installation plate is fixedly installed on the top of the connection frame. A chute is provided on the inner wall of the connection frame, and there are two groups in a group, with a total of two groups. A cylinder one is fixedly installed on the top of the long installation plate.
[0008] Preferably, a connecting rod one is provided at the ejecting end of the cylinder one. The connecting rod one movably penetrates through the long installation plate and extends into the connection frame. A cross plate is fixedly installed at the bottom of the connecting rod one. A limiting groove is provided on the top of the top plate.
[0009] Preferably, a connecting sliding plate is fixedly installed at the bottom of the cross plate. The connecting sliding plate is slidably connected with the chute. A scraping plate two is fixedly installed at the bottom of the connecting sliding plate, and there are two groups in a group, with a total of two groups.
[0010] Preferably, the quantitative leveling part includes: a discharge pipeline, which is communicated and arranged on one side of the mixing tank; support columns, which are fixedly installed on the top of the bottom plate, with a total of two groups; a return plate is arranged below the discharge pipeline, and the return plate is fixedly installed on the outer surface of the bottom plate. A clamping groove is provided on one side of the return plate. A baffle is slidably connected inside the clamping groove. A telescopic rod is fixedly installed on one side of the baffle, and the telescopic rod is fixedly installed inside the bottom plate.
[0011] Preferably, a mounting plate is fixedly installed on the top of the support column. A cylinder two is fixedly installed on the top of the mounting plate, and there are two groups in total. A connecting rod two is provided at the ejecting end of the cylinder two. A pressing plate is fixedly installed at the bottom of the connecting rod two.
[0012] The utility model provides a concrete pouring device for construction equipment. It has the following beneficial effects:
[0013] (1). By setting the top plate, the motor drives the stirring rod to rotate, so that the stirring blades stir the concrete, preventing it from hardening after being placed for too long. At the same time, the scraping plate one rotates to scrape the bottom of the mixing tank to prevent sticking to the bottom. Further, after use, the cylinder one drives the connecting rod one downward, so that the cross plate drives the connecting sliding plate to slide downward inside the chute, so that the scraping plate two scrapes the inner wall of the mixing tank, avoiding long-term accumulation and caking, which affects the next use, achieving the effect of facilitating the stirring of concrete and cleaning the mixing tank.
[0014] (2). By setting the discharge pipeline, the conveying pump discharges the concrete from the discharge pipeline. The telescopic rod drives the baffle to retract and extend back and forth to control the amount of concrete used. Further, the cylinder two drives the connecting rod two downward, so that the pressing plate levels the filled concrete, reducing the workload of the staff, achieving the effect of facilitating the control of the concrete filling amount and improving the work efficiency. Description of the Drawings
[0015] Figure 1 is a schematic diagram of the overall structure of the present utility model;
[0016] Figure 2 is a side view of the structure of a concrete pouring device for a construction equipment of the present utility model;
[0017] Figure 3 is a top view of the structure of the stirring part of a concrete pouring device for a construction equipment of the present utility model;
[0018] Figure 4 is a side view of the structure of the metering part of a concrete pouring device for a construction equipment of the present utility model.
[0019] In the figure: 1 bottom plate, 2 moving wheels, 3 push plate, 4 protective pad, 5 controller, 6 mixing tank, 61 feeding pipe, 62 flip cover, 63 observation window, 7 mixing and pouring assembly, 71 mixing and cleaning part, 711 top plate, 712 motor, 713 stirring rod, 714 stirring blade, 715 scraper one, 716 connecting frame, 717 long mounting plate, 718 chute, 719 cylinder one, 7110 connecting rod one, 7111 cross plate, 7112 limiting groove, 7113 connecting sliding plate, 7114 scraper two, 72 metering and leveling part, 721 discharge pipe, 722 return plate, 723 card slot, 724 baffle, 725 telescopic rod, 726 support column, 727 mounting plate, 728 cylinder two, 729 connecting rod two, 7210 pressing plate. Detailed Description of the Invention
[0020] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0021] Examples of the embodiments are shown in the accompanying drawings, where the same or similar reference numerals represent the same or similar elements or elements with the same or similar functions throughout. The embodiments described below by referring to the accompanying drawings are exemplary and are intended to explain the present utility model and should not be construed as a limitation of the present utility model.
