On-line monitoring device for construction site

Through the design of the support frame, adjustment rod, load-bearing plate and installation components, the problems of independent replacement and stable monitoring of construction site monitoring equipment are solved, the convenient disassembly and assembly of equipment and the continuity of environmental monitoring are achieved, and equipment damage and data errors are reduced.

CN223307604UActive Publication Date: 2025-09-05BEIJING JING SHUI CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422423795.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2025-09-05
Estimated Expiration
2034-10-08

AI Technical Summary

Technical Problem

When replacing existing construction site monitoring equipment, the undamaged equipment must be disassembled together, resulting in additional removal and placement work, and it is impossible to easily and quickly perform independent replacement and installation.

Method used

The support frame, adjustment rod, load plate and installation components are used. The toothed plate and tension spring are used to achieve stable clamping and independent disassembly of the monitoring equipment. Combined with the lifting component and protective frame, stable monitoring and protection of the monitoring equipment in different height areas are ensured.

Benefits of technology

It realizes the independent disassembly and assembly of monitoring equipment, reduces the error of monitoring data, improves the stability of equipment and the convenience of maintenance, prevents the damage of dust and sand to the display screen, and ensures the continuity of construction site environmental monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223307604U_ABST
    Figure CN223307604U_ABST
Patent Text Reader

Abstract

The utility model relates to a construction site on-line monitoring device which comprises a supporting frame provided with a supporting sleeve; the adjusting rod is arranged above the supporting frame, the adjusting rod penetrates through the supporting sleeve, the adjusting rod can achieve lifting adjustment at the position of the supporting sleeve, and the adjusting rod is provided with a plurality of bearing plates; the monitoring equipment comprises a plurality of environment monitoring assemblies and is arranged on the bearing plate, and the monitoring equipment is used for monitoring environment conditions; the mounting assembly comprises a plurality of upper clamping tooth discs and lower clamping tooth discs, and the upper clamping tooth discs and the lower clamping tooth discs are clamped to the top and the bottom of the bearing plate in the same vertical direction respectively. According to the invention, the environment monitoring assembly can be conveniently, rapidly and independently disassembled and assembled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction site monitoring, and in particular to an online monitoring device for a construction site. Background Art

[0002] Currently, noise, dust and other pollution may be generated at construction sites. Monitoring equipment can help monitor these pollution indicators in real time to ensure that they are within the specified safety range, reduce the impact on the surrounding environment, provide meteorological warning and forecast services for construction operations, enhance the site's ability to prevent disasters and reduce the risk of production safety accidents caused by meteorological reasons.

[0003] In the prior art, when monitoring equipment is installed at a construction site, multiple monitoring devices are often fixed on several support plates, and several support plates are put on and fixed on a pole body for combined monitoring. When one of the monitoring devices is damaged and needs to be replaced, the support plate needs to be separated from the pole body, which means that the undamaged monitoring devices need to be taken down together, resulting in additional work of taking, placing and organizing the wire harnesses, and multiple monitoring devices cannot be replaced and installed independently and conveniently and quickly.

[0004] Therefore, it is necessary to propose an online monitoring device for construction site in order to solve the above problems. Utility Model Content

[0005] In order to improve the problem that multiple monitoring devices cannot be replaced and installed independently and quickly, the present application provides a construction site online monitoring device.

[0006] The application provides a construction site online monitoring device that adopts the following technical solutions:

[0007] A construction site online monitoring device comprises: a support frame, wherein the support frame is provided with a support sleeve;

[0008] An adjusting rod is provided above the support frame and passes through the support sleeve. The adjusting rod can be raised and lowered at the support sleeve and is provided with a plurality of bearing plates.

[0009] A monitoring device, comprising a plurality of environmental monitoring components, is disposed on the carrier plate, and the monitoring device is used for environmental condition monitoring; and

[0010] The mounting assembly includes several upper toothed discs and lower toothed discs, which are respectively clamped at the top and bottom of the supporting plate in the same vertical direction. Tension springs are provided on both sides of the opposite surfaces of the upper toothed discs and the lower toothed discs for clamping the upper toothed discs and the lower toothed discs at the supporting plate. Each environmental monitoring assembly is arranged on the top of the upper toothed disc.

