Simple tool for repairing outer wall after outer frame is dismantled
By designing a simple tool consisting of steel pipes, fasteners and steel fences, the problem of repeated scaffolding erection during exterior wall repair after the traditional external frame is removed is solved, achieving efficient and safe repair effects and reducing construction costs and delay risks.
Patent Information
- Application Number
- CN202422583419.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2025-09-05
- Estimated Expiration
- 2034-10-24
AI Technical Summary
During the exterior wall repair process after the traditional external frame is removed, scaffolding needs to be frequently set up and dismantled, resulting in large consumption of manpower and material resources, construction delays and increased costs, affecting construction progress and economic benefits.
A simple tool consisting of steel pipes, fasteners and steel fences was designed, including an operating area and a fixing area. It can be directly hoisted to the exterior wall for repair, avoiding the need for repeated scaffolding, utilizing existing materials and ensuring a stable connection.
It reduces the consumption of manpower and material resources, improves construction efficiency, reduces costs, and ensures construction safety and progress.
Smart Images

Figure CN223305378U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of exterior wall repair tools, in particular to a simple tool used for repairing exterior walls after exterior frames are dismantled. Background Art
[0002] During building construction, after the exterior scaffolding is removed, localized damage or areas requiring repair may appear on the exterior wall surface. To ensure smooth repair work and construction safety, workers will erect a stable temporary scaffolding around the exterior wall to serve as a platform and support structure for repair operations. Traditional scaffolding is dismantled after use and re-erected when needed. This not only significantly wastes human resources, increases workers' labor intensity and working time, but also leads to the consumption of a large amount of material resources, including the frequent procurement and replacement of building materials such as steel, wood, and fasteners. All of this directly increases the cost burden of the project. Furthermore, the cumbersome and time-consuming erection process often causes significant delays in on-site construction, affecting the overall project progress. This can trigger a chain reaction, such as postponement of subsequent construction links, delays in project delivery, and potential liquidated damages, adversely affecting both the economic and social benefits of the project.
[0003] Based on this, a simple tool for repairing the exterior wall after the exterior frame is removed is now provided, which can eliminate the disadvantages of the existing device. Utility Model Content
[0004] The purpose of the utility model is to provide a simple tool for repairing an exterior wall after the exterior frame is removed, so as to solve the problems in the background technology.
[0005] To achieve the above objectives, the present invention provides the following technical solutions:
[0006] A simple tool for repairing an exterior wall after the exterior frame is removed comprises a tool body, wherein the tool body is a scaffolding composed of steel pipes, fasteners and steel fence sheets, and the scaffolding comprises an operating area and a fixing area, wherein the operating area is arranged on the outside of the wall and the fixing area is arranged on the inside of the wall.
[0007] On the basis of the above technical solutions, the present invention also provides the following optional technical solutions:
[0008] In an optional solution: the steel pipe includes a first vertical pole, a first longitudinal pole, a transverse pole, a second longitudinal pole, a second vertical pole and an oblique pole, and the steel pipes are connected with each other by fasteners.
[0009] In an optional solution: the operating area is divided into five platforms from top to bottom, wherein the first platform, the third platform, the fourth platform and the fifth platform are all composed of a first vertical pole, a first longitudinal pole and a transverse pole, and the second platform is composed of a first vertical pole, a second longitudinal pole and a transverse pole.
[0010] In an optional solution, the fixing area is composed of a second vertical rod, and the second vertical rod is fixed to one end of the second longitudinal rod.
[0011] In an optional solution: an oblique rod is provided between the operating area and the fixed area, and the oblique rod is connected to the first vertical rod, the second vertical rod, and the cross rod of the second platform via fasteners.
[0012] In an optional solution: the fifth-level platform is provided with a steel fence serving as a standing platform, and the steel fence is fixed on the first longitudinal rod.
[0013] In an optional solution: the diameter of the steel pipes is 48 mm and the wall thickness is 3.2 mm.
[0014] In an optional solution: the fasteners include right-angle fasteners and rotating fasteners, wherein rotating fasteners are used to connect the diagonal rods to the first vertical rods, the second vertical rods, and the cross rods of the second-layer platform, and right-angle fasteners are used in other positions.
[0015] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0016] The utility model makes full use of existing materials at the construction site by adopting a scaffold assembled by steel pipes, fasteners and steel fences. When in use, the scaffold is directly hoisted to the wall that needs to be repaired and installed, avoiding workers' repeated erection. The scaffold is flexible and light, and is convenient for workers to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a front structural schematic diagram of the present utility model.
[0018] Figure 2 It is a rear view structural schematic diagram of the present utility model.
[0019] Figure 3 It is a schematic diagram of the structure of the utility model from above.
[0020] Notes on the accompanying drawings: 1. First vertical pole; 2. First longitudinal pole; 3. Horizontal pole; 4. Second longitudinal pole; 5. Fastener; 6. Steel fence; 7. Second vertical pole; 8. Diagonal pole; 9. Wall. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0022] In one embodiment, Figure 1-Figure 3As shown, a simple tool for repairing an exterior wall after the exterior frame is removed includes a tool body, which is a scaffolding composed of steel pipes, fasteners 5 and steel fences 6. The scaffolding includes an operating area and a fixing area. The operating area is located on the outside of the wall 9, and the fixing area is located on the inside of the wall 9. When in use, the scaffolding is hoisted to the wall 9 that needs to be repaired, and then the scaffolding is fixed to the wall 9 through the fixing area. Workers stand in the operating area to perform repair construction.
[0023] In one embodiment, Figure 1-Figure 3 As shown, the steel pipe includes a first vertical pole 1, a first longitudinal pole 2, a transverse pole 3, a second longitudinal pole 4, a second vertical pole 7 and an oblique pole 8. The steel pipes are connected by fasteners 5. The selection and installation of the fasteners strictly comply with safety regulations to ensure that the connections are tight, seamless, stable and reliable, and to prevent safety hazards caused by loose connections during operation.
