Rain-resistant and wind-resistant testing equipment for outdoor tent
By introducing positioning installation mechanism and air treatment mechanism into outdoor tent testing equipment, the problems of tent positioning and dust filtration are solved, and the installation effect and equipment practicality of the test equipment are improved.
Patent Information
- Application Number
- CN202422609711.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-28
- Publication Date
- 2025-08-22
- Estimated Expiration
- 2034-10-28
AI Technical Summary
The existing outdoor tent testing equipment lacks the tent positioning and installation function and cannot effectively filter dust and impurities in the air, resulting in poor testing results and reduced equipment practicality.
An outdoor tent rain-resistant wind testing equipment is designed, including a positioning installation mechanism and an air treatment mechanism. The positioning and installation mechanism uses electric push rods and L-shaped positioning frames to fix the tent, and the air treatment mechanism filters dust and impurities in the air through screens and filters.
It realizes stable installation of the tent and effective air filtration, improves the practicality and testing effect of the test equipment, and ensures that the dust and impurities in the air do not enter the equipment.
Smart Images

Figure CN223259142U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of outdoor tents, in particular to rain and wind resistance testing equipment for outdoor tents. Background Art
[0002] An outdoor tent is a shed propped up on the ground to provide shelter from wind, rain, and sunlight and for temporary living. It is mostly made of canvas and, together with the supporting materials, can be disassembled and moved at any time. The tent is carried in parts and assembled after arriving at the site. Outdoor tents need to be tested for wind and rain resistance before leaving the factory. Now, a rain and wind resistance test equipment for outdoor tents is needed.
[0003] The existing test equipment has insufficient testing effect on outdoor tents and is not convenient enough for testing. In addition, the existing test equipment has some shortcomings to a certain extent. The test equipment needs to locate and install the outdoor tent when in use. The existing test equipment usually does not have the function of locating and installing the tent when in use, which makes it impossible to locate and install the tent to be tested on the surface of the rotating disk when the test equipment is in use, thereby reducing the installation effect of the test equipment on the tent; the air contains some dust and impurities, which are easy to adhere to the surface of the outdoor tent. The existing test equipment cannot filter the dust and impurities in the air when in use, which makes it impossible to filter out the dust and impurities in the air when the test equipment is in use, making it easy for the dust and impurities in the air to enter the fan room and the interior of the equipment box, making the test equipment not practical enough. Utility Model Content
[0004] The purpose of the present utility model is to provide an outdoor tent rain and wind resistance test device to solve the problems in the above background technology that the test device usually does not have the function of positioning and installing the tent when used, and cannot filter dust and impurities in the air.
[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: outdoor tent rain and wind resistance test equipment, including an equipment box, the surface of the equipment box is provided with a door body, and the door body and the surface of the equipment box are rotated and matched with each other, and a control button is installed on the surface of the door body, a fan room is installed on the surface of the equipment box, a door body is provided on the surface of the fan room, a viewing passage is installed on the surface of the equipment box, a water pump room is installed on the surface of the equipment box, a water tank is installed inside the equipment box, a fixed platform is installed inside the equipment box, a rotating disk is provided on the surface of the fixed platform, the diameter of the rotating disk is 9 meters, and the interior of the water pump room is installed. A third water pump is installed, and the input end of the third water pump is electrically connected to the output end of the control button. The input end of the third water pump passes through the water pump room and extends to the outside of the water pump room. The output end of the third water pump passes through the water pump room, the equipment box and the water tank and extends to the inside of the water tank. A baffle is provided on the surface of the equipment box, and the baffle and the surface of the equipment box rotate with each other. A positioning installation mechanism is provided on the surface of the fixed platform, and the interior of the positioning installation mechanism includes an electric push rod, a fixing groove and a positioning installation group. The inner wall of the fan room is provided with an air treatment mechanism, and the interior of the air treatment mechanism includes mounting screws, a treatment box and an air treatment component.
