Turnover outer frame protection skirting board
By changing the iron skirting board to steel and fixing it with ring locks, the problems of low strength and inability to turnover of the iron skirting board are solved, and high-strength, multiple turnover and environmentally friendly skirting boards are achieved, improving construction efficiency and appearance quality.
Patent Information
- Application Number
- CN202422037398.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2025-08-15
- Estimated Expiration
- 2034-08-21
AI Technical Summary
In the prior art, the iron skirting boards of steel pipe outer frames have low strength, are easy to damage and cannot be used in turnover, which is not conducive to energy conservation and environmental protection.
A steel skirting board is used and grooves are opened on both sides of the edges, and a ring lock is installed to fix it. The ring lock can be rotated and used multiple times.
It improves the strength and durability of the skirting board, realizes multiple turnovers, conforms to the concept of energy conservation and environmental protection, and improves construction efficiency and visual quality.
Smart Images

Figure CN223227035U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building structures, in particular to a protective skirting board with a rotatable external frame. Background Art
[0002] For conventional steel pipe external frames, the supporting skirting boards are made of iron, and the conventional method is to fix them by wrapping iron wire around the external frame uprights. In the conventional method, the iron skirting boards have low strength and are easily damaged, and the iron wire cannot be recycled after use, which is not conducive to energy saving and environmental protection.
[0003] A novel scaffolding skirting board is disclosed in the prior art (Announcement No.: CN215254512U), referring to paragraph
[0018] of its specification, which comprises a main body 1 and an arc buckle 2. The main body 1 comprises a first steel plate 101 and a second steel plate 102, and the first steel plate 101 and the second steel plate 102 are vertically connected to each other. The vertical connection facilitates the placement of the main body 1 on the scaffolding. Two symmetrical sets of arc buckles 2 are provided on both sides of the first steel plate 101. The arc buckles 2 at both ends of the first steel plate 101 are directly buckled onto the scaffolding uprights to complete the installation, thereby preventing people or other objects from falling outside the scaffolding, making the overall installation convenient, safe and reliable.
[0004] Although the scaffolding described above can achieve the purpose of being fastened to the scaffolding uprights, it is relatively complicated to produce and the production cost is relatively high. Utility Model Content
[0005] The purpose of the utility model is to provide a rotatable external frame protective skirting board to solve the problems of low strength, easy damage and non-rotatable use in the prior art.
[0006] To achieve the above purpose, the specific technical solution of a revolvable external frame protective skirting board of the utility model is as follows:
[0007] A rotatable external frame protective skirting board comprises a steel skirting board. Grooves are provided on both side edges of the skirting board. Ring locks for sleeved steel pipes are sleeved in both side grooves of the skirting board.
[0008] Preferably, the diameter of the ring lock is 50 mm.
[0009] Preferably, the skirting board is provided with four grooves, and the grooves on both sides are symmetrically arranged.
[0010] Preferably, the skirting board is arranged horizontally, and trapezoidal grooves are arranged at intervals on the skirting board.
[0011] Preferably, the ring lock is provided with a ring opening for penetrating into the groove.
[0012] Preferably, the lower ends of the skirting boards are arranged on the upper ends of the transversely arranged external frame protection rods.
[0013] The utility model provides a revolving external frame protective skirting board with the following advantages:
[0014] By optimizing conventional iron skirting boards into steel ones, they are stronger, more durable, and less prone to deformation than steel skirting boards, allowing for repeated use. Furthermore, the fixing method has been optimized from wire to a matching, pre-made ring lock, which can be reused multiple times, in line with energy conservation and environmental protection concepts. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall structure provided by the utility model;
[0016] Figure 2 A top view of the structure provided by the utility model;
[0017] Figure 3 A schematic diagram of the ring lock provided by the utility model;
[0018] Figure 4 This is a schematic diagram of the usage status provided by the utility model.
[0019] In the figure: 1. Skirting board; 2. Groove; 3. Ring lock; 4. Ring opening. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0021] See Figures 1 to 4 The utility model provides a rotatable external frame protective skirting board for use in external frame construction occasions. The rotatable external frame protective skirting board comprises a steel skirting board 1. Grooves 2 are provided on both side edges of the skirting board 1. Ring locks 3 for sleeved steel pipes are provided in the grooves 2 on both sides of the skirting board 1.
[0022] The conventional iron skirting board 1 is optimized to steel. The steel skirting board 1 has the advantages of high strength, resistance to deformation, and repeated use. At the same time, grooves 2 are provided on both sides of the skirting board 1. Two symmetrical grooves 2 are provided on each side of the skirting board 1, and four grooves are provided evenly on each skirting board 1. A ring lock 3 is inserted into each groove 2. When installing the outer protective frame, the ring lock 3 is pre-installed on the vertical outer protective frame. After the ring lock 3 is installed, the skirting board 1 is installed. At this time, the ring opening 4 of the ring lock 3 is inserted into the groove 2 on the skirting board 1. After the groove 2 and the ring lock 3 are inserted one by one, the skirting board 1 is fixed. During installation, the skirting board 1 is placed along the horizontal outer protective frame.
