In-cylinder safety flat net for chimney outer cylinder construction
By staggeredly arranging steel wire ropes on the inner wall of the chimney to form a grid area and setting up a net inside the grid, the problem of high impact force of falling objects from high altitude is solved, and the safety and protection effect of the chimney outer tube construction are improved.
Patent Information
- Application Number
- CN202422319219.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2025-09-12
- Estimated Expiration
- 2034-09-23
AI Technical Summary
During the construction of the chimney outer tube, the impact force of falling objects from high altitude is large and can easily penetrate the protective shed, resulting in high safety risks. Existing technologies make it difficult to effectively reduce the impact force of falling objects from high altitude.
Steel wire ropes are staggered to form multiple unit grid areas, and nets are arranged inside the grids. They are connected to fixings through steel wire ropes to form a safety flat net inside the cylinder, which is used to cushion the impact of falling objects from high altitude.
It improves the safety factor of chimney outer tube construction, enhances the buffering capacity against falling objects from high altitude, and reduces safety risks during construction.
Smart Images

Figure CN223330285U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of chimney construction, and in particular to a chimney inner tube safety flat net used for chimney outer tube construction. Background Art
[0002] During the construction of the chimney outer tube, falling objects from high altitude are one of the main sources of danger. Generally speaking, personnel are not allowed to stand at the bottom of the chimney inner wall during the chimney construction process. However, in order to avoid accidental risks as much as possible, a protective shed will be arranged at the bottom of the chimney inner wall. However, the height of the chimney is extremely high, and the potential energy of falling objects from high altitude is particularly large, which can easily penetrate the protective shed. Therefore, it is also necessary to reduce the impact of falling objects from high altitude and improve the safety factor. Utility Model Content
[0003] Based on this, it is necessary to provide an inner tube safety flat net for chimney outer tube construction, and its specific technical solution is as follows.
[0004] A chimney inner tube safety flat net for chimney outer tube construction, comprising:
[0005] A plurality of fixing members are arranged along an annular path of the inner wall of the chimney and fixed on the inner wall of the chimney;
[0006] A first steel wire rope, both ends of which are connected to different fixing members via rope clamps; a plurality of first steel wire ropes are staggered to divide the interior of the chimney into a plurality of unit grid areas;
[0007] The second steel wire rope is passed through each fixing member in sequence along a circular path on the inner wall of the chimney to form a loop;
[0008] The bag nets are arranged one by one in the unit grid area, and the edges of the bag nets are fixed with the first steel wire rope; the bag net located in the center of the cylinder wall is provided with an opening for accommodating the construction elevator to pass through; the bag nets located at the edge of the cylinder wall are tied with the second steel wire rope.
[0009] Furthermore, the fixing member includes an expansion bolt segment and a connecting ring segment located on the top of the expansion bolt segment; the first steel wire rope is connected to the connecting ring segment through a rope clamp, and the second steel wire rope passes through the connecting ring segment.
[0010] Furthermore, the fixing member includes a main fixing member and a secondary fixing member, the main fixing member corresponds to the first steel wire rope, so that the end of the first steel wire rope is connected to the main fixing member; a plurality of secondary fixing members are arranged between adjacent main fixing members, and the second steel wire rope passes through each main fixing member and secondary fixing member in sequence along a circular path of the inner wall of the chimney.
[0011] Furthermore, a corbel is provided on the inner wall of the chimney, and the fixing member is fixed on the corbel.
[0012] Furthermore, the net is fixed by tying it to the first steel wire rope or the second steel wire rope through a cable tie.
[0013] Furthermore, a third steel wire rope is provided in the middle unit grid area, the end of the third steel wire rope is connected to the first steel wire rope, and multiple staggered third steel wire ropes form a rope mouth aligned with the opening, and the net located in the center of the cylinder wall is tied to the third steel wire rope.
[0014] Furthermore, the net includes a rope edge and a rope net, the rope net includes a plurality of cross-arranged ropes, the ends of the ropes are tied to the rope edge, and the rope edge is tied to the first steel wire rope or the second steel wire rope.
