Building material unloading device for building construction
By combining an electric push rod with a cleaning mechanism, the problems of height adjustment and limit setting of the unloading device are solved, thereby improving unloading efficiency and cleaning effect.
Patent Information
- Application Number
- CN202423092476.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-12-16
AI Technical Summary
The existing unloading device is cumbersome and time-consuming to adjust the height of the discharge end, and lacks the ability to limit the building materials, which leads to material slippage and leakage of impurities, affecting the unloading efficiency.
The height of the mounting plate is adjusted by an electric push rod, combined with a limit strip and a cleaning mechanism (nylon brush, collection box, filter plate) to achieve automated height adjustment and cleaning, preventing material slippage and impurity adhesion.
The automated height adjustment and cleaning of the unloading device have been achieved, which improves unloading efficiency and prevents material slippage and impurities from obstructing the conveying process.
Smart Images

Figure CN223560404U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building construction technical field especially relates to a building material unloading device of building construction. BACKGROUND
[0002] Building material is used for building various materials of building and its accessory facilities, plays a vital role in building structure, decoration, thermal insulation, waterproof etc., when needing to transport or stack building material, usually utilizes unloading device to complete, adjusts the material outlet end of conveying assembly to proper height, can shorten the stacking time of material, when needing to adjust the conveying height of material outlet end of unloading device, needs manual adjustment of operating personnel, and the operation is complicated and time -consuming and laborsaving, and the building material is short of spacing on the conveying belt, and the building material can slip in the transportation process, and the building material can have impurities or parts leak, these impurities or parts can be adhered on the conveying belt, will hinder normal conveying, influence building material unloading efficiency.
[0003] In view of the above problem, the building material unloading device of building construction is developed. UTILITY MODEL CONTENTS
[0004] In order to overcome the shortcoming that when needing to adjust the conveying height of material outlet end of unloading device, needing manual adjustment of operating personnel, operation is complicated and time -consuming and laborsaving, and the building material is short of spacing on the conveying belt, and the building material can slip in the transportation process, and the building material can have impurities or parts leak, these impurities or parts can be adhered on the conveying belt, will hinder normal conveying, influence building material unloading efficiency, the utility model provides a building material unloading device of building construction.
[0005] The utility model discloses a building material unloading device of building construction, including installation board, the installation board has 2, the left part of installation board is connected with the installation base, the installation base supports adjacent installation board, and the right part of rear installation board places electric push rod, and the telescopic end of electric push rod is rotatablely connected with the right part of rear installation board, and the right part of front installation board is connected with the guide rod, and the left side of installation board places the mounting seat, and the drive assembly is installed between mounting seat and installation board, and the drive assembly is equipped with the conveying belt, and the lower side of the right part of conveying belt places the collection box, and the front and rear sides of collection box are connected with first mounting piece, and the second mounting piece is connected on first mounting piece, and the torsional spring is connected on second mounting piece, and the nylon brush is rotatablely connected between two second mounting pieces, and the drawing frame is slidably connected on collection box, and two guide grooves are formed in the left and right two parts of drawing frame.
[0006] Further, the filter mechanism is also included, which comprises a filter plate, the filter plate is slidably connected to the material extraction frame, inward handles are arranged on the left and right sides of the filter plate, two protrusions are connected to the left and right sides of the filter plate, and the protrusions are slidably connected to the corresponding guide grooves.
[0007] Further, the electric push rod can drive the right part of the adjacent mounting plate to be lifted up.
[0008] Further, the left part of the mounting seat is in a slope structure, so that the building materials can be placed on the conveying belt.
[0009] Further, a plurality of limiting strips are connected to the conveying belt.
[0010] Further, a handle is arranged on the material extraction frame, and an anti-skid sleeve is arranged on the handle.
