By pre-digging holes in the hardened ground and casting a detachable anchoring structure with a threaded sleeve, the problem of traditional connection methods affecting the detachable performance of prefabricated buildings is solved, ensuring that the hardened ground can restore its original function after the temporary building is moved.
Patent Information
- Application Number
- CN202422864665.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-25
- Publication Date
- 2025-09-23
- Estimated Expiration
- 2034-11-25
AI Technical Summary
The connection method between traditional buildings and foundations affects the detachability of prefabricated buildings, and the screws of anchor bolts extending from the ground limit the functional changes of the hardened ground.
It adopts a detachable anchoring structure, including mechanical anchor bolts, threaded sleeves and secondary pouring layer. By pre-digging holes in the hardened ground and pouring threaded sleeves, the anchor bolts can be removed to ensure the ground is flat.
The function of the hardened ground was restored after the temporary building was moved, which avoided the ground bulge and met the actual needs of the temporary building project.
Smart Images

Figure CN223373877U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building components, in particular to a detachable anchoring structure for a small temporary building and a hardened ground. Background Art
[0002] In recent years, with the continuous development of prefabricated buildings, the number of small temporary structures such as exhibition halls, experience halls, and post stations has increased. These projects typically require hardened ground, and the site often needs to serve other functions after the temporary structure is moved, such as parking or sports venues.
[0003] Based on the above situation, there is a contradiction between the traditional connection method between buildings and foundations and the flexibility of prefabricated buildings. This is mainly manifested in:
[0004] 1. After the anchor bolts are connected to the structure, secondary pouring is usually required, which seriously affects the disassembly performance of the prefabricated building;
[0005] 2. The screw rod of the anchor bolt will protrude from the ground, which seriously limits the changes in the use function of the hardened ground. Utility Model Content
[0006] The purpose of the utility model is to provide a detachable anchoring structure between a small temporary building and a hardened ground to solve the above-mentioned problem. The fully detachable approach is adopted to ensure that the hardened ground is restored to its original function after the temporary building is moved without affecting the surface flatness of the hardened ground.
[0007] Technical solution: The utility model provides a detachable anchoring structure between a small temporary building and a hardened ground, including: a hardened ground, a mechanical anchor bolt, a threaded sleeve, a secondary pouring layer, and an anchor bolt. The hardened ground is the hard surface layer of the construction site. Anchor holes and secondary pouring holes are dug under the hardened ground. The secondary pouring hole is directly through the ground surface and has an inner diameter larger than the inner diameter of the anchor hole. The mechanical anchor bolt is driven into the hardened ground and set in the anchor hole. The bolt portion above the mechanical anchor bolt protrudes from the anchor hole and enters the secondary pouring hole. The threaded sleeve is sleeved on the mechanical anchor bolt. The secondary pouring layer is poured in the secondary pouring hole, filling the secondary pouring hole and fixing the threaded sleeve. The anchor bolt is set in the threaded sleeve. The secondary pouring process is placed before the installation of the structural components, eliminating the bonding between the secondary pouring and the structural components but retaining the vertical support force. The screw portion of the anchor bolt can be disassembled. After the anchor bolt is disassembled, the hardened ground is flat and has no protrusions. All components are implanted after the hardened ground construction is completed, and there is no need to pre-embed them in advance.
[0008] Furthermore, in the aforementioned detachable anchoring structure for a small temporary structure to hardened ground, the anchor hole and the secondary pouring hole are on the same center line. The anchor hole is drilled downward from the center of the bottom of the secondary pouring hole, and a mechanical anchor bolt is inserted and tightened to generate an anchoring force. This provides horizontal positioning for the threaded sleeve and also provides a portion of the vertical anchoring force for the threaded sleeve.
[0009] Furthermore, in the above-mentioned detachable anchoring structure between a small temporary building and hardened ground, the length of the bolt portion above the mechanical anchor is 1 / 2 the length of the threaded sleeve.
[0010] Furthermore, in the aforementioned detachable anchoring structure for a small temporary building and hardened ground, the threaded sleeve is adjusted in height before the secondary pouring so that the secondary pouring layer and the threaded sleeve are in the same horizontal plane and slightly higher than the highest point of the hardened ground surface. This can correct for possible construction errors in the original site hardened ground surface 1.
[0011] Furthermore, in the above-mentioned detachable anchoring structure between a small temporary building and hardened ground, the secondary pouring layer is cast using cement mortar.
[0012] Furthermore, in the above-mentioned detachable anchoring structure between a small temporary building and a hardened ground, the maximum height of the threaded sleeve after being inserted into the mechanical anchor bolt should be greater than or equal to the surface height of the hardened ground 1.
[0013] It can be seen from the above technical solution that the utility model has the following beneficial effects: the detachable anchoring structure of a small temporary building and a hardened ground described in the utility model provides anchoring of the temporary building and the hardened ground, and adopts a completely detachable approach to ensure that the hardened ground is restored to its original function after the temporary building is moved, without affecting the surface flatness of the hardened ground. Moreover, the detachable anchoring structure does not require pre-embedded components during the construction of the hardened ground, and the completely later implantation method is more in line with the actual situation of temporary construction projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The utility model is a schematic diagram of a detachable anchoring structure of a small temporary building and hardened ground.
