Combined gallery bridge device additionally provided with elevators

By dividing the corridor bridge structure into multiple modular units and connecting them with bolts, the problem of inconvenient installation caused by inconsistent pit lengths after adding elevators to old residential areas was solved, achieving the effect of flexible combination and reuse.

CN223523240UActive Publication Date: 2025-11-07SMAIP ELEVATOR (CHINA) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422906012.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-27
Publication Date
2025-11-07
Estimated Expiration
2034-11-27

AI Technical Summary

Technical Problem

After elevators are installed in old residential communities, a foundation pit is formed in the middle of the road from the entrance of the unit. The length of the foundation pit varies, which makes it inconvenient to install the traditional integrated corridor bridge structure and affects the installation efficiency.

Method used

The corridor bridge structure is divided into four modular groups, including the first, second, third and fourth corridor bridge blocks. Each block has the same width but different lengths. They are connected by bolts to accommodate different foundation pit lengths and are assembled using bolt fixing.

Benefits of technology

It enables flexible combinations based on different pit lengths, improving installation convenience, and each component can be reused, saving costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223523240U_ABST
    Figure CN223523240U_ABST
Patent Text Reader

Abstract

The utility model discloses a combined gallery bridge device additionally provided with an elevator, relates to the technical field of gallery bridges, and aims to solve the problems that a foundation pit is formed from a home-entry unit door to the middle position of an outdoor road after a foundation is excavated by additionally arranging the elevator in the prior art, and construction sites corresponding to the length of the foundation pit are not the same; the problems that a traditional integrated gallery bridge structure is inconvenient to install, the installation efficiency is affected, and use is inconvenient are solved. The combined gallery bridge comprises a first gallery bridge combination block, a second gallery bridge combination block, a third gallery bridge combination block and a fourth gallery bridge combination block, and the first gallery bridge combination block, the second gallery bridge combination block, the third gallery bridge combination block and the fourth gallery bridge combination block are of gallery bridge structures with the same width and different lengths. The first gallery bridge combination block and the second gallery bridge combination block are fixedly connected through bolts, the second gallery bridge combination block and the third gallery bridge combination block are fixedly connected through bolts, and the third gallery bridge combination block and the fourth gallery bridge combination block are fixedly connected through bolts.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to a gallery bridge technical field, concretely is a kind of combined gallery bridge device of installing elevator. BACKGROUND

[0002] At present, in the reconstruction of old community, elevator needs to be installed to community building, so that personnel use is more convenient, in the installation of elevator of old community residential building, the gallery bridge for walking has full package and half package, full package generally adopts steel structure and glass protection, can shield rainwater;

[0003] For example, the gallery bridge structure for installing elevator of old community residential building with the announcement number CN218813121U, including underframe, handrail frame and inclined rain shield, further including gauze, torsion spring and metal ring, the underframe top is welded and connected with the pedal, the underframe top two sides are welded and connected with handrail frame, the handrail frame top is installed with upper baffle by bolt, the upper baffle two sides are welded and connected with inclined rain shield, the inclined rain shield bottom is installed with winding box by bolt, the winding box is rotatably connected with the rotating rod in bearing, the rotating rod is wound with gauze, the gauze one end is installed and connected with the rotating rod by bolt;

[0004] The gallery bridge structure for installing elevator of old community residential building of above-mentioned application is high in stable efficiency, has the auxiliary component of light weight rain and dust shielding, low cost, simple to use, has the flexible winding storage assembly, greatly increases the flexibility of use, has higher practicality, but after the foundation of installing elevator is excavated, the foundation pit is formed at the position between the entrance unit door and outdoor road, the length of foundation pit is not much different for each construction site, it is very inconvenient to install using traditional integral gallery bridge structure, affects installation efficiency, is inconvenient to use, therefore market urgently needs to develop a kind of combined gallery bridge device of installing elevator to help people solve existing problems. UTILITY MODEL CONTENTS

[0005] The utility model is to provide a kind of combined gallery bridge device of installing elevator, to solve the problem that the foundation pit is formed at the position between the entrance unit door and outdoor road after the foundation of installing elevator is excavated, the length of foundation pit is not much different for each construction site, it is very inconvenient to install using traditional integral gallery bridge structure, affects installation efficiency, is inconvenient to use.