[0024] In one embodiment, Figure 1-Figure 3 As shown, the operating area is divided into five platforms from top to bottom, among which the first platform, the third platform, the fourth platform and the fifth platform are all composed of the first vertical pole 1, the first longitudinal pole 2 and the cross bar 3, the second platform is composed of the first vertical pole 1, the second longitudinal pole 4 and the cross bar 3, the fifth platform is a standing platform, and the first to fourth platforms are used as ladders for people to go up and down.
[0025] In one embodiment, Figure 1-Figure 3 As shown, the fixed area is composed of a second vertical rod 7, which is fixed to one end of the second longitudinal rod 4. When in use, the second vertical rod 7 is clamped on the inner side of the wall 9 to support the operating area outside the wall 9.
[0026] In one embodiment, Figure 1-Figure 3 As shown, an inclined rod 8 is provided between the operating area and the fixed area. The inclined rod 8 is connected to the first vertical rod 1, the second vertical rod 7, and the cross bar 3 of the second platform through fasteners 5. The inclined rod 8 serves to reinforce the entire scaffolding.
[0027] In one embodiment, Figure 1-Figure 3 As shown, the fifth-layer platform is provided with a steel fence 6 as a standing platform. The steel fence 6 is fixed on the first longitudinal rod 2. When in use, personnel enter the operating area from the upper end of the scaffolding, and then stand on the steel fence 6 to perform repair construction.
[0028] In one embodiment, Figure 1-Figure 3 As shown, the diameter of the steel pipes is 48 mm and the wall thickness is 3.2 mm.
[0029] In one embodiment, Figure 1-Figure 3As shown, the fasteners 5 include right-angle fasteners and rotary fasteners. The rotary fasteners are used to connect the diagonal rod 8 with the first vertical rod 1, the second vertical rod 7, and the cross bar 3 of the second-layer platform, and the right-angle fasteners are used in the other positions. Before each use, you should check whether the fasteners on the fasteners 5 are firm to avoid the collapse of the scaffolding due to loose fasteners.
[0030] The above embodiment discloses a simple tool for repairing the exterior wall after the exterior frame is dismantled. The simple tool is assembled with steel pipes, fasteners 5, and steel fences 6. When in use, the scaffolding is hoisted to the wall 9 that needs to be repaired, and then the second vertical pole 7 is clamped on the inner side of the wall 9 to support the operation area outside the wall 9. During construction, first, workers must strictly follow safety regulations, wear and tighten the safety belt correctly, ensure that the safety belt fits tightly to the body, and the fixing point is stable and reliable to prevent accidental falls during high-altitude operations. Then, after confirming that all safety measures are in place, workers can enter the operation area, stand on the steel fence 6, and start construction operations. During the entire construction process, workers should always be vigilant, pay attention to changes in the surrounding environment, and ensure that operations are carried out safely and orderly.
[0031] The above description is merely a specific embodiment of the present application, but the scope of protection of the present application is not limited thereto. Any changes or substitutions that can be easily conceived by a person skilled in the art within the technical scope disclosed in this application should be included in the scope of protection of the present application. Therefore, the scope of protection of the present application should be based on the scope of protection of the claims.
Claims
1. A simple tool for repairing an exterior wall after the exterior frame is removed, comprising a tool body, wherein the tool body is a scaffold, characterized in that: The scaffolding is composed of steel pipes, fasteners (5) and steel fences (6). The scaffolding includes an operating area and a fixing area. The operating area is arranged outside the wall (9), and the fixing area is arranged inside the wall (9).
2. A simple tool for repairing an exterior wall after the exterior frame is removed according to claim 1, characterized in that: The steel pipe comprises a first vertical rod (1), a first longitudinal rod (2), a transverse rod (3), a second longitudinal rod (4), a second vertical rod (7) and an oblique rod (8), and the steel pipes are connected with each other by fasteners (5).
3. A simple tool for repairing an exterior wall after the exterior frame is removed according to claim 2, characterized in that: The operating area is divided into five platforms from top to bottom, wherein the first platform, the third platform, the fourth platform and the fifth platform are all composed of a first vertical pole (1), a first longitudinal pole (2) and a transverse pole (3), and the second platform is composed of a first vertical pole (1), a second longitudinal pole (4) and a transverse pole (3).
4. A simple tool for repairing an exterior wall after the exterior frame is removed according to claim 1, characterized in that: The fixing area is composed of a second vertical rod (7), and the second vertical rod (7) is fixed to one end of the second longitudinal rod (4).
5. A simple tool for repairing an exterior wall after the exterior frame is removed according to claim 1, characterized in that: An oblique rod (8) is provided between the operating area and the fixed area, and the oblique rod (8) is connected to the first vertical rod (1), the second vertical rod (7), and the cross rod (3) of the second platform via fasteners (5).
6. A simple tool for repairing an exterior wall after the exterior frame is removed according to claim 3, characterized in that: The fifth-layer platform is provided with a steel fence (6) serving as a standing platform, and the steel fence (6) is fixed on the first longitudinal rod (2).
7. A simple tool for repairing an exterior wall after the exterior frame is removed according to claim 1, characterized in that: The steel pipes have a diameter of 48 mm and a wall thickness of 3.2 mm.
8. The simple tool for repairing an exterior wall after the exterior frame is removed according to claim 3, characterized in that: The fasteners (5) include right-angle fasteners and rotation fasteners, wherein the rotation fasteners are used when connecting the diagonal rod (8) with the first vertical rod (1), the second vertical rod (7), and the crossbar (3) of the second platform, and right-angle fasteners are used at other positions.