[0015] In the figure: hardened ground 1, mechanical anchor bolt 2, threaded sleeve 3, secondary pouring layer 4, anchor bolt 5. DETAILED DESCRIPTION
[0016] Example 1
[0017] like Figure 1The shown embodiment shows a detachable anchoring structure for a small temporary building and a hardened ground, comprising: a hardened ground 1, a mechanical anchor bolt 2, a threaded sleeve 3, a secondary casting layer 4, and an anchor bolt 5. The hardened ground 1 is a hard surface layer of a construction site, and anchor holes and secondary casting holes are dug under the hardened ground 1. The secondary casting hole is directly through the ground surface, and the inner diameter is larger than the inner diameter of the anchor hole. The anchor hole and the secondary casting hole are on the same center line; the mechanical anchor bolt 1 is driven into the hardened ground 1 and arranged in the anchor hole, and the bolt portion above the mechanical anchor bolt 1 protrudes from the anchor hole and enters the secondary casting hole; the threaded sleeve 3 is sleeved on the mechanical anchor bolt 2; the secondary casting layer 4 is cast in the secondary casting hole, filling the secondary casting hole and fixing the threaded sleeve 3; the anchor bolt 5 is arranged in the threaded sleeve 3. The secondary pouring process is placed before the installation of structural components, eliminating the bonding between the secondary pouring and the structural components but retaining the vertical supporting force. The screw part of the anchor bolt 5 can be removed. After removing the anchor bolt 5, the hardened ground is flat and has no protrusions. It consists of an anchor bolt 5, which is screwed into the threaded sleeve 3 to form an anchor connection between the hardened ground 1 and the prefabricated building. The prefabricated building and the anchor bolt 5 are dismantled and moved together.
[0018] In this embodiment, the anchor hole is drilled downward at the center of the bottom of the secondary casting hole, and then a mechanical anchor is placed and tightened to generate anchoring force. On the one hand, it provides horizontal positioning for the threaded sleeve 3, and on the other hand, it provides a part of the vertical anchoring force for the threaded sleeve 3.
[0019] In this embodiment, the height of the threaded sleeve 3 is adjusted before the secondary pouring so that the secondary pouring layer 4 and the threaded sleeve 3 are in the same horizontal plane and slightly higher than the highest point of the hardened ground 1 surface, which can correct possible construction errors in the hardened ground 1 of the original site; the threaded sleeve 3 with adjusted height and the mechanical anchor bolt 2 are cast into an immovable whole, and the size of the pouring area of the secondary pouring layer 4 can be appropriately increased as needed to ensure that reliable support is provided for the upper components, and after the secondary pouring, the ground remains flat without protrusions and does not require trimming, which is conducive to subsequent construction.
[0020] Example 2
[0021] On the basis of Example 1, in this embodiment, as Figure 1 The figure shows a detachable anchoring structure for a small temporary building and hardened ground. The length of the bolt portion above the mechanical anchor 1 is 1 / 2 the length of the threaded sleeve 3. The anchor hole is formed by driving the mechanical anchor 2 directly into the hardened ground 1. All components are implanted after the hardened ground construction is completed, and there is no need to pre-embed them in advance.
[0022] In this embodiment, the maximum height of the threaded sleeve 3 after being inserted into the mechanical anchor 2 should be greater than or equal to the surface height of the hardened ground 1; the length of the bolt portion above the mechanical anchor 1 is 1 / 2 the length of the threaded sleeve 3, ensuring that the threaded sleeve 3 can be adjusted to the ground level.
[0023] In this embodiment, the secondary casting layer 4 is cast using cement mortar.
[0024] It should be noted that the above description is merely a technical solution of the utility model and is not intended to be limiting. Although the utility model has been described in detail with reference to preferred embodiments, those skilled in the art will appreciate that modifications or equivalent substitutions may be made to the technical solution of the utility model without departing from the scope of the technical solution of the utility model, and such modifications or equivalent substitutions shall be encompassed by the claims of the utility model.
Claims
1. A detachable anchoring structure for a small temporary building and hardened ground, characterized by: include: Hardened ground (1), the hardened ground (1) is a hard surface layer of the construction site, anchor holes and secondary pouring holes are dug under the hardened ground (1), the secondary pouring holes are directly connected to the ground surface, and the inner diameter of the holes is larger than the inner diameter of the anchor holes; A mechanical anchor bolt (2), wherein the mechanical anchor bolt (2) is driven into the hardened ground (1) and is arranged in the anchor bolt hole, and the bolt portion above the mechanical anchor bolt (2) protrudes from the anchor bolt hole and enters the secondary casting hole; A threaded sleeve (3), wherein the threaded sleeve (3) is sleeved on the mechanical anchor bolt (2); A secondary pouring layer (4), wherein the secondary pouring layer (4) is poured into the secondary pouring hole, fills the secondary pouring hole, and fixes the threaded sleeve (3); An anchor bolt (5), wherein the anchor bolt (5) is arranged in the threaded sleeve (3).
2. The detachable anchoring structure for a small temporary building and hardened ground according to claim 1, characterized in that: The anchor hole and the secondary casting hole are on the same center line. The anchor hole is drilled downward at the center of the bottom of the secondary casting hole, and then a mechanical anchor bolt (2) is placed in it. After being tightened, an anchoring force is generated.
3. The detachable anchoring structure for a small temporary building and hardened ground according to claim 1, characterized in that: The length of the bolt portion above the mechanical anchor bolt (2) is 1 / 2 the length of the threaded sleeve (3).
4. The detachable anchoring structure for a small temporary building and hardened ground according to claim 1, characterized in that: Before the secondary pouring, the height of the threaded sleeve (3) is adjusted so that the secondary pouring layer (4) and the threaded sleeve (3) are in the same horizontal plane and slightly higher than the highest point of the hardened ground (1).
5. The detachable anchoring structure for a small temporary building and hardened ground according to claim 1, characterized in that: The secondary pouring layer (4) is poured using cement mortar.
6. The detachable anchoring structure for a small temporary building and hardened ground according to claim 1, characterized in that: After the threaded sleeve (3) is inserted into the mechanical anchor bolt (2), the maximum height thereof should be greater than or equal to the surface height of the hardened ground (1).