[0006] To achieve the above object, the utility model provides the following technical scheme: A kind of combined gallery bridge device of installing elevator, including combined gallery bridge, the combined gallery bridge includes first gallery bridge combination block, second gallery bridge combination block, third gallery bridge combination block and fourth gallery bridge combination block, the first gallery bridge combination block, second gallery bridge combination block, third gallery bridge combination block and fourth gallery bridge combination block are respectively gallery bridge structure of same width, different length, the first gallery bridge combination block is connected by bolt fixing with second gallery bridge combination block, the second gallery bridge combination block is connected by bolt fixing with third gallery bridge combination block, the third gallery bridge combination block is connected by bolt fixing with fourth gallery bridge combination block.

[0007] Through the above technical scheme, the traditional integrated gallery bridge structure is divided into first gallery bridge combination block, second gallery bridge combination block, third gallery bridge combination block and fourth gallery bridge combination block four groups of combination modules, the first gallery bridge combination block, second gallery bridge combination block, third gallery bridge combination block and fourth gallery bridge combination block are respectively gallery bridge structure of same width, different length, bolt is used to be connected and fixed mutually during installation, and each two modules can be combined and used mutually, and can be combined and used according to different foundation pit length, to meet different situations, and it is more convenient to use.

[0008] In a preferred example, the utility model can be further configured as: the first gallery bridge combination block is installed with first guardrail, the second gallery bridge combination block is installed with second guardrail, the third gallery bridge combination block is installed with third guardrail, and the fourth gallery bridge combination block is installed with fourth guardrail.

[0009] Through the above technical scheme, gallery bridge combination block, guardrail and other components are all assembled by bolt connection and fixed mode, which is convenient for on-site disassembly and can be reused to save manufacturing cost.

[0010] In a preferred example, the utility model can be further configured as: one side of the first gallery bridge combination block is installed with a house entrance door slope.

[0011] In a preferred example, the utility model can be further configured as: one side of the fourth gallery bridge combination block is installed with a step, and the step is installed with a fifth guardrail.

[0012] Compared with the prior art, the utility model has the beneficial effects that:

[0013] 1. The utility model discloses a traditional integral type corridor bridge structure is divided into first corridor bridge combination block, second corridor bridge combination block, third corridor bridge combination block and fourth corridor bridge combination block four groups of combination module, first corridor bridge combination block, second corridor bridge combination block, third corridor bridge combination block and fourth corridor bridge combination block are the corridor bridge structure of same width, length difference, when installing adopt bolt interconnection fixed, every two module can be mutually combined and used, can be combined and used according to different foundation pit length to satisfy different situations, it is more convenient to use.

[0014] 2. The utility model discloses a corridor bridge combination block, guardrail etc. all adopt bolt connection fixed mode and assemble, convenient on -site dismounting, and can repeatedly use and save manufacturing cost. DRAWINGS

[0015] Figure 1 It is the whole schematic diagram of a combined corridor bridge device of installing elevator of the utility model.

[0016] In the drawing: 1, combined corridor bridge, 2, first corridor bridge combination block, 3, second corridor bridge combination block, 4, third corridor bridge combination block, 5, fourth corridor bridge combination block, 6, first guardrail, 7, second guardrail, 8, third guardrail, 9, fourth guardrail, 10, step, 11, fifth guardrail, 12, house door slope. DETAILED DESCRIPTION

[0017] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model, and obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments.

[0018] In the description of the present application, it needs to be explained that the orientation or position relationship indicated by the terms "upper", "lower", "inner", "outer", "top / bottom end" and the like is the orientation or position relationship shown based on the drawings, and is only for the convenience of describing the present application and simplifying the description, and is not indicative or suggestive of the device or element indicated must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second" are only for the purpose of description, and cannot be understood as indicative or suggestive of relative importance.

[0019] In the description of the present application, it needs to be explained that, unless otherwise explicitly specified and limited, the terms "mounting", "provided with", "sleeved / connected", "connected" and the like should be understood broadly, for example, "connected" can be fixed connection, can also be detachable connection, or integrally connected, can be mechanical connection, can also be electrical connection, can be directly connected, can also be indirectly connected through an intermediate medium, can be the communication inside two elements. For ordinary skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0020] Referring to Figure 1 The utility model provides a kind of embodiment provided by the utility model: a kind of combined gallery bridge device of installing elevator, including combined gallery bridge 1, combined gallery bridge 1 includes first gallery bridge combination block 2, second gallery bridge combination block 3, third gallery bridge combination block 4 and fourth gallery bridge combination block 5, first gallery bridge combination block 2, second gallery bridge combination block 3, third gallery bridge combination block 4 and fourth gallery bridge combination block 5 are respectively the gallery bridge structure of same width, different length, first gallery bridge combination block 2 is connected by bolt fixing with second gallery bridge combination block 3, second gallery bridge combination block 3 is connected by bolt fixing with third gallery bridge combination block 4, third gallery bridge combination block 4 is connected by bolt fixing with fourth gallery bridge combination block 5.

