High-rise flue installation plugging device

By integrating the cast flue slots and structural plates in the building, combining fire-proof sealing materials and vertical positioners, the vertical and sealing problems of high-rise flue are solved, and the stability and seismic resistance of the flue are improved.

CN223214895UActive Publication Date: 2025-08-12SHANXI WUJIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422533666.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2025-08-12
Estimated Expiration
2034-10-21

AI Technical Summary

Technical Problem

In construction projects, the verticality of high-rise flue is difficult to ensure, and the flue junction is prone to leaking air and smoke, and the prior art cannot effectively prevent and treat it.

Method used

The flue slot is integrated into molding and structural plate, combined with organic fireproof sealing mud, EVA fireproof and flame retardant leak plug belt and vertical positioner, to ensure the verticality and sealing of the flue, and the docking and flexible connection of the upper and lower flues are achieved through the cooperation of gravity balls and wire wires.

Benefits of technology

Effectively prevent air and smoke leakage at the junction of the flue, improve the overall stability and durability of the flue, reduce the risk of leakage, and enhance the earthquake resistance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223214895U_ABST
    Figure CN223214895U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-rise flue installation plugging device, which belongs to the technical field of flue construction and comprises a flue clamping groove, a structural plate, organic fireproof sealing mud, a finished flue, an EVA fireproof flame-retardant plugging belt, a vertical positioner, a clamping groove, a vertical line fixing block, a steel wire and a gravity ball. The flue clamping groove is reserved through the cast-in-place structure, the finished product flue is installed in the flue clamping groove in the later period, the gap between the finished product flue and the flue clamping groove is blocked through organic fireproof sealing mud, the vertical positioners are installed on the upper layer finished product flue and the lower layer finished product flue, and the perpendicularity of the finished product flue during installation is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of flue construction, in particular to a high-rise flue installation and blocking device. Background Art

[0002] In residential construction projects, the focus of residential quality has gradually shifted to leakage issues. From the results of the owners' inspection of building quality, it was found that common leakage hazards include the flue holes in the bathroom and kitchen floors. Effective prevention and control measures are often not taken, and air and smoke leaks often occur at the junction of the flues. The verticality of the flue parts cannot be guaranteed. Judging from previous design drawings and on-site construction conditions, the main problem with the flue holes in the floor slabs is that when the flue holes are poured and filled and the counter-ridges are poured, there is a construction joint between the flue holes and the floor structure. Not only are there many processes, but it also brings huge leakage risks in later use. Summary of the Invention

[0003] The purpose of the utility model is to solve the problems raised in the background technology and to provide a high-rise flue installation and blocking device.

[0004] The technical solution of the utility model to achieve the above purpose is:

[0005] A high-rise flue installation and sealing device comprises a flue card slot, a structural plate and a finished flue arranged on each floor, the flue card slot is fixedly connected to the structural plate, the bottom end of the finished flue is fixed in the flue card slot, and an organic fireproof sealing mud is arranged between the flue card slot and the finished flue; EVA fireproof and flame-retardant plugging tapes are fixed at the flue openings at both ends of the finished flue, a card slot is fixed at the top of the finished flue, a vertical positioner is fixed at the bottom of the finished flue, a vertical line fixing block is fixed on the vertical positioner, a steel wire is connected to the vertical line fixing block, and a gravity ball is connected to the other end of the steel wire.

[0006] The bottom flue opening of the upper finished flue is butted against the top flue opening of the lower finished flue, and the gravity ball at the bottom of the upper finished flue is clamped in the clamping groove at the top of the lower finished flue.

[0007] Preferably, the flue slot and the structural plate are integrally cast using a reinforced concrete structure.

[0008] Preferably, the gap between the bottom end of the finished flue and the flue slot is 20 mm.

[0009] Preferably, waterproof mortar is provided between the flue slot and the finished flue.

[0010] Preferably, a waterproof layer is provided on the outside of the flue slot, and the waterproof layer is fixedly connected to the flue slot.

