Building facade construction protection and construction waste collection hanging basket equipment capable of eliminating potential safety hazards

By optimizing hanging basket fence equipment, including bearing plates, fixing rings, baffles, rubber pads and limit poles, safety hazards and garbage collection problems in the construction of high-rise residential facades are solved, and the safety and flexibility of construction are improved.

CN223256532UActive Publication Date: 2025-08-22SHANGHAI YAXIN BUILDING ENG MAIN CONTRACTING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422618299.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2025-08-22
Estimated Expiration
2034-10-29

AI Technical Summary

Technical Problem

During the renovation of the facade of high-rise residential buildings, effective construction waste collection measures and safety protection are lacking, which poses safety hazards, such as damage to repaired parts by tool drops and hanging baskets.

Method used

A hanging basket fence equipment is designed, including a bearing plate, fixing ring, baffle, rubber pad and limiting rod. It is closely connected to the building exterior wall, adds buffer material, and provides construction waste collection devices to reduce safety hazards and shaking damage.

Benefits of technology

It improves the safety and flexibility of hanging basket equipment in the facade of high-rise residential buildings, reduces safety hazards and construction waste collection problems, and enhances the practicality of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223256532U_ABST
    Figure CN223256532U_ABST
Patent Text Reader

Abstract

The utility model discloses building facade construction protection and building waste collection hanging basket equipment capable of eliminating potential safety hazards, and belongs to the technical field of hanging basket equipment.The hanging basket equipment comprises a hanging basket fence, a bearing plate, a fixing ring and a building waste recycling bag fixing buckle, and the hanging basket fence is composed of a first side frame, a second side frame, a front frame body, a rear frame body and a bottom plate; the hanging basket fence is novel in design and ingenious in device, operators can conveniently cope with different use scenes in the application process, the hanging basket fence can be flexibly adjusted and used during aerial operation, due to the fact that optimization aims at the hanging basket fence, connection between the bearing plate and the hanging basket fence and connection between the bearing plate and a building outer wall are tight, potential safety hazards existing in the outer facade construction process are reduced, and the construction efficiency is improved. And meanwhile, the hanging basket fence keeps the bearing plate fixed through the limiting rods, a certain horizontal distance is kept between the hanging basket fence and the wall body, a rubber pad at the top of the bearing plate can play a buffering role, damage to a repaired part caused by shaking of the hanging basket fence is reduced, and the practicability of the device is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of hanging basket equipment, and in particular to a hanging basket equipment for eliminating potential safety hazards, protecting building facades during construction, and collecting construction waste. Background Art

[0002] Most of the renovation projects are in residential areas with many people walking around and people gathering together. The current renovation of the facades of high-rise residential buildings involves the removal of hollows and painting on the facades, which require the use of hanging baskets.

[0003] There is usually a lack of construction waste collection measures during facade repairs. At the same time, there are safety hazards such as tools falling through gaps when applying putty and paint during facade construction.

[0004] A large amount of construction waste will be generated during the facade repair process. The existing construction process lacks corresponding protective measures. In some projects, workers temporarily overlap wooden boards between the wall and the hanging basket, or install construction waste collection devices on the hanging basket. There are overlap gaps between the wooden boards, which easily creates the risk of falling from a height. The external connection device of the hanging basket has poor operating flexibility and is not suitable for adjustment in the air. At the same time, the shaking generated during the operation of the hanging basket may cause damage to the repaired parts.

[0005] To this end, the present application proposes a hanging basket device for protecting building facade construction and collecting construction waste that eliminates potential safety hazards. Utility Model Content

[0006] The present application proposes a hanging basket device for eliminating safety hazards in building facade construction protection and construction waste collection to solve the problems raised in the above-mentioned background technology; during the application process, it is convenient for operators to cope with different usage scenarios and can be flexibly adjusted for use during aerial operations. Secondly, since the optimization is for the hanging basket fence itself, the connection between the receiving plate and the hanging basket fence and the building exterior wall is relatively tight, reducing the safety hazards in the facade construction process. At the same time, the hanging basket fence keeps the receiving plate fixed through the limiting rod, and maintains a certain horizontal distance between the hanging basket fence and the wall. The rubber pad on the top of the receiving plate can play a buffering role, reducing the damage to the repaired part due to shaking of the hanging basket fence, thereby greatly improving the practicality of the device.