[0006] Preferably, a water tank is provided inside the equipment box, a purification net for filtering water is installed inside the water tank, a second water pump is installed inside the equipment box, the input end of the second water pump is electrically connected to the output end of the control button, the input end of the second water pump extends to the inside of the water tank, a return pipe is installed at the output end of the second water pump, one end of the return pipe passes through the water tank and extends to the inside of the water tank, a first water pump is installed on the surface of the water tank, the input end of the first water pump is electrically connected to the output end of the control button, the rotating disk and the surface of the fixed platform rotate with each other, a water pipe is installed at the output end of the first water pump, one end of the water pipe passes through the equipment box and extends to the top of the rotating disk, an electric nozzle is installed on the surface of the water pipe, the electric nozzle is connected to the inside of the water pipe, the input end of the first water pump passes through the water tank and extends to the inside of the water tank, the inner wall of the equipment box is provided with a through hole, The through holes are respectively connected to the interior of the water tank and the water storage tank; a driving motor is installed inside the fixed platform, and the input end of the driving motor is electrically connected to the output end of the control button; the output end of the driving motor is installed with a rotating shaft through a coupling; a driving gear disc is provided inside the fixed platform, and the driving gear disc and the inner wall of the fixed platform are rotatably matched with each other, and the surface at the center position of the driving gear disc is fixed to the surface of the rotating shaft; a driven gear disc is provided inside the fixed platform, and the driven gear disc and the inner wall of the fixed platform are rotatably matched with each other, and the surface at the center position of the driven gear disc is fixed to the surface of the rotating disc; the inner wall of the fan room is installed with a hole box, and a fan body is installed inside the hole box, and the input end of the fan body is electrically connected to the output end of the control button; a blower is installed inside the fan room, and the input end of the blower is electrically connected to the output end of the control button, and the output end of the blower passes through the fan room and the equipment box and extends to the interior of the equipment box.
[0007] Preferably, the positioning installation group is arranged on the surface of the fixed platform, and the positioning installation group is composed of a positioning plate, an extension spring, a fixed frame and an L-shaped positioning frame. The surface of the fixed platform is provided with a fixing groove, and an electric push rod is installed inside the fixing groove. The input end of the electric push rod is electrically connected to the output end of the control button. The surface of the fixed platform is provided with an L-shaped positioning frame, and the L-shaped positioning frame and the inner wall of the fixing groove are slidably matched with each other, and the output end of the electric push rod is fixed to the surface of the L-shaped positioning frame.
[0008] Preferably, a fixing frame is installed on the inner wall of the L-shaped positioning frame, a positioning plate is provided inside the fixing frame, the positioning plate and the inner wall of the fixing frame slide with each other, and an extension spring is installed inside the fixing frame, one end of the extension spring is fixed to the surface of the positioning plate.
[0009] Preferably, the air treatment component is arranged on the inner wall of the fan room, and the air treatment component is composed of a screen, a first filter and a second filter. A treatment box is provided inside the fan room, and the surface of the treatment box is threadedly connected with mounting screws, and one end of the mounting screw passes through the treatment box and is threadedly fastened to the inner wall of the fan room.
[0010] Preferably, a screen is installed inside the processing box, a first filter is installed inside the processing box, and a second filter for blocking dust is installed on the inner wall of the processing box.