[0021] Referring to Figure 1 First guardrail 6 is installed on first gallery bridge combination block 2, second guardrail 7 is installed on second gallery bridge combination block 3, first guardrail 6 is connected by bolt fixing with first gallery bridge combination block 2, second guardrail 7 is connected by bolt fixing with second gallery bridge combination block 3.

[0022] Referring to Figure 1 Third guardrail 8 is installed on third gallery bridge combination block 4, fourth guardrail 9 is installed on fourth gallery bridge combination block 5, third guardrail 8 is connected by bolt fixing with third gallery bridge combination block 4, fourth guardrail 9 is connected by bolt fixing with fourth gallery bridge combination block 5.

[0023] Referring to Figure 1 One side of first gallery bridge combination block 2 is installed with house door slope 12, and house door slope 12 is connected by bolt fixing with first gallery bridge combination block 2.

[0024] Referring to Figure 1 One side of fourth gallery bridge combination block 5 is installed with step 10, and fifth guardrail 11 is installed on step 10, and step 10 is connected by bolt fixing with fourth gallery bridge combination block 5, and fifth guardrail 11 is connected by bolt fixing with step 10.

[0025] Working principle: when using, overall gallery bridge is formed by first gallery bridge combination block 2, second gallery bridge combination block 3, third gallery bridge combination block 4 and fourth gallery bridge combination block 5, first gallery bridge combination block 2 is connected by bolt fixing with second gallery bridge combination block 3, second gallery bridge combination block 3 is connected by bolt fixing with third gallery bridge combination block 4, third gallery bridge combination block 4 is connected by bolt fixing with fourth gallery bridge combination block 5, and first guardrail 6, second guardrail 7, third guardrail 8 and fourth guardrail 9 of same length are installed on the top of first gallery bridge combination block 2, second gallery bridge combination block 3, third gallery bridge combination block 4 and fourth gallery bridge combination block 5 correspond, bolt is also fixed simultaneously, step 10 is set in outdoor end, and guardrail is also installed on step 10, and house door slope 12 is set in unit house door.

[0026] It will be apparent to those skilled in the art that the application is not limited to the details of the above-exemplified embodiments and that the application can be implemented in other particular forms without departing from the spirit or essential characteristics of the application. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. No feature of the application is considered critical unless it is expressly stated in the claims.

Claims

1. A retrofitted elevator combined gallery bridge device comprising a combined gallery bridge (1), characterized in that: The combined gallery bridge (1) comprises a first gallery bridge combined block (2), a second gallery bridge combined block (3), a third gallery bridge combined block (4) and a fourth gallery bridge combined block (5), the first gallery bridge combined block (2), the second gallery bridge combined block (3), the third gallery bridge combined block (4) and the fourth gallery bridge combined block (5) are gallery bridge structures with the same width and different lengths, the first gallery bridge combined block (2) is fixedly connected with the second gallery bridge combined block (3) through bolts, the second gallery bridge combined block (3) is fixedly connected with the third gallery bridge combined block (4) through bolts, and the third gallery bridge combined block (4) is fixedly connected with the fourth gallery bridge combined block (5) through bolts.

2. A combined gallery bridge device with a retrofitted elevator according to claim 1, characterized in that: A first guardrail (6) is installed on the first gallery bridge combined block (2), and a second guardrail (7) is installed on the second gallery bridge combined block (3).

3. A combined gallery bridge device with a retrofitted elevator according to claim 1, characterized in that: A third guardrail (8) is installed on the third gallery bridge combined block (4), and a fourth guardrail (9) is installed on the fourth gallery bridge combined block (5).

4. A combined gallery bridge device with a retrofitted elevator according to claim 1, characterized in that: A house entrance door slope (12) is installed on one side of the first gallery bridge combined block (2).

5. A combined gallery bridge device with a retrofitted elevator according to claim 1, characterized in that: A step (10) is installed on one side of the fourth gallery bridge combined block (5), and a fifth guardrail (11) is installed on the step (10).