[0007] In order to achieve the above objectives, this application adopts the following technical solutions:

[0008] A hanging basket device for eliminating safety hazards during building facade construction protection and collecting construction waste, including a hanging basket fence, a receiving plate, a fixing ring and a fixing buckle for construction waste recycling bags. The hanging basket fence is composed of a first side frame, a second side frame, a front frame, a rear frame and a bottom plate. The first side frame and the second side frame are arranged on both sides of the hanging basket fence, the front frame and the rear frame are respectively arranged at the front and rear sides of the hanging basket fence, and a bottom plate is provided at the bottom of the hanging basket fence.

[0009] As a preferred embodiment, two fixing rings are fixedly connected to the front frame of the hanging basket fence, and the two fixing rings are respectively fixedly connected to one side close to the first side frame and the second side frame;

[0010] By arranging a fixing ring on the front frame, the fixing ring is used to fix the receiving plate, so that the receiving plate is installed on the front frame of the hanging basket fence, thereby improving the practicality of the device.

[0011] As a preferred embodiment, a receiving plate is fixedly connected to the outside of the two fixing rings on the front frame, and the receiving plate is located between the first side frame and the second side frame;

[0012] By setting a receiving plate on the top of the hanging basket fence, the connection between the receiving plate, the hanging basket fence and the exterior wall of the building is tighter, reducing the safety hazards in the facade construction process, thereby improving the practicality of the device.

[0013] As a preferred embodiment, baffles are fixedly connected to both sides of the receiving plate, and the two baffles are connected to the receiving plate by welding;

[0014] By setting baffles on both sides of the receiving plate, the use of the hanging basket fence in the process of high-rise residential facade renovation is more flexible. The workers can adjust according to the actual situation when working in the air. At the same time, corresponding solutions are made for common safety hazards in the facade construction process, thereby improving the practicality of the device.

[0015] As a preferred embodiment, a rubber pad is fixedly connected to the top of the receiving plate, and the rubber pad is connected to the receiving plate using ABS glue;

[0016] By arranging a rubber pad on the receiving plate, the rubber pad on the top of the receiving plate can play a buffering role, reducing the damage to the repaired part due to shaking of the hanging basket fence, thereby improving the practicality of the device.

[0017] As a preferred embodiment, two limiting rods are fixedly connected to the bottom of the receiving plate, and the bottom ends of the two limiting rods are fixedly connected to the front frame;

[0018] By arranging a limiting rod at the bottom of the receiving plate, the hanging basket fence keeps the receiving plate fixed through the limiting rod, and a certain horizontal distance is maintained between the hanging basket fence and the wall, thereby improving the practicality of the device.

[0019] As a preferred embodiment, two construction waste recycling bag fixing buckles are fixedly connected to the bottom of the receiving plate, and the two construction waste recycling bag fixing buckles are located on one side of the front frame close to the rear frame;

[0020] By providing fixing buckles for construction waste recycling bags on the receiving plate, the safety hazard problem and the problem of collecting construction waste generated by facade construction during the renovation of high-rise residential buildings are eliminated, thereby improving the practicality of the device.

[0021] Beneficial effects of this application:

[0022] 1. This hanging basket device for protecting building facade construction and collecting construction waste eliminates safety hazards. During application, it is convenient for operators to cope with different usage scenarios and can be flexibly adjusted for use during aerial operations. Secondly, because the optimization is for the hanging basket fence itself, the connection between the receiving plate, the hanging basket fence and the building exterior wall is relatively tight, reducing safety hazards during facade construction. At the same time, the hanging basket fence uses a limit rod to keep the receiving plate fixed, and a certain horizontal distance is maintained between the hanging basket fence and the wall. The rubber pad on the top of the receiving plate can act as a buffer, reducing damage to the repaired part due to shaking of the hanging basket fence, greatly improving the practicality of the device.

[0023] 2. This kind of hanging basket equipment for eliminating safety hazards in building facade construction protection and collecting construction waste, through the optimization of the hanging basket fence itself, first eliminates the safety hazard problem and the problem of collecting construction waste generated by the facade construction during the renovation of high-rise residential buildings. Secondly, it adds a buffer material between the hanging basket fence and the wall to solve the damage to the repaired parts caused by the shaking of the hanging basket. The key point lies in the optimization of the hanging basket fence, which makes the hanging basket fence more flexible in the use of scenarios during the renovation of the facade of high-rise residential buildings. The operators can adjust according to the actual situation when working in the air, and at the same time make corresponding solutions to the common safety hazards in the facade construction process, which greatly improves the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the main body of the device of this application;

[0025] Figure 2 This is a schematic diagram of the hanging basket fence of the device of this application;

[0026] Figure 3 For this application Figure 1 Enlarged view of point A in the middle.