[0011] Compared with the prior art, the beneficial effects of the present invention are as follows: the outdoor tent rain and wind resistance test equipment not only enables the tent to be tested to be positioned and installed on the surface of the rotating disk when the test equipment is used, so that the test equipment has a better installation effect on the tent, but also enables the test equipment to filter out dust and impurities in the air when it is used, so that dust and impurities in the air will not enter the fan room and the interior of the equipment box, making the test equipment more practical;
[0012] 1. A positioning and installation mechanism is provided to control the operation of the electric push rod inside the fixed slot. Under the action of the electric push rod, the L-shaped positioning frame is driven to move on the surface of the fixed platform. At this time, the extension spring drives the positioning plate to slide inside the fixed frame, so that the L-shaped positioning frame moves to the specified position on the surface of the fixed platform. Under the elastic force of the extension spring inside the fixed frame, the positioning plate is driven to move, so that the positioning plate moves downward to the specified position, thereby positioning the installation position of the tent, realizing the function of positioning and installing the tent by the test equipment, so that the tent to be tested can be positioned and installed on the surface of the rotating disk when the test equipment is used, so that the installation effect of the tent by the test equipment is better;
[0013] 2. By setting up an air treatment mechanism, the operation of the fan body inside the hole box is controlled, and the air is sucked into the interior of the fan room under the action of the fan body. The user installs the treatment box on the inner wall of the fan room by installing screws, and the impurities in the air are filtered under the action of the screen. The dust in the air is filtered under the action of the first filter, and then the dust and other impurities in the air are filtered again under the action of the second filter, making the air purer, realizing the function of filtering the dust and impurities in the air of the test equipment, so that the dust and impurities in the air can be filtered out when the test equipment is used, so that the dust and impurities in the air will not enter the interior of the fan room and the equipment box, making the test equipment more practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the three-dimensional structure of the utility model;
[0015] Figure 2This is a schematic diagram of the main cross-sectional structure of the utility model;
[0016] Figure 3 This is a schematic diagram of a top-view cross-sectional structure of the utility model;
[0017] Figure 4 For the utility model Figure 2 An enlarged structural diagram of the positioning installation mechanism;
[0018] Figure 5 For the utility model Figure 3 Schematic diagram of the enlarged structure of the air handling mechanism.
[0019] In the figure: 1. Equipment box; 101. Control button; 102. Fan room; 103. Door; 104. Visitor passage; 105. Pump room; 106. Water pipe; 107. Electric sprinkler; 108. Rotating disk; 109. Driving motor; 110. Fixing table; 111. Driving gear plate; 112. Driven gear plate; 113. Door; 114. Through hole; 115. Water tank; 116. First water pump; 117. Water tank; 118. Return pipe; 119. Purification net; 12 0. Second water pump; 121. Orifice box; 122. Fan body; 123. Third water pump; 124. Blower; 2. Positioning and mounting mechanism; 21. Electric push rod; 22. Fixing slot; 23. Positioning and mounting group; 231. Positioning plate; 232. Extension spring; 233. Fixing frame; 234. L-shaped positioning frame; 3. Air handling mechanism; 31. Mounting screws; 32. Handling box; 33. Air handling assembly; 331. Screen; 332. First filter; 333. Second filter. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0021] The structure of the outdoor tent rain and wind resistance testing equipment provided by the utility model is as follows Figure 1 and Figure 2As shown, it includes an equipment box 1, a door body is provided on the surface of the equipment box 1, and the door body and the surface of the equipment box 1 rotate with each other, and a control button 101 is installed on the surface of the door body, and the model of the control button 101 can be selected from the LA series, a fan room 102 is installed on the surface of the equipment box 1, a door body 103 is provided on the surface of the fan room 102, a viewing passage 104 is installed on the surface of the equipment box 1, a water pump room 105 is installed on the surface of the equipment box 1, a water tank 117 is provided inside the equipment box 1, a purification net 119 for filtering water is installed inside the water tank 117, a second water pump 120 is installed inside the equipment box 1, and the model of the second water pump 120 can be selected from the SLG series. 