[0022] Embodiment 1
[0023] A preferred embodiment of a concrete pouring device for a construction equipment provided by the present utility model is as follows Figures 1-4As shown: A concrete pouring device for construction equipment, including a bottom plate 1, on the bottom of which four moving wheels 2 are fixedly installed. On the top of the bottom plate 1, a push plate 3 is fixedly installed. Inside the push plate 3, there is a push rod, and a protective pad 4 is fixedly sleeved on the outer wall of the push rod. On the outer surface of the push plate 3, a controller 5 is fixedly installed. On the top of the bottom plate 1, a mixing tank 6 is fixedly installed; a mixing and pouring assembly 7, which is arranged inside and above the mixing tank 6; the mixing and pouring assembly 7 includes: a mixing and cleaning part 71, which is arranged inside and above the mixing tank 6; a quantitative leveling part 72, which is arranged on one side of the mixing tank 6.
[0024] The mixing and cleaning part 71 includes: a top plate 711, which is fixedly installed on the top of the mixing tank 6; above the top plate 711, there is a motor 712, which is fixedly installed on the top of the top plate 711 through a motor cover. The output end of the motor 712 is provided with a stirring rod 713, and the stirring rod 713 movably penetrates through the top plate 711 and extends into the mixing tank 6. On the outer wall of the stirring rod 713, stirring blades 714 are equidistantly and evenly sleeved. At the bottom of the stirring rod 713, a first scraper 715 is fixedly installed.
[0025] On the top of the top plate 711, a connecting frame 716 is fixedly installed. On the top of the connecting frame 716, a long installation plate 717 is fixedly installed. Inside the inner wall of the connecting frame 716, chute 718 is provided, and there are two in a group, with a total of two groups. On the top of the long installation plate 717, a first cylinder 719 is fixedly installed.
[0026] The ejecting end of the first cylinder 719 is provided with a first connecting rod 7110, and the first connecting rod 7110 movably penetrates through the long installation plate 717 and extends into the connecting frame 716. At the bottom of the first connecting rod 7110, a cross plate 7111 is fixedly installed. On the top of the top plate 711, a limiting groove 7112 is opened.
[0027] At the bottom of the cross plate 7111, a connecting sliding plate 7113 is fixedly installed, and the connecting sliding plate 7113 is slidably connected with the chute 718. At the bottom of the connecting sliding plate 7113, second scrapers 7114 are fixedly installed, and there are two in a group, with a total of two groups.
[0028] Furthermore, in this embodiment, by setting the top plate 711, the controller 5 turns on the power supply, the motor 712 drives the stirring rod 713 to rotate, so that the stirring blades 714 stir the concrete to prevent it from hardening due to long placement time. At the same time, the first scraper 715 rotates to scrape the bottom of the mixing tank 6 to prevent sticking to the bottom.
[0029] Further, after use, the first cylinder 719 drives the first connecting rod 7110 downward, causing the cross plate 7111 to drive the connecting slide plate 7113 to slide downward inside the chute 718, so that the second scraper 7114 scrapes the inner wall of the mixing tank 6, preventing long-term accumulation and caking, which may affect future use, facilitating the mixing of concrete, and cleaning the mixing tank 6.
[0030] Embodiment 2
[0031] Based on Embodiment 1, a preferred embodiment of the concrete pouring device for construction equipment provided by the present utility model is as Figures 1-4 shown: The quantitative leveling part 72 includes: a discharge pipe 721, which is communicatively arranged on one side of the mixing tank 6; support columns 726, which are fixedly installed on the top of the bottom plate 1, with a total of two groups; a return plate 722 is arranged below the discharge pipe 721, and the return plate 722 is fixedly installed on the outer surface of the bottom plate 1. A card slot 723 is opened on one side of the return plate 722, and a baffle 724 is slidably connected inside the card slot 723. One side of the baffle 724 is fixedly installed with a telescopic rod 725, and the telescopic rod 725 is fixedly installed inside the bottom plate 1.
[0032] The top of the support column 726 is fixedly installed with a mounting plate 727, and the top of the mounting plate 727 is fixedly installed with second cylinders 728, with a total of two groups. The ejecting end of the second cylinder 728 is provided with a second connecting rod 729, and the bottom of the second connecting rod 729 is fixedly installed with a flattening plate 7210.
[0033] Further, in this embodiment, by setting the discharge pipe 721, the concrete is discharged from the discharge pipe 721 by a delivery pump. The telescopic rod 725 drives the baffle 724 to expand and contract back and forth to control the amount of concrete used. Further, the second cylinder 728 drives the second connecting rod 729 downward, so that the flattening plate 7210 flattens the filled concrete, reducing the workload of the staff, facilitating the control of the concrete filling amount, and improving the work efficiency.