[0011] By adopting the above technical solution, multiple environmental monitoring components are used to monitor the environmental conditions. According to the environmental conditions of the construction site, the height of the adjustment rod can be adjusted at the support sleeve, so that the monitoring equipment can monitor the environmental conditions within different height areas of the construction site, reducing the error of the monitoring data. When installing multiple environmental monitoring components, the installation components can be stably clamped on the supporting plate to ensure that each environmental monitoring component is stable on the supporting plate, and each environmental monitoring component can be independently disassembled and assembled to avoid damage to one of the environmental monitoring components and the removal of the undamaged environmental monitoring components, which will affect the monitoring.

[0012] Optionally, the support frame includes a support seat, a support platform and a plurality of support rods, the plurality of support rods are arranged in a circle on the support seat, the support platform is fixedly connected to the top of the support rods, and the lifting assembly is arranged at the bottom of the support platform.

[0013] By adopting the above technical solution, a plurality of support rods form a support for the support platform on the support seat, maintaining the stability of the support platform when in use, and the support seat can be fixed on the ground, so that the entire device can be stably installed.

[0014] Optionally, it also includes a lifting component, which is arranged on the support frame, and the connecting end of the lifting component is connected to the bottom of the adjusting rod. The lifting component includes an electric push rod and a lifting plate. The electric push rod is arranged on both sides of the bottom of the support platform, and the lifting plate is sleeved on the support rod. The lifting plate is slidably connected to the support rod, the top middle part of the lifting plate is connected to the bottom of the adjusting rod, and the output end of the electric push rod is connected to the lifting plate.

[0015] By adopting the above technical solution, when the height of the monitoring equipment needs to be adjusted, the output end of the electric push rod drives the lifting plate to rise and fall, so that the working height of the adjusting rod can be raised and lowered within the supporting sleeve, so that the monitoring equipment can monitor the environmental conditions in different height areas at the construction site.

[0016] Optionally, the monitoring device includes a mounting rod and a camera, the mounting rod is arranged at the top end of the adjustment rod, and the cameras are arranged at both ends of the mounting rod, and the construction site is monitored by the cameras.

[0017] By adopting the above technical solution, the construction site is monitored by the camera on the mounting pole, so as to monitor the construction site, improve the safety monitoring of the construction site, and deal with problems in a timely manner.

[0018] Optionally, the monitoring device further includes a display assembly disposed outside the supporting sleeve, the display assembly including a display screen and a protective frame, and the display screen is disposed within the protective frame.

[0019] By adopting the above technical solution, the display screen will display the monitored data. In order to reduce the impact of dust or sand and gravel at the construction site on the display screen, the protective frame is used to protect the display screen to avoid damage to the display screen, which causes the construction site to be unable to obtain monitored data information in a short period of time, affecting the on-site personnel's judgment of the construction site environment.

[0020] Optionally, a transparent protective cover is provided on the front of the protective frame.

[0021] By adopting the above technical solution, while the protective frame protects the display screen, the transparent protective cover further protects the display screen, thereby reducing the impact of dust and sand on the display screen.

[0022] Optionally, a disassembly block is provided on the outer sleeve of the support sleeve, and connecting blocks are provided on both sides of the disassembly block. A connecting plate is provided at one end of the connecting block, and the connecting plate is connected to the rear end of the protective frame by bolts. The connecting plate at the other side of the connecting block is connected to the control cabinet by bolts.

[0023] By adopting the above technical solution, the protective frame and the control cabinet can be stably installed and can be disassembled separately for maintenance and replacement.

[0024] Optionally, a plurality of positioning screws are further included, and the positioning screws are used for fixing the connection between the supporting plate and the adjusting rod.

[0025] By adopting the above technical solution, the stability between the supporting plate and the adjusting rod is increased, thereby preventing the supporting plate from being offset on the adjusting rod.