0 is electrically connected to the output end of the control button 101, a water tank 115 is installed inside the equipment box 1, the input end of the second water pump 120 extends to the inside of the water tank 117, and a return pipe 118 is installed at the output end of the second water pump 120. One end of the return pipe 118 passes through the water tank 115 and extends to the inside of the water tank 115. A first water pump 116 is installed on the surface of the water tank 115. The model of the first water pump 116 can be selected from the SLG series. The input end of the first water pump 116 is electrically connected to the output end of the control button 101, and a fixed platform 110 is installed inside the equipment box 1. A rotating disk 108 is provided on the surface of the fixed platform 110. The diameter of the rotating disk 108 is nine meters. The rotating disk 108 is connected to the fixed platform 1 10 surfaces rotate with each other, the output end of the first water pump 116 is installed with a water pipe 106, one end of the water pipe 106 passes through the equipment box 1 and extends to the top of the rotating disk 108, the surface of the water pipe 106 is installed with an electric nozzle 107, the model of the electric nozzle 107 can be selected from the SK series, the electric nozzle 107 is connected to the inside of the water pipe 106, the input end of the first water pump 116 passes through the water tank 115 and extends to the inside of the water tank 115, the inner wall of the equipment box 1 is provided with a through hole 114, the through hole 114 is respectively connected to the inside of the water tank 117 and the water tank 115, the interior of the fixed platform 110 is installed with a drive motor 109, the model of the drive motor 109 can be selected from the JO series, the drive motor The input end of the machine 109 is electrically connected to the output end of the control button 101, and the output end of the drive motor 109 is installed with a rotating shaft through a coupling. A driving gear disc 111 is provided inside the fixed platform 110, and the driving gear disc 111 and the inner wall of the fixed platform 110 rotate with each other. The surface at the center position of the driving gear disc 111 is fixed to the surface of the rotating shaft. A driven gear disc 112 is provided inside the fixed platform 110, and the driven gear disc 112 and the inner wall of the fixed platform 110 rotate with each other. The surface at the center position of the driven gear disc 112 is fixed to the surface of the rotating disk 108. The inner wall of the fan room 102 is installed with a hole box 121, and the fan body 122 is installed inside the hole box 121. The model of the fan body 122 can be selected from the Y series.The input end of the fan body 122 is electrically connected to the output end of the control button 101. A blower 124 is installed inside the fan room 102. The model of the blower 124 can be selected from the VFC series. The input end of the blower 124 is electrically connected to the output end of the control button 101. The output end of the blower 124 passes through the fan room 102 and the equipment box 1 and extends to the interior of the equipment box 1. A third water pump 123 is installed inside the water pump room 105. The third water pump 123 The SLG series can be selected for the 23 model. The input end of the third water pump 123 is electrically connected to the output end of the control button 101. The input end of the third water pump 123 passes through the water pump room 105 and extends to the outside of the water pump room 105. The output end of the third water pump 123 passes through the water pump room 105, the equipment box 1 and the water tank 115 and extends to the inside of the water tank 115. The surface of the equipment box 1 is provided with a baffle 113, and the baffle 113 and the surface of the equipment box 1 rotate with each other.
[0022] Furthermore, if Figure 2 and Figure 4 As shown, the surface of the fixed platform 110 is provided with a positioning mounting mechanism 2, the interior of the positioning mounting mechanism 2 includes an electric push rod 21, a fixing groove 22 and a positioning mounting group 23, the positioning mounting group 23 is provided on the surface of the fixed platform 110, and the positioning mounting group 23 is composed of a positioning plate 231, an extension spring 232, a fixing frame 233 and an L-shaped positioning frame 234. The surface of the fixed platform 110 is provided with a fixing groove 22, and the interior of the fixing groove 22 is provided with an electric push rod 21. The model of the electric push rod 21 can be selected from the DG series. The input end of the electric push rod 21 and the control button 1 01's output end is electrically connected, and the surface of the fixed platform 110 is provided with an L-shaped positioning frame 234, and the L-shaped positioning frame 234 and the inner wall of the fixed groove 22 slide with each other. The output end of the electric push rod 21 is fixed to the surface of the L-shaped positioning frame 234, and the inner wall of the L-shaped positioning frame 234 is installed with a fixing frame 233, and a positioning plate 231 is provided inside the fixing frame 233, and the positioning plate 231 and the inner wall of the fixing frame 233 slide with each other. The interior of the fixing frame 233 is provided with an extension spring 232, and one end of the extension spring 232 is fixed to the surface of the positioning plate 231.
[0023] During implementation, the electric push rod 21 inside the fixed groove 22 is controlled to work, and under the action of the electric push rod 21, the L-shaped positioning frame 234 is driven to move on the surface of the fixed platform 110. At this time, the extension spring 232 drives the positioning plate 231 to slide inside the fixed frame 233, so that the L-shaped positioning frame 234 moves to the specified position on the surface of the fixed platform 110. Under the elastic force of the extension spring 232 inside the fixed frame 233, the positioning plate 231 is driven to move, so that the positioning plate 231 moves downward to the specified position, thereby positioning the installation position of the tent to realize the function of the test equipment to position and install the tent.