[0023] Furthermore, the skirting board 1 is arranged horizontally, with trapezoidal grooves spaced apart. To protect the skirting board 1 from various construction loads and environmental pressures when subjected to external forces, the present application adopts a horizontal arrangement of the skirting board 1, with trapezoidal grooves spaced apart. This arrangement not only takes functionality into consideration, but also aesthetics into account. The uniform grooved structure creates a visual regularity and aesthetic appeal, enhancing the overall visual quality of the building exterior frame.
[0024] Furthermore, a small circular ring is provided on the ring lock 3 as an opening 4. The ring opening 4 allows the ring lock 3 to be quickly attached to the skirting board 1. No complex tools or techniques are required; simple pulling and pushing actions can achieve rapid installation and removal. This greatly improves work efficiency for construction workers. When the skirting board 1 needs to be replaced or repaired, the ring lock 3 can be quickly removed from the groove 2 through the ring opening 4, without the need for large-scale disassembly of the entire platform or scaffolding. This effectively saves time and manpower for maintenance work.
[0025] Furthermore, the diameter of the ring lock 3 is set to 50 mm, so that it can move freely within a certain range, so that the specific position of the skirting board 1 can be adjusted according to actual needs. This can meet the diverse needs of the construction site and adapt to different construction environments and stages that require different protective settings. Since the diameter of the ring lock 3 is 50 mm, it can be adapted to rods of different diameters. At the same time, as a unified specification length, it is also effectively convenient for production and replacement. It includes a steel skirting board 1, and grooves 2 are provided on both side edges of the skirting board 1. Ring locks 3 for sleeved steel pipes are both sleeved in the grooves 2 on both sides of the skirting board 1.
[0026] The conventional iron skirting board 1 is optimized to steel. The steel skirting board 1 has the advantages of high strength, resistance to deformation, and repeated use. At the same time, grooves 2 are provided on both sides of the skirting board 1. Two symmetrical grooves 2 are provided on each side of the skirting board 1, and four grooves are provided evenly on each skirting board 1. A ring lock 3 is inserted into each groove 2. When installing the outer protective frame, the ring lock 3 is pre-installed on the vertical outer protective frame. After the ring lock 3 is installed, the skirting board 1 is installed. At this time, the ring opening 4 of the ring lock 3 is inserted into the groove 2 on the skirting board 1. After the groove 2 and the ring lock 3 are inserted one by one, the skirting board 1 is fixed. During installation, the skirting board 1 is placed along the horizontal outer protective frame.
[0027] Furthermore, the skirting board 1 is arranged horizontally, with trapezoidal grooves spaced apart. To protect the skirting board 1 from various construction loads and environmental pressures when subjected to external forces, the present application adopts a horizontal arrangement of the skirting board 1, with trapezoidal grooves spaced apart. This arrangement not only takes functionality into consideration, but also aesthetics into account. The uniform grooved structure creates a visual regularity and aesthetic appeal, enhancing the overall visual quality of the building exterior frame.
[0028] Furthermore, a small circular ring is provided on the ring lock 3 as an opening 4. The ring opening 4 allows the ring lock 3 to be quickly attached to the skirting board 1. No complex tools or techniques are required; simple pulling and pushing actions can achieve rapid installation and removal. This greatly improves work efficiency for construction workers. When the skirting board 1 needs to be replaced or repaired, the ring lock 3 can be quickly removed from the groove 2 through the ring opening 4, without the need for large-scale disassembly of the entire platform or scaffolding. This effectively saves time and manpower for maintenance work.
[0029] Furthermore, the 50mm diameter of the ring lock 3 allows for free movement within a certain range, allowing the specific position of the skirting board 1 to be adjusted as needed. This is crucial for meeting the diverse needs of construction sites, adapting to different protective configurations required for different construction environments and phases. The 50mm diameter of the ring lock 3 allows it to accommodate rods of varying diameters, while also being a uniform length, facilitating production and replacement.
[0030] The beneficial effects of this application are: by optimizing conventional iron skirting boards into steel skirting boards, compared to steel skirting boards, they are stronger, less prone to deformation, and can be reused repeatedly. At the same time, the fixing method is optimized from iron wire to a matching finished ring lock, which can be reused repeatedly, conforming to the concept of energy conservation and environmental protection, and facilitating maintenance and replacement.
[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A revolvable external frame protective skirting board, characterized in that: The invention comprises a steel skirting board (1), wherein grooves (2) are provided on both side edges of the skirting board (1), and circular locks (3) for sleeve-connecting steel pipes are sleeved in the grooves (2) on both sides of the skirting board (1); and a circular opening (4) for penetrating the grooves (2) is provided on the circular locks (3).
2. The revolving external frame protective skirting board according to claim 1 is characterized in that: The diameter of the ring lock (3) is 50 mm.
3. The revolving external frame protective skirting board according to claim 1 is characterized in that: The skirting board (1) is provided with four grooves (2), and the grooves (2) on both sides are symmetrically arranged.
4. The revolving external frame protective skirting board according to claim 1 is characterized in that: The skirting board (1) is arranged transversely, and trapezoidal grooves are arranged at intervals on the transversely arranged skirting board (1).
5. The revolving external frame protective skirting board according to claim 4 is characterized in that: The lower ends of the skirting boards (1) are arranged on the upper ends of the transversely arranged external frame protection rods.