[0034] In use, first, the controller 5 is powered on, the motor 712 drives the stirring rod 713 to rotate, so that the stirring blades 714 stir the concrete to prevent it from hardening due to long placement time. At the same time, the first scraper 715 rotates to scrape the bottom of the mixing tank 6 to prevent sticking to the bottom. Further, there is a discharge pipeline 721 provided, and the transfer pump discharges the concrete from the discharge pipeline 721. The expansion and contraction rod 725 drives the baffle 724 to expand and contract back and forth to control the amount of concrete used. Further, the second cylinder 728 drives the second connecting rod 729 downward, so that the pressing plate 7210 levels the filled concrete, reducing the workload of the staff, facilitating the control of the concrete filling amount, and improving work efficiency. Finally, after use, the first cylinder 719 drives the first connecting rod 7110 downward, so that the cross plate 7111 drives the connecting slide plate 7113 to slide downward inside the chute 718, so that the second scraper 7114 scrapes the inner wall of the mixing tank 6 to avoid long-term accumulation and hardening, which affects the next use, facilitating the mixing of concrete and cleaning the mixing tank 6.
[0035] Finally, it should be noted that the above are only the preferred embodiments of the present invention and are not used to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A concrete pouring device for construction equipment, comprising a bottom plate (1), characterized in that: The bottom of the bottom plate (1) is fixedly installed with moving wheels (2), and there are four groups in total. The top of the bottom plate (1) is fixedly installed with a push plate (3). Inside the push plate (3) is provided a push rod, and a protective pad (4) is fixedly sleeved on the outer wall of the push rod. A controller (5) is fixedly installed on the outer surface of the push plate (3). The top of the bottom plate (1) is fixedly installed with a mixing tank (6); A mixing and pouring assembly (7), and the mixing and pouring assembly (7) is arranged inside and above the mixing tank (6); The mixing and pouring assembly (7) includes: A mixing and cleaning part (71), and the mixing and cleaning part (71) is arranged inside and above the mixing tank (6); A quantitative leveling part (72), and the quantitative leveling part (72) is arranged on one side of the mixing tank (6).
2. The concrete pouring device for construction equipment according to claim 1, wherein: The mixing and cleaning part (71) includes: A top plate (711), and the top plate (711) is fixedly installed on the top of the mixing tank (6); Above the top plate (711) is provided a motor (712), and it is fixedly installed on the top of the top plate (711) through a motor cover. The output end of the motor (712) is provided with a stirring rod (713), and the stirring rod (713) movably penetrates through the top plate (711) and extends into the interior of the mixing tank (6). Stirring blades (714) are equidistantly and evenly sleeved on the outer wall of the stirring rod (713). A first scraper (715) is fixedly installed at the bottom of the stirring rod (713).
3. The concrete pouring device for construction equipment according to claim 2, characterized in that: A connecting frame (716) is fixedly installed on the top of the top plate (711). A long installation plate (717) is fixedly installed on the top of the connecting frame (716). Inside the inner wall of the connecting frame (716) are provided chutes (718), and there are two in a group, with a total of two groups. A first cylinder (719) is fixedly installed on the top of the long installation plate (717).
4. The concrete pouring device for construction equipment according to claim 3, characterized in that: The ejecting end of the first cylinder (719) is provided with a first connecting rod (7110), and the first connecting rod (7110) movably penetrates through the long installation plate (717) and extends into the interior of the connecting frame (716). A cross plate (7111) is fixedly installed at the bottom of the first connecting rod (7110). A limiting groove (7112) is opened on the top of the top plate (711).
5. The concrete pouring device for construction equipment according to claim 4, characterized in that: A connecting sliding plate (7113) is fixedly installed at the bottom of the cross plate (7111), and the connecting sliding plate (7113) is slidably connected with the chute (718). Second scrapers (7114) are fixedly installed at the bottom of the connecting sliding plate (7113), and there are two in a group, with a total of two groups.
6. The concrete pouring device for construction equipment according to claim 1, characterized in that: The quantitative leveling part (72) includes: A discharge pipe (721), and the discharge pipe (721) is communicated and arranged on one side of the mixing tank (6); Support columns (726), and the support columns (726) are fixedly installed on the top of the bottom plate (1), with a total of two groups; A return-shaped plate (722) is arranged below the discharge pipeline (721), and the return-shaped plate (722) is fixedly installed on the outer surface of the bottom plate (1). A clamping groove (723) is formed on one side of the return-shaped plate (722), and a baffle plate (724) is slidably connected inside the clamping groove (723). One side of the baffle plate (724) is fixedly installed with a telescopic rod (725), and the telescopic rod (725) is fixedly installed inside the bottom plate (1).
7. The concrete pouring device for construction equipment according to claim 6, characterized in that: The top of the support column (726) is fixedly installed with a mounting plate (727). The top of the mounting plate (727) is fixedly installed with two sets of cylinders two (728). The ejecting end of the cylinder two (728) is provided with a connecting rod two (729), and the bottom of the connecting rod two (729) is fixedly installed with a pressing flat plate (7210).