[0015] Furthermore, the rope edge forms a quadrilateral shape, and the four corners of the rope edge are hung at the intersecting positions of the first steel wire rope and the second steel wire rope through S-shaped hooks respectively.
[0016] Furthermore, multiple layers of safety nets are arranged inside the chimney in a vertical direction of the chimney.
[0017] Beneficial effects: The utility model provides an internal safety net for chimney outer tube construction, which can unload and buffer falling objects from high altitude to protect the protective shed on the ground, thereby improving the overall safety factor of the chimney outer tube construction protection system; steel wire ropes are staggered to form multiple unit grid areas and then the net is tied together, which improves the overall bearing capacity of the safety net, and the installation and layout process is also relatively simple. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0019] Figure 1 A schematic diagram of the installation layout of the flat net;
[0020] Figure 2 This is a schematic diagram of the wire rope layout after the net is removed;
[0021] Figure 3 This is a schematic diagram of the arrangement of the corbel and fixings;
[0022] Figure 4 Schematic diagram of the status of the net and hook.
[0023] Explanation of reference numerals: 1, first steel wire rope; 2, second steel wire rope; 3, net; 4, corbel; 5, unit grid area; 6, primary fixing member; 7, secondary fixing member; 8, third steel wire rope; 9, opening;
[0024] 31. Rope edge; 32. Rope net; 33. Hook;
[0025] 61. Expansion bolt section; 62. Connecting ring section. DETAILED DESCRIPTION
[0026] To make the above-mentioned objects, features, and advantages of the present application more clearly understood, the specific embodiments of the present application are described in detail below with reference to the accompanying drawings. The following description sets forth many specific details to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways than those described herein, and those skilled in the art can make similar improvements without violating the scope of the present application. Therefore, the present application is not limited to the specific embodiments disclosed below.
[0027] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0028] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of the technical features being referred to. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of such features. Throughout the description of this application, "plurality" means at least two, for example, two, three, etc., unless otherwise specifically defined.
[0029] In this application, unless otherwise specified or limited, the terms "installed," "connected," "connect," "fixed," etc. should be understood in a broad sense. For example, they can refer to fixed connection, detachable connection, or integration; mechanical connection or electrical connection; direct connection or indirect connection through an intermediate medium; internal communication between two elements or interaction between two elements, unless otherwise specified. Those skilled in the art will understand the specific meanings of the above terms in this application based on specific circumstances.
[0030] In this application, unless otherwise expressly specified or limited, when a first feature is "above" or "below" a second feature, it may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Furthermore, when a first feature is "above," "above," or "above" a second feature, it may mean that the first feature is directly above or diagonally above the second feature, or simply means that the first feature is at a higher level than the second feature. When a first feature is "below," "below," or "below" a second feature, it may mean that the first feature is directly below or diagonally below the second feature, or simply means that the first feature is at a lower level than the second feature.
[0031] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an intermediate element. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and similar expressions used herein are for illustrative purposes only and do not represent the only implementation methods.
[0032] Example
[0033] This embodiment provides a safety net for chimney outer tube construction, referring to Figure 1 and Figure 2 As shown, it includes a fixing member, a first steel wire rope 1, a second steel wire rope 2, and a net 3. There are multiple fixing members, each of which is arranged along a circular path and fixed to the chimney inner wall. In this embodiment, the chimney inner wall is provided with a corbel 4, which is arranged along the chimney's circumference, and the fixing member is mounted on the corbel 4. The corbel 4 is an inherent structure of the chimney itself and is used to mount other structures on the chimney inner wall. Installing the fixing member on the corbel 4 does not damage the chimney's interior or require the installation of additional structures, thus reducing workload.
[0034] The ends of the first steel wire rope 1 are connected to different fixings via rope clamps. Specifically, one first steel wire rope 1 corresponds to two fixings, ensuring that the first steel wire rope 1 is stretched straight and its ends are connected to the fixings via rope clamps. Multiple first steel wire ropes 1 are arranged in a staggered arrangement in both the horizontal and vertical directions, dividing the interior of the chimney into multiple unit grid areas 5.