[0024] Furthermore, if Figure 3 and Figure 5 As shown, an air treatment mechanism 3 is provided on the inner wall of the fan room 102. The interior of the air treatment mechanism 3 includes mounting screws 31, a treatment box 32 and an air treatment component 33. The air treatment component 33 is provided on the inner wall of the fan room 102. The air treatment component 33 is composed of a screen 331, a first filter 332 and a second filter 333. A treatment box 32 is provided inside the fan room 102. The surface of the treatment box 32 is threadedly connected with the mounting screws 31. One end of the mounting screw 31 passes through the treatment box 32 and is threadedly fastened to the inner wall of the fan room 102. A screen 331 is installed inside the treatment box 32. A first filter 332 is installed inside the treatment box 32. The inner wall of the treatment box 32 is installed with a second filter 333 for blocking dust.
[0025] During implementation, the fan body 122 inside the control hole box 121 works, and the air is sucked into the inside of the fan room 102 under the action of the fan body 122. The user installs the processing box 32 on the inner wall of the fan room 102 by installing the screws 31. The impurities in the air are filtered under the action of the screen 331, and the dust in the air is filtered under the action of the first filter 332. Then, the dust and other impurities in the air are filtered again under the action of the second filter 333, making the air purer, so as to realize the function of filtering the dust and impurities in the air of the test equipment.
[0026] Working principle: When in use, first place the equipment box 1 at the designated position. The equipment box 1 is designed in three layers. The main shaft is a 60mm steel shaft. The fixed seat is welded with 250*250 square tubes and T12mm steel plates. The bearing seat is made of all stainless steel. The first layer is a regular dodecagon. The middle layer is designed with a well-shaped skeleton reinforcement structure. All frames are welded with 120*60 flat square tubes. All metal components are primed and painted with corrosion-resistant waterproof asphalt paint twice. The second layer is a square structure. The main beam is welded with 120*60 flat square tubes. It is supported by an adjustable fixed foot and fixed with chemical bolts. All metal components are primed and painted with corrosion-resistant waterproof asphalt paint twice. The third layer is a well-shaped skeleton reinforcement structure. All frames are welded with 160*80 flat square tubes. All metal components are primed and painted with corrosion-resistant waterproof asphalt paint twice. A P=1.5KW gear reduction motor is used to drive the drive wheel through a coupling. The drive wheel is a high-load-bearing iron core rubber-coated heavy-duty PU wheel. The drive wheel is fixed with a double bearing seat, and the bearing seat is made of all stainless steel. The load-bearing wheels are high-load-bearing iron core rubber-coated heavy-duty PU wheels with a 40mm axis and an adjustable fixing plate. The surface is galvanized and treated with waterproof asphalt paint. Then, the user operates the control button 101, so that the control button 101 controls the third water pump 123 inside the water pump room 105 to work. Under the action of the third water pump 123, external water is introduced into the water tank 115. Then, the user operates the control button 101, so that the control button 101 controls the first water pump 116 to work. Under the action of the first water pump 116, the water in the water tank 115 is sucked into the inside of the water pipe 106, and then the water is sprayed through the electric nozzle 107 to test the rain performance of the tent. The tested water enters the inside of the water tank 117 through the through hole 114 and is filtered under the action of the purification net 119. Then, the user operates the control again. Button 101, so that the control button 101 controls the second water pump 120 to work, and under the action of the second water pump 120, the water inside the water tank 117 is returned to the inside of the water tank 115 through the return pipe 118. Then, the user operates the control button 101, so that the control button 101 controls the blower 124 to work, and under the action of the blower 124, the wind resistance of the tent is tested. When the tent is tested, the user operates the control button 101 again, so that the control button 101 controls the drive motor 109 inside the fixed platform 110 to work, and under the action of the drive motor 109, the active gear disc 111 is driven to rotate inside the fixed platform 110, and the rotating disk 108 is driven to rotate on the surface of the fixed platform 110 under the meshing action of the active gear disc 111 and the driven gear disc 112, so as to adjust the test angle of the tent.