[0026] In summary, this application includes at least one of the following beneficial technical effects:

[0027] 1. When installing multiple environmental monitoring components, the mounting components can be stably clamped on the carrier plate to ensure that each environmental monitoring component is stable on the carrier plate, and each environmental monitoring component can be independently disassembled and assembled, avoiding the removal of undamaged environmental monitoring components when one environmental monitoring component is damaged, thereby making the environmental monitoring components easy and quick to independently disassemble and assemble;

[0028] 2. According to the environmental conditions of the construction site, the monitoring equipment can monitor the environmental conditions at different heights of the construction site through the lifting components, reducing the error of the monitoring data;

[0029] 3. In order to reduce the impact of dust or sand and gravel on the construction site on the display screen, a protective frame and a transparent protective cover are used to protect the display screen to avoid damage to the display screen, which will cause the construction site to be unable to obtain monitoring data information in a short period of time, affecting the on-site personnel's judgment of the construction site environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a three-dimensional view of a construction site online monitoring and detection device provided in an embodiment of the present application.

[0031] Figure 2 yes Figure 1 The overall structural front view provided in .

[0032] Figure 3 yes Figure 1 A cross-sectional view of the protective frame is provided in .

[0033] Figure 4 yes Figure 1 A magnified schematic diagram of the structure at point A in the middle.

[0034] Figure 5 yes Figure 1 A magnified schematic diagram of the structure at point B.

[0035] In the figure: 1. Support frame; 11. Support base; 12. Support platform; 13. Support rod; 2. Support sleeve; 21. Disassembly and assembly block; 22. Connecting block; 23. Connecting plate; 3. Monitoring equipment; 31. Mounting rod; 32. Camera; 33. Dust monitor; 34. Noise monitor; 35. Wind speed and direction meter; 4. Adjusting rod; 41. Loading plate; 42. Positioning screw; 5. Lifting assembly; 51. Electric push rod; 52. Lifting plate; 6. Display assembly; 61. Display screen; 62. Protective frame; 63. Transparent protective cover; 7. Mounting assembly; 71. Upper toothed plate; 72. Lower toothed plate; 73. Tension spring; 8. Control cabinet. DETAILED DESCRIPTION

[0036] The following is combined with Figure 1-5 This application is described in further detail.

[0037] refer to Figure 1-5 The embodiment of the present application discloses an online monitoring device for a construction site, including: a support frame 1, an adjustment rod 4, a monitoring device 3 and an installation component 7.

[0038] A supporting sleeve 2 is provided on the supporting frame 1, an adjusting rod 4 is provided above the supporting frame 1, and the adjusting rod 4 passes through the supporting sleeve 2. The adjusting rod 4 can be raised and lowered at the supporting sleeve 2. The adjusting rod 4 is provided with several supporting plates 41. The monitoring equipment 3 includes multiple environmental monitoring components, which are provided on the supporting plates 41. The monitoring equipment 3 is used for environmental condition monitoring.

[0039] The mounting assembly 7 includes several upper toothed discs 71 and lower toothed discs 72. The upper toothed discs 71 and lower toothed discs 72 are respectively clamped on the top and bottom of the supporting plate 41 in the same vertical direction. Tension springs 73 are provided on both sides of the opposite surfaces of the upper toothed discs 71 and lower toothed discs 72 for clamping the upper toothed discs 71 and lower toothed discs 72 on the supporting plate 41. Each environmental monitoring assembly is arranged on the top of the upper toothed disc 71.

[0040] Multiple environmental monitoring components are used to monitor the environmental conditions. According to the environmental conditions of the construction site, the height of the adjustment rod 4 can be adjusted at the support sleeve 2, so that the monitoring equipment 3 can monitor the environmental conditions within different height areas of the construction site, reducing the error of the monitoring data. When installing multiple environmental monitoring components, the installation component 7 can be stably clamped on the supporting plate 41 to ensure that each environmental monitoring component is stable on the supporting plate 41, and each environmental monitoring component can be independently disassembled and assembled to avoid damage to one of the environmental monitoring components and the removal of the undamaged environmental monitoring components, which will affect the monitoring.