[0035] The second steel wire rope 2 passes through each fixing member in sequence along the annular path of the chimney inner wall to form a ring shape, so that the second steel wire rope 2 is arranged along the annular direction of the chimney inner wall.
[0036] Reference Figure 1As shown, multiple nets 3 are arranged in a one-to-one correspondence within the unit grid area 5, and the edges of the nets 3 are tied and secured to the first steel wire rope 1. By arranging multiple nets 3 in conjunction with the first steel wire rope 1, the overall impact resistance is improved, enhancing the buffering effect against falling objects from high altitude. The nets 3 at the edge of the cylinder wall are tied to the second steel wire rope 2, reducing the gap between the nets 3 and the edge of the cylinder wall and improving the protection effect at the edge.
[0037] Specifically, a plurality of unit grid areas 5 arranged in the horizontal and vertical directions are formed by staggered arrangement of multiple steel ropes. In order to facilitate the passage of the construction elevator, an opening 9 is set on the net 3 corresponding to the construction area located in the center of the cylinder wall, so that the construction elevator can pass through the opening 9.
[0038] The present embodiment provides an internal safety net for chimney outer tube construction, which can unload and buffer falling objects from high altitude to protect the protective shed on the ground, thereby improving the overall safety factor of the chimney outer tube construction protection system; steel wire ropes are staggered to form multiple unit grid areas 5 and then the net 3 is tied together, which improves the overall bearing capacity of the safety net, and the installation and layout process is also relatively simple.
[0039] Specifically, refer to Figure 3 As shown, the fixing member includes an expansion bolt segment 61 and a connecting ring segment 62 located on top of the expansion bolt segment 61. The first steel wire rope 1 is connected to the connecting ring segment 62 through a rope clamp, and the second steel wire rope 2 passes through the connecting ring segments 62 of each fixing member in sequence.
[0040] Specifically, in order to further reduce the gap between the net 3 and the inner wall of the chimney, the fixing parts include a main fixing part 6 and a secondary fixing part 7. The main fixing part 6 corresponds to the first steel wire rope 1, that is, one first steel wire rope 1 corresponds to two main fixing parts 6, so that the end of the first steel wire rope 1 is connected to the main fixing part 6. A plurality of secondary fixing parts 7 are provided between adjacent main fixing parts 6, and the second steel wire rope 2 passes through each main fixing part 6 and secondary fixing part 7 in sequence along the annular path of the inner wall of the chimney. By arranging a plurality of secondary fixing parts 7 between adjacent main fixing parts 6 for encryption, the outline of the second steel wire rope 2 is closer to the inner wall of the chimney, and the net 3 at the edge is tied to the second steel wire rope 2, further reducing the gap between the net 3 and the cylinder wall.
[0041] Specifically, in this embodiment, the steel wire rope and the bag net 3 can be tied and fixed with a cable tie, or they can be tied directly with other structures such as a rope belt.
[0042] Specifically, a third steel rope 8 is provided in the middle unit grid area 5. The end of the third steel rope 8 is connected to the first steel rope 1. Multiple third steel ropes 8 are arranged in a staggered manner to form a rope opening aligned with the opening 9. The net 3 located at the center of the cylinder wall is tied to the third steel rope 8. This tightens the opening 9 of the net 3, reducing the gap between the net 3 and the construction elevator.
[0043] Specifically, refer to Figure 4 As shown, the net 3 includes a rope edge 31 and a rope net 32. The rope net 32 comprises multiple cross-arranged ropes, which are tied to the rope edge 31. The rope edge 31 is tied to the first steel wire rope 1 or the second steel wire rope 2. The rope edge 31 is formed into a quadrilateral shape, and the four corners of the rope edge 31 are hooked to the intersecting positions of the first steel wire rope 1 and the second steel wire rope 2 via S-shaped hooks 33. When tying the net 3 to the steel wire rope, the S-shaped hooks 33 are hung at the four corners of the rope edge 31, with one end of the hook 33 hooked to the rope edge 31 and the other end hooked to the intersecting position of the first steel wire rope 1 and the second steel wire rope 2. The net 3 is unfolded and its outline is roughly aligned with the unit grid area 5. It is then tied with a cable tie, improving the construction efficiency of the construction workers. After the net 3 is tied, the hooks can be removed and reused.