[0027] Numbers in the figure: 1. Hanging basket fence; 11. First side frame; 12. Second side frame; 13. Front frame; 14. Rear frame; 15. Bottom plate; 2. Attachment plate; 21. Baffle; 22. Rubber pad; 23. Limit rod; 3. Fixing ring; 4. Construction waste recycling bag fixing buckle. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments.

[0029] Reference Figure 1-3 A hanging basket device for eliminating potential safety hazards, protecting building facades during construction, and collecting construction waste, comprises a hanging basket fence 1, a receiving plate 2, a fixing ring 3, and a fixing buckle 4 for a construction waste recycling bag.

[0030] The hanging basket fence 1 is composed of a first side frame 11, a second side frame 12, a front frame 13, a rear frame 14 and a bottom plate 15. The first side frame 11 and the second side frame 12 are arranged on both sides of the hanging basket fence 1, the front frame 13 and the rear frame 14 are respectively arranged at the front and back of the hanging basket fence 1, and a bottom plate 15 is provided at the bottom of the hanging basket fence 1; through the optimization of the hanging basket fence 1 itself, firstly, the safety hazard problem and the problem of collecting construction waste generated by the facade construction during the renovation of high-rise residential buildings are eliminated; secondly, a buffer material is added between the hanging basket fence 1 and the wall to solve the damage to the repaired parts caused by the shaking of the hanging basket.

[0031] Two fixing rings 3 are fixedly connected to the front frame 13 of the hanging basket fence 1, and the two fixing rings 3 are respectively fixedly connected to one side close to the first side frame 11 and the second side frame 12; by arranging the fixing ring 3 on the front frame 13, the fixing ring 3 is used to fix the receiving plate 2, so that the receiving plate 2 is installed on the front frame 13 of the hanging basket fence 1, thereby improving the practicality of the device.

[0032] The two fixing rings 3 on the front frame 13 are fixedly connected to the outside with a receiving plate 2, and the receiving plate 2 is located between the first side frame 11 and the second side frame 12; by arranging the receiving plate 2 on the top of the hanging basket fence 1, the connection between the receiving plate 2 and the hanging basket fence 1 and the outer wall of the building is relatively tight, reducing the safety hazards in the facade construction process, thereby improving the practicality of the device.

[0033] Baffles 21 are fixedly connected to both sides of the receiving plate 2, and the two baffles 21 are connected to the receiving plate 2 by welding; by arranging baffles 21 on both sides of the receiving plate 2, the use scenario of the hanging basket fence 1 in the process of repairing the facade of a high-rise residential building is more flexible, and the operators can adjust according to the actual situation when working in the air, and at the same time make corresponding solutions to the common safety hazards in the facade construction process, thereby improving the practicality of the device.

[0034] A rubber pad 22 is fixedly connected to the top of the receiving plate 2, and the rubber pad 22 is connected to the receiving plate 2 using ABS glue; by arranging the rubber pad 22 on the receiving plate 2, the rubber pad 22 on the top of the receiving plate 2 can play a buffering role, reducing the damage to the repaired part of the hanging basket fence 1 due to shaking, thereby improving the practicality of the device.

[0035] Two limit rods 23 are fixedly connected to the bottom of the receiving plate 2, and the bottom ends of the two limit rods 23 are fixedly connected to the front frame 13; by setting the limit rods 23 at the bottom of the receiving plate 2, the hanging basket fence 1 keeps the receiving plate 2 fixed through the limit rods 23, and maintains a certain horizontal distance between the hanging basket fence 1 and the wall, thereby improving the practicality of the device.

[0036] Two construction waste recycling bag fixing buckles 4 are fixedly connected to the bottom of the receiving plate 2, and the two construction waste recycling bag fixing buckles 4 are located on the side of the front frame 13 close to the rear frame 14; by arranging the construction waste recycling bag fixing buckles 4 on the receiving plate 2, the safety hazard problem and the problem of collecting construction waste generated by the facade construction during the renovation of high-rise residential buildings are eliminated, thereby improving the practicality of the device.

[0037] Working principle: A receiving plate 2 is set at the top of the hanging basket fence 1, and the connection between the receiving plate 2 and the hanging basket fence 1 and the exterior wall of the building is relatively tight, which reduces the safety hazards in the process of facade construction. By setting baffles 21 on both sides of the receiving plate 2, the hanging basket fence 1 is more flexible in the use scenario during the facade repair of high-rise residential buildings. The workers can adjust according to the actual situation when working in the air, and at the same time make corresponding solutions to the common safety hazards in the facade construction process. By setting a rubber pad 22 on the receiving plate 2, the rubber pad 22 on the top of the receiving plate 2 can play a buffering role, reducing the damage of the hanging basket fence 1 to the repaired part due to shaking. By setting a limit rod 23 at the bottom of the receiving plate 2, the hanging basket fence 1 keeps the receiving plate 2 fixed through the limit rod 23, and maintains a certain horizontal distance between the hanging basket fence 1 and the wall. By setting a construction waste recycling bag fixing buckle 4 on the receiving plate 2, the safety hazard problem and the problem of collection of construction waste generated by the facade construction during the renovation of high-rise residential buildings are eliminated.