[0011] The utility model provides a high-rise flue installation and blocking device, which has the following beneficial effects:

[0012] Through its structural design, this device requires that before the finished flue needs to be installed, the flue groove is first cast on the structural plate, and then the finished flues are installed. During installation, the vertical positioner is pasted on the finished flue of the upper layer, and the pasting position is positioned in advance on the finished flue. After the vertical positioner is pasted on the upper finished flue, the position of the upper finished flue is adjusted. Under the action of gravity, the gravity ball located below the vertical fixing block will be fixed in a vertical position by the wire rope. When the gravity ball is fixed to the positioning groove on the finished flue of this layer, the finished flues of the upper and lower layers are connected. The connection is adhered with EVA fire-retardant sealing tape for flexible connection, so that there will be no gap at the junction, and it is tightly sealed to prevent the finished flue from leaking air or smoke at the junction. After the finished flue is connected, the gap between the finished flue and the flue groove is sealed with organic fire-proof sealing mud to complete the installation and construction of the high-rise flue. Compared with the existing technology, the utility model reserves a flue slot through a cast-in-place structure, and the finished flue is installed in the flue slot at a later stage. The gap between the finished flue and the flue slot is sealed with organic fireproof sealing mud, and vertical positioners are installed on the upper finished flue and the lower finished flue to ensure the verticality of the finished flue during installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural diagram of the present utility model.

[0014] Figure 2 It is a structural diagram of the flue slot in the utility model.

[0015] Figure 3 yes Figure 2 Cross-sectional view of .

[0016] Figure 4 It is a schematic diagram of the connection of the finished flue in the utility model.

[0017] Figure 5 It is a structural diagram of the vertical positioner in the utility model.

[0018] In the figure: 1. Flue slot; 2. Structural plate; 3. Organic fireproof sealing mud; 4. Finished flue; 5. EVA fire-retardant leak-proofing tape; 6. Vertical positioner; 7. Positioning slot; 8. Vertical fixing block; 9. Steel wire; 10. Gravity ball; 11. Waterproof mortar; 12. Waterproof layer. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0020] In the description of this utility model, it should be noted that the terms "upper / lower end," "inner," "outer," "front end," "rear end," "both ends," "one end," "the other end," and the like, indicating positions or relationships, are based on the positions or relationships shown in the accompanying drawings and are intended solely to facilitate the description of this utility model and simplify the description. They do not indicate or imply that the devices or components referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limitations on this utility model. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0021] In the description of the present invention, it should be noted that, unless otherwise expressly specified or limited, the terms "installed," "set / mounted," "sleeved," "connected," etc., should be understood in a broad sense. For example, "connected" may refer to a fixed connection, a detachable connection, or an integral connection; it may refer to a mechanical connection or an electrical connection; it may refer to a direct connection or an indirect connection through an intermediate medium; it may refer to internal communication between two components. Those skilled in the art will understand the specific meanings of the above terms in the present invention based on the specific circumstances.

[0022] See also Figure 1-5 The utility model provides a technical solution: a high-rise flue installation and blocking device, comprising a flue card slot 1, a structural plate 2 and a finished flue 4 arranged on each floor, the flue card slot 1 is fixedly connected to the structural plate 2, the bottom end of the finished flue 4 is fixed in the flue card slot 1, and an organic fire-proof sealing mud 3 is arranged between the flue card slot 1 and the finished flue 4; EVA fire-retardant sealing tape 5 is fixed at the flue openings at both ends of the finished flue 4, the top of the finished flue 4 is fixed with a card slot 7, the bottom of the finished flue 4 is fixed with a vertical positioner 6, a vertical line fixing block 8 is fixed on the vertical positioner 6, a steel wire 9 is connected to the vertical line fixing block 8, and the other end of the steel wire 9 is connected with a gravity ball 10; the bottom flue opening of the finished flue 4 of the upper layer is docked with the top flue opening of the finished flue 4 of the lower layer, and the gravity ball 10 at the bottom of the finished flue 4 of the upper layer is stuck in the card slot 7 at the top of the finished flue 4 of the lower layer.

[0023] In the present invention, the flue slot 1 and the structural plate 2 are cast in one piece using reinforced concrete. This one-time casting reduces construction joints, greatly reduces the risk of leakage, and improves the overall stability and durability of the flue.

[0024] In the present invention, the bottom end of the finished flue 4 is located in the flue slot 1 and the gap between the flue slot 1 and the flue slot 1 is 20 mm. The 20 mm reserved space between the finished flue 4 and the flue slot 1 facilitates construction and adjustment.