[0041] In this embodiment, more specifically, the support frame 1 includes a support base 11, a support platform 12 and a plurality of support rods 13. The plurality of support rods 13 are arranged in a circle on the support base 11. The support platform 12 is fixedly connected to the top of the support rod 13. The lifting assembly 5 is arranged at the bottom of the support platform 12. The plurality of support rods 13 form a support for the support platform 12 on the support base 11 to maintain the stability of the support platform 12 when in use. The support base 11 can be fixed on the ground, so that the overall device can be stably installed.

[0042] In this embodiment, more specifically, it also includes a lifting component 5, which is arranged on the support frame 1. The connecting end of the lifting component 5 is connected to the bottom of the adjusting rod 4. The lifting component 5 includes an electric push rod 51 and a lifting plate 52. The electric push rod 51 is arranged on both sides of the bottom of the support platform 12. The lifting plate 52 is sleeved on the support rod 13. The lifting plate 52 is slidably connected to the support rod 13. The top middle part of the lifting plate 52 is connected to the bottom of the adjusting rod 4. The output end of the electric push rod 51 is connected to the lifting plate 52. When the height of the monitoring equipment 3 needs to be adjusted, the output end of the electric push rod 51 drives the lifting plate 52 to rise and fall, so as to realize the lifting and falling of the use height of the adjusting rod 4 within the support sleeve 2, so that the monitoring equipment 3 can monitor the environmental conditions in different height areas at the construction site.

[0043] In this embodiment, more specifically, the outer sleeve of the support sleeve 2 is provided with a disassembly block 21, and connecting blocks 22 are provided on both sides of the disassembly block 21. A connecting plate 23 is provided at one end of the connecting block 22, and the connecting plate 23 is connected to the rear end of the protective frame 62 by bolts. The connecting plate 23 at the other side of the connecting block 22 is connected to the control cabinet 8 by bolts. The control cabinet 8 is the control system of the entire device, which facilitates the stable installation of the protective frame 62 and the control cabinet 8 while being able to be disassembled separately for maintenance and replacement.

[0044] In this embodiment, more specifically, a plurality of positioning screws 42 are further included, which are used for fixing the connection between the supporting plate 41 and the adjusting rod 4, thereby increasing the stability between the supporting plate 41 and the adjusting rod 4 and preventing the supporting plate 41 from being offset on the adjusting rod 4.

[0045] In this embodiment, more specifically, the monitoring equipment 3 includes a mounting rod 31 and a camera 32. The mounting rod 31 is arranged at the top of the adjusting rod 4, and the cameras 32 are arranged at both ends of the mounting rod 31. The construction site is monitored by the camera 32, and the construction site is monitored on the mounting rod 31 by the camera 32, so as to monitor the construction site, improve the safety monitoring of the construction site, and respond to problems in a timely manner.

[0046] In this embodiment, more specifically, the monitoring device 3 also includes a display component 6, which is arranged outside the supporting sleeve 2. The display component 6 includes a display screen 61 and a protective frame 62. The display screen 61 is arranged in the protective frame 62. A transparent protective cover 63 is provided on the front of the protective frame 62. The display screen 61 displays the monitored data. In order to reduce the impact of dust or sand and gravel at the construction site on the display screen 61, the protective frame 62 is used to protect the display screen 61 to avoid damage to the display screen 61, which may cause the construction site to be unable to obtain monitoring data information in a short time, affecting the on-site personnel's judgment of the construction site environment.

[0047] In this embodiment, more specifically, the multiple environmental monitoring components may be: a dust monitor 33, a noise monitor 34 and an anemometer 35. The dust monitor 33 is used to monitor and detect dust at the construction site. The dust monitor 33 uses a PM10 monitor and / or a PM2.5 monitor to monitor particulate matter in the air at the construction site. Using the anemometer 35 to monitor wind speed and direction helps to understand and evaluate environmental conditions, such as air quality, pollutant diffusion, etc.