[0027] Afterwards, the user opens the door and places the tent to be tested on the surface of the rotating disk 108. Then, the user operates the control button 101, so that the control button 101 controls the electric push rod 21 inside the fixing slot 22 to work, and under the action of the electric push rod 21, the L-shaped positioning frame 234 is driven to move on the surface of the fixing platform 110. At this time, the extension spring 232 drives the positioning plate 231 to slide inside the fixing frame 233, so that the L-shaped positioning frame 234 moves to the specified position on the surface of the fixing platform 110. Under the elastic force of the extension spring 232 inside the fixing frame 233, the positioning plate 231 is driven to move, so that the positioning plate 231 moves downward to the specified position, thereby positioning the installation position of the tent to realize the function of positioning and installing the tent by the test equipment, so that the tent to be tested can be positioned and installed on the surface of the rotating disk 108 when the test equipment is used, so that the installation effect of the test equipment on the tent is better.
[0028] Afterwards, the user operates the control button 101 again, so that the control button 101 controls the fan body 122 inside the hole box 121 to work, and under the action of the fan body 122, air is sucked into the interior of the fan room 102, and the user installs the processing box 32 on the inner wall of the fan room 102 by installing the screws 31, and filters the impurities in the air under the action of the screen 331, and filters the dust in the air under the action of the first filter 332. Then, under the action of the second filter 333, the dust and other impurities in the air are filtered again, making the air purer, so as to realize the function of filtering the dust and impurities in the air of the test equipment, so that the dust and impurities in the air can be filtered out when the test equipment is used, so that the dust and impurities in the air will not enter the fan room 102 and the interior of the equipment box 1, making the test equipment more practical, and finally completing the use of the test equipment.
[0029] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention.
Claims
1. Outdoor tent rain and wind resistance test equipment, including an equipment box (1), characterized by: The surface of the equipment box (1) is provided with a door body, and the door body and the surface of the equipment box (1) are rotated and matched with each other, and a control button (101) is installed on the surface of the door body, a fan room (102) is installed on the surface of the equipment box (1), and a door body (103) is provided on the surface of the fan room (102), a viewing passage (104) is installed on the surface of the equipment box (1), a water pump room (105) is installed on the surface of the equipment box (1), a water storage tank (115) is installed inside the equipment box (1), a fixed platform (110) is installed inside the equipment box (1), and a rotating disk (108) is provided on the surface of the fixed platform (110), and the diameter of the rotating disk (108) is 9 meters. A third water pump (123) is installed inside the water pump room (105), and the input end of the third water pump (123) is connected to the control button (101). The output end is electrically connected, the input end of the third water pump (123) passes through the water pump room (105) and extends to the outside of the water pump room (105), the output end of the third water pump (123) passes through the water pump room (105), the equipment box (1) and the water storage tank (115) and extends to the inside of the water storage tank (115), the surface of the equipment box (1) is provided with a baffle (113), the baffle (113) and the surface of the equipment box (1) are mutually rotatably matched, the surface of the fixed platform (110) is provided with a positioning installation mechanism (2), the interior of the positioning installation mechanism (2) includes an electric push rod (21), a fixing groove (22) and a positioning installation group (23), the inner wall of the fan room (102) is provided with an air treatment mechanism (3), the interior of the air treatment mechanism (3) includes mounting screws (31), a treatment box (32) and an air treatment component (33).