[0025] In the present invention, waterproof mortar 11 is provided between the flue slot 1 and the finished flue 4. The waterproof mortar 11 is fixedly connected to the flue slot 1, and the organic fireproof sealing mud 3 is provided between the waterproof mortar 11 and the finished flue 4. Adding the waterproof mortar 11 to the gap between the finished flue 4 and the flue slot 1 effectively prevents leakage.

[0026] In the present invention, a waterproof layer 12 is provided on the outside of the flue slot 1, and the waterproof layer 12 is fixedly connected to the flue slot 1. The waterproof layer 12 on the flue slot 1 further enhances the anti-leakage ability of the flue slot 1 and prolongs the service life of the finished flue 4.

[0027] In this embodiment: before the finished flue 4 needs to be installed, the flue slot 1 is first cast on the structural plate 2. The waterproof layer 12 on the flue slot 1 further strengthens the anti-leakage ability of the flue slot 1, prolongs the service life of the finished flue 4, and the one-time casting reduces the construction joints, greatly reduces the risk of leakage, and improves the overall stability and durability of the flue. Then the finished flue 4 is installed. During installation, the vertical positioner 6 is pasted on the upper finished flue 4. The pasting position is positioned in advance on the finished flue 4. After the vertical positioner 6 is pasted on the upper finished flue 4, the position of the upper finished flue 4 is adjusted. Under the action of gravity, the gravity ball 10 below the vertical fixing block 8 will be The steel wire rope 9 is fixed in a vertical position. When the gravity ball 10 is fixed to the positioning groove 7 on the finished flue 4 of this layer, the finished flues 4 of the upper and lower layers are connected. The connection is glued with EVA fire-retardant leak-proof tape 5 for flexible connection. The flexible connection improves the seismic performance of the flue system, reduces cracks caused by building vibration or temperature changes, and prevents gaps at the junction. The seal is tight to prevent the finished flue 4 from leaking air and smoke at the junction. After the finished flue 4 is connected, the gap between the finished flue 4 and the flue slot 1 is sealed with organic fire-proof sealing mud 3 to complete the installation and construction of the high-rise flue. Leakage can be effectively prevented by adding waterproof mortar 11 to the gap between the finished flue 4 and the flue slot 1.

[0028] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "include," "comprise," or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article, or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or device. In the absence of further limitations. The phrase "includes an element defined by..." does not exclude the presence of other identical elements in the process, method, article, or device that includes the element.

[0029] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high-rise flue installation and blocking device, characterized in that: The invention comprises a flue card slot (1), a structural plate (2) and a finished flue (4) arranged on each layer, the flue card slot (1) is fixedly connected to the structural plate (2), the bottom end of the finished flue (4) is fixed in the flue card slot (1), and an organic fireproof sealing mud (3) is arranged between the flue card slot (1) and the finished flue (4); EVA fireproof and flame-retardant plugging tapes (5) are fixed at the flue openings at both ends of the finished flue (4), a positioning slot (7) is fixed at the top of the finished flue (4), a vertical positioner (6) is fixed at the bottom of the finished flue (4), a vertical line fixing block (8) is fixed on the vertical positioner (6), a steel wire (9) is connected to the vertical line fixing block (8), and the other end of the steel wire (9) is connected to a gravity ball (10); The bottom flue opening of the finished flue (4) of the upper layer is butted against the top flue opening of the finished flue (4) of the lower layer, and the gravity ball (10) at the bottom of the finished flue (4) of the upper layer is clamped in the clamping groove (7) at the top of the finished flue (4) of the lower layer.

2. The high-rise flue installation and blocking device according to claim 1 is characterized in that: The flue slot (1) and the structural plate (2) are integrally cast and formed using a reinforced concrete structure.

3. The high-rise flue installation and blocking device according to claim 1, characterized in that: The gap between the bottom end of the finished flue (4) and the flue slot (1) is 20 mm.

4. The high-rise flue installation and blocking device according to claim 1, characterized in that: Waterproof mortar (11) is provided between the flue slot (1) and the finished flue (4).

5. The high-rise flue installation and blocking device according to claim 1, characterized in that: A waterproof layer (12) is provided on the outside of the flue slot (1), and the waterproof layer (12) is fixedly connected to the flue slot (1).