[0048] The implementation principle of an online monitoring device for a construction site in an embodiment of the present application is: multiple environmental monitoring components are used to monitor the environmental conditions. According to the environmental conditions of the construction site, the height of the adjusting rod 4 is adjusted at the support sleeve 2 through the lifting component 5, so that the monitoring equipment 3 can monitor the environmental conditions within different height areas of the construction site, reducing the error of the monitoring data. When installing multiple environmental monitoring components, the installation component 7 can be used to stably clamp them on the supporting plate 41 to ensure that each environmental monitoring component is independently and stably on the supporting plate 41.

[0049] The above are all preferred embodiments of the present application, and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the scope of protection of the present application.

Claims

1. A construction site online monitoring device, characterized in that: include: A support frame (1), wherein a support sleeve (2) is provided on the support frame (1); An adjusting rod (4) is arranged above the support frame (1), and the adjusting rod (4) passes through the support sleeve (2). The adjusting rod (4) can be adjusted up and down at the support sleeve (2), and the adjusting rod (4) is provided with a plurality of bearing plates (41); A monitoring device (3), comprising a plurality of environmental monitoring components, is arranged on the carrier plate (41), and the monitoring device (3) is used for environmental condition monitoring; and The mounting assembly (7) comprises a plurality of upper toothed discs (71) and lower toothed discs (72), wherein the upper toothed discs (71) and the lower toothed discs (72) are respectively connected to the top and the bottom of the carrier plate (41) in the same vertical direction, and tension springs (73) are provided on both sides of the opposite surfaces of the upper toothed discs (71) and the lower toothed discs (72) for clamping the upper toothed discs (71) and the lower toothed discs (72) at the carrier plate (41), and each environmental monitoring assembly is arranged on the top of the upper toothed discs (71).

2. A construction site online monitoring device according to claim 1, characterized in that: The support frame (1) comprises a support seat (11), a support platform (12) and a plurality of support rods (13), wherein the plurality of support rods (13) are arranged in a circular pattern on the support seat (11), the support platform (12) is fixedly connected to the top of the support rods (13), and the lifting assembly (5) is arranged at the bottom of the support platform (12).

3. The construction site online monitoring device according to claim 2, characterized in that: The invention also includes a lifting assembly (5) which is arranged on the support frame (1), wherein the connection end of the lifting assembly (5) is connected to the bottom of the adjusting rod (4), and the lifting assembly (5) includes an electric push rod (51) and a lifting plate (52). The electric push rod (51) is arranged on both sides of the bottom of the support platform (12), and the lifting plate (52) is sleeved on the support rod (13). The lifting plate (52) is slidably connected to the support rod (13), and the middle of the top of the lifting plate (52) is connected to the bottom of the adjusting rod (4), and the output end of the electric push rod (51) is connected to the lifting plate (52).

4. The construction site online monitoring device according to claim 1, characterized in that: The monitoring device (3) comprises a mounting rod (31) and a camera (32); the mounting rod (31) is arranged at the top end of the adjusting rod (4); the camera (32) is arranged at both ends of the mounting rod (31); and the construction site is monitored through the camera (32).

5. The construction site online monitoring device according to claim 1, characterized in that: The monitoring device (3) further comprises a display assembly (6) arranged outside the supporting sleeve (2), wherein the display assembly (6) comprises a display screen (61) and a protective frame (62), and the display screen (61) is arranged inside the protective frame (62).

6. The construction site online monitoring device according to claim 5, characterized in that: A transparent protective cover (63) is provided on the front of the protective frame (62).

7. The construction site online monitoring device according to claim 5, characterized in that: The support sleeve (2) is provided with a disassembly block (21) on the outside, and connecting blocks (22) are provided on both sides of the disassembly block (21). A connecting plate (23) is provided at one end of the connecting block (22), and the connecting plate (23) is connected to the rear end of the protective frame (62) through bolts. The connecting plate (23) at the other side of the connecting block (22) is connected to the control cabinet (8) through bolts.

8. The construction site online monitoring device according to claim 1, characterized in that: It also includes a plurality of positioning screws (42), and the positioning screws (42) are used for fixed connection between the bearing plate (41) and the adjusting rod (4).