[0038] This new utility patent optimizes the hanging basket fence 1 itself, firstly eliminating the potential safety hazard and the problem of collecting construction waste generated by facade construction during the renovation of high-rise residential buildings. Secondly, it adds a buffer material between the hanging basket fence 1 and the wall to solve the damage to the repaired parts caused by the shaking of the hanging basket.

[0039] During the application process, this new utility patent makes it easy for operators to cope with different usage scenarios and can be flexibly adjusted for use during aerial operations. Secondly, since the optimization is for the hanging basket fence 1 itself, the connection between the receiving plate 2 and the hanging basket fence 1 and the exterior wall of the building is relatively tight, reducing the safety hazards in the facade construction process. At the same time, the hanging basket fence 1 keeps the receiving plate 2 fixed through the limiting rod 23, and maintains a certain horizontal distance between the hanging basket fence 1 and the wall. The rubber pad 22 on the top of the receiving plate 2 can play a buffering role, reducing the damage to the repaired part of the hanging basket fence 1 due to shaking.

[0040] The key point of this patent is the optimization of the hanging basket fence 1, which makes the use of the hanging basket fence 1 more flexible during the renovation of the facade of a high-rise residential building. The workers can adjust according to the actual situation when working in the air, and at the same time make corresponding solutions to the common safety hazards in the facade construction process.

[0041] The above is only a preferred specific implementation method of the present application, but the scope of protection of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes based on the technical solution and utility model concept of the present application within the technical scope disclosed in the present application, and they should be covered by the scope of protection of the present application.

Claims

1. A hanging basket device for eliminating potential safety hazards, protecting building facades during construction, and collecting construction waste, comprising a hanging basket fence (1), a receiving plate (2), a fixing ring (3), and a fixing buckle (4) for a construction waste recycling bag, characterized in that: The hanging basket fence (1) is composed of a first side frame (11), a second side frame (12), a front frame body (13), a rear frame body (14) and a bottom plate (15), wherein the first side frame (11) and the second side frame (12) are arranged on both sides of the hanging basket fence (1), the front frame body (13) and the rear frame body (14) are respectively arranged at the front and rear sides of the hanging basket fence (1), and the bottom plate (15) is provided at the bottom of the hanging basket fence (1).

2. The hanging basket device for protecting building facades and collecting construction waste for eliminating potential safety hazards according to claim 1 is characterized in that: Two fixing rings (3) are fixedly connected to the front frame (13) of the hanging basket fence (1), and the two fixing rings (3) are respectively fixedly connected to one side close to the first side frame (11) and the second side frame (12).

3. The hanging basket device for protecting building facades and collecting construction waste for eliminating potential safety hazards according to claim 1 is characterized in that: The two fixing rings (3) on the front frame (13) are externally fixedly connected to a receiving plate (2), and the receiving plate (2) is located between the first side frame (11) and the second side frame (12).

4. The hanging basket device for protecting building facades and collecting construction waste for eliminating potential safety hazards according to claim 1 is characterized in that: Baffles (21) are fixedly connected to both sides of the receiving plate (2), and the two baffles (21) are connected to the receiving plate (2) by welding.

5. The hanging basket device for protecting building facades and collecting construction waste for eliminating potential safety hazards according to claim 1 is characterized in that: A rubber pad (22) is fixedly connected to the top of the receiving plate (2), and the rubber pad (22) is connected to the receiving plate (2) using ABS glue.

6. The hanging basket device for protecting building facades and collecting construction waste for eliminating potential safety hazards according to claim 1 is characterized in that: The bottom of the receiving plate (2) is fixedly connected to two limiting rods (23), and the bottom ends of the two limiting rods (23) are fixedly connected to the front frame (13).

7. The hanging basket device for protecting building facades and collecting construction waste for eliminating potential safety hazards according to claim 1 is characterized in that: Two construction waste recycling bag fixing buckles (4) are fixedly connected to the bottom of the receiving plate (2), and the two construction waste recycling bag fixing buckles (4) are located on one side of the front frame (13) close to the rear frame (14).