2. The outdoor tent rain and wind resistance testing equipment according to claim 1, characterized in that: A water tank (117) is provided inside the equipment housing (1), a purification net (119) for filtering water is installed inside the water tank (117), a second water pump (120) is installed inside the equipment housing (1), an input end of the second water pump (120) is electrically connected to an output end of the control button (101), the input end of the second water pump (120) extends to the inside of the water tank (117), a return pipe (118) is installed at the output end of the second water pump (120), one end of the return pipe (118) passes through the water tank (115) and extends to the inside of the water tank (115), a first water pump (116) is installed on the surface of the water tank (115), and the first The input end of the water pump (116) is electrically connected to the output end of the control button (101), the rotating disk (108) and the surface of the fixed platform (110) rotate with each other, the output end of the first water pump (116) is installed with a water pipe (106), one end of the water pipe (106) passes through the equipment box (1) and extends to the top of the rotating disk (108), the surface of the water pipe (106) is installed with an electric spray head (107), the electric spray head (107) is connected to the inside of the water pipe (106), the input end of the first water pump (116) passes through the water tank (115) and extends to the inside of the water tank (115), the inner wall of the equipment box (1) is provided with a through hole (114), The through hole (114) is respectively connected to the inside of the water tank (117) and the water storage tank (115); a driving motor (109) is installed inside the fixed platform (110); the input end of the driving motor (109) is electrically connected to the output end of the control button (101); the output end of the driving motor (109) is installed with a rotating shaft through a coupling; a driving gear disc (111) is provided inside the fixed platform (110); the driving gear disc (111) and the inner wall of the fixed platform (110) are mutually rotatably matched; the surface of the center position of the driving gear disc (111) is fixed to the surface of the rotating shaft; a driven gear disc (112) is provided inside the fixed platform (110); the driven gear disc (112) The driven gear disc (112) is rotated and matched with the inner wall of the fixed platform (110), and the surface at the center position of the driven gear disc (112) is fixed to the surface of the rotating disc (108). The inner wall of the fan room (102) is installed with a hole box (121), and the inside of the hole box (121) is installed with a fan body (122). The input end of the fan body (122) is electrically connected to the output end of the control button (101). The inside of the fan room (102) is installed with a blower (124), and the input end of the blower (124) is electrically connected to the output end of the control button (101). The output end of the blower (124) passes through the fan room (102) and the equipment box (1) and extends to the inside of the equipment box (1).
3. The outdoor tent rain and wind resistance testing equipment according to claim 1, characterized in that: The positioning installation group (23) is arranged on the surface of the fixed platform (110), and the positioning installation group (23) is composed of a positioning plate (231), an extension spring (232), a fixing frame (233) and an L-shaped positioning frame (234). The surface of the fixed platform (110) is provided with a fixing groove (22), and an electric push rod (21) is installed inside the fixing groove (22). The input end of the electric push rod (21) is electrically connected to the output end of the control button (101). The surface of the fixed platform (110) is provided with an L-shaped positioning frame (234). The L-shaped positioning frame (234) and the inner wall of the fixing groove (22) are slidably matched with each other, and the output end of the electric push rod (21) is fixed to the surface of the L-shaped positioning frame (234).
4. The outdoor tent rain and wind resistance testing equipment according to claim 3, characterized in that: A fixing frame (233) is installed on the inner wall of the L-shaped positioning frame (234), a positioning plate (231) is provided inside the fixing frame (233), the positioning plate (231) and the inner wall of the fixing frame (233) are slidably matched with each other, and an extension spring (232) is installed inside the fixing frame (233), one end of the extension spring (232) is fixed to the surface of the positioning plate (231).
5. The outdoor tent rain and wind resistance testing equipment according to claim 1, characterized in that: The air treatment component (33) is arranged on the inner wall of the fan room (102), and the air treatment component (33) is composed of a screen (331), a first filter (332) and a second filter (333). A treatment box (32) is arranged inside the fan room (102), and the surface of the treatment box (32) is threadedly connected with a mounting screw (31), and one end of the mounting screw (31) passes through the treatment box (32) and is threadedly fastened to the inner wall of the fan room (102).
6. The outdoor tent rain and wind resistance testing equipment according to claim 5, characterized in that: A screen (331) is installed inside the processing box (32), a first filter (332) is installed inside the processing box (32), and a second filter (333) for blocking dust is installed on the inner wall of the processing box (32).