[0044] Specifically, in this embodiment, multiple layers of safety nets are arranged in a vertical direction of the chimney and arranged inside the chimney. The position of each layer of safety net can be determined according to the height of the corbels 4 in the chimney.
[0045] Construction method: First, install the fixings on the corbels 4. Then connect the first steel ropes 1 to the main fixings 6. The first steel ropes 1 are arranged in a staggered manner to form multiple unit grid areas 5. The second steel ropes 2 are passed through each fixing in sequence to form a loop. Then, align each net 3 with each unit grid area 5 one by one, and tie the net 3 to the first steel ropes 1 and second steel ropes 2 respectively.
[0046] The technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, not all possible combinations of the technical features in the above-mentioned embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0047] The above-described embodiments merely represent several implementation methods of the present application. While the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the patent application. It should be noted that a person of ordinary skill in the art may make various modifications and improvements without departing from the spirit of the present application, and these modifications and improvements fall within the scope of protection of the present application. Therefore, the scope of protection of the present patent application shall be determined by the appended claims.
Claims
1. A safety net for chimney outer tube construction, characterized in that: include: A plurality of fixing members are arranged along an annular path of the inner wall of the chimney and fixed on the inner wall of the chimney; A first steel wire rope, both ends of which are connected to different fixing members via rope clamps; a plurality of first steel wire ropes are staggered to divide the interior of the chimney into a plurality of unit grid areas; The second steel wire rope is passed through each fixing member in sequence along a circular path on the inner wall of the chimney to form a loop; The bag nets are arranged one by one in the unit grid area, and the edges of the bag nets are fixed with the first steel wire rope; the bag net located in the center of the cylinder wall is provided with an opening for accommodating the construction elevator to pass through; the bag nets located at the edge of the cylinder wall are tied with the second steel wire rope.
2. The inner safety net for chimney outer tube construction according to claim 1 is characterized in that: The fixing member includes an expansion bolt segment and a connecting ring segment located on the top of the expansion bolt segment; the first steel wire rope is connected to the connecting ring segment through a rope clamp, and the second steel wire rope passes through the connecting ring segment.
3. The inner safety net for chimney outer tube construction according to claim 2 is characterized in that: The fixing member includes a main fixing member and a secondary fixing member. The main fixing member corresponds to the first steel wire rope, so that the end of the first steel wire rope is connected to the main fixing member; a plurality of secondary fixing members are arranged between adjacent main fixing members, and the second steel wire rope passes through each main fixing member and secondary fixing member in sequence along a circular path on the inner wall of the chimney.
4. The inner safety net for chimney outer tube construction according to claim 1 is characterized in that: A corbel is provided on the inner wall of the chimney, and the fixing piece is fixed on the corbel.
5. The inner safety net for chimney outer tube construction according to claim 1 is characterized in that: The bag net is tied and fixed to the first steel wire rope or the second steel wire rope through a cable tie.
6. The inner safety net for chimney outer tube construction according to claim 1 is characterized in that: A third steel wire rope is provided in the middle unit grid area, the end of the third steel wire rope is connected to the first steel wire rope, and multiple staggered third steel wire ropes form a rope mouth aligned with the opening, and the net located in the center of the cylinder wall is tied to the third steel wire rope.
7. The inner safety net for chimney outer tube construction according to claim 1 is characterized in that: The net includes a rope edge and a rope net. The rope net includes a plurality of cross-arranged ropes. The ends of the ropes are tied to the rope edge. The rope edge is tied to the first steel wire rope or the second steel wire rope.
8. The inner safety net for chimney outer tube construction according to claim 7, characterized in that: The rope edge forms a quadrilateral shape, and the four corners of the rope edge are respectively hung on the staggered positions of the first steel wire rope and the second steel wire rope through S-shaped hooks.
9. The inner safety net for chimney outer tube construction according to claim 1, characterized in that: The multi-layer safety nets are arranged inside the chimney along the vertical direction of the chimney.