[0011] By adopting the above technical scheme, the utility model has the following advantages:
[0012] The utility model discloses a kind of building material conveying devices, including mounting seat, mounting plate, drive component, conveying belt, electric push rod, mounting base, cleaning mechanism, filter mechanism and guide rod, the right part of the adjacent mounting plate is lifted up or lowered by electric push rod, 2 right parts of mounting plate are adjusted to appropriate height, so that conveying belt is adjusted to appropriate height, to meet the actual conveying demand of building material, limiting strip is positioned to building material, prevent building material from sliding in transport process, cleaning mechanism is cleaned by nylon brush impurity on conveying belt, and impurity or part is collected by collecting tank, filter mechanism is filtered to the impurity or part in collecting tank, so that impurity and part are collected. BRIEF DESCRIPTION OF DRAWINGS
[0013] Figure 1 It is the three-dimensional structure schematic diagram of the utility model.
[0014] Figure 2 It is the partial section three-dimensional structure schematic diagram of the cleaning mechanism of the utility model.
[0015] Figure 3 It is the three-dimensional structure schematic diagram of the cleaning mechanism of the utility model.
[0016] Figure 4 It is the three-dimensional structure schematic diagram of the filter mechanism of the utility model.
[0017] In the above drawing: 1: mounting seat, 2: mounting plate, 3: drive component, 4: conveying belt, 5: electric push rod, 6: mounting base, 7: cleaning mechanism, 71: collecting tank, 72: first mounting piece, 73: second mounting piece, 74: nylon brush, 75: material extraction frame, 8: filter mechanism, 81: filter plate, 82: inward handle, 83: protrusion, 9: guide rod. DETAILED DESCRIPTION
[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0019] A building material unloading device for construction, such as Figures 1-3 As shown, the system includes two mounting plates 2. Each mounting plate 2 has a mounting base 6 connected to its left side, supporting adjacent mounting plates 2. An electric push rod 5 is placed on the right side of the rear mounting plate 2, capable of lifting the right side of the adjacent mounting plate 2. The telescopic end of the electric push rod 5 is rotatably connected to the right side of the rear mounting plate 2. A guide rod 9 is connected to the right side of the front mounting plate 2. A mounting seat 1 is placed on the left side of the mounting plate 2, with a sloping left side to facilitate the loading of building materials onto the conveyor belt 4. A drive assembly 3 is installed between the mounting seat 1 and the mounting plate 2, and a mounting element is fitted onto the drive assembly 3. The conveyor belt 4 is connected to several limit strips. A cleaning mechanism 7 is set between the lower parts of the two mounting plates 2. The cleaning mechanism 7 includes a collection box 71. The collection box 71 is placed on the lower right side of the conveyor belt 4. The collection box 71 is connected to the front and rear sides of the front and rear sides. The first mounting parts 72 are connected to the first mounting parts 72. The second mounting parts 73 are connected to the second mounting parts 73. The two second mounting parts 73 are rotatably connected to the 2 second mounting parts 73. The collection box 71 is slidably connected to the material extraction frame 75. The material extraction frame 75 has two guide grooves on the left and right sides. The material extraction frame 75 is equipped with a handle and an anti-slip sleeve.
[0020] like Figure 1 and Figure 4 As shown, it also includes a filtering mechanism 8, which includes a filter plate 81. The filter plate 81 is slidably connected to the material extraction frame 75. The filter plate 81 is provided with inward handles 82 on both the left and right sides. The filter plate 81 is connected to two protrusions 83 on both the left and right sides. The protrusions 83 are slidably connected to the corresponding guide grooves.
[0021] It should be noted that the building material is used for building various materials of buildings and its auxiliary facilities, plays a crucial role in building structure, decoration, insulation, waterproofing, etc., when the building material needs to be transported or stacked, usually using the unloading device to complete, first moving the device to the position where unloading and stacking is needed, and then starting the electric push rod 5, the extension end of the electric push rod 5 drives the adjacent mounting plate 2 right part to lift or drop, and then the two mounting plates 2 right parts are adjusted to the appropriate height, and then the driving assembly 3 is started, the driving assembly 3 drives the conveyor belt 4 to move, then the building material is placed between the limiting strips on the conveyor belt 4, the limiting strips can limit the building material to prevent the building material from falling during transportation, the building material may have impurities or parts leaking out, the impurities or parts adhered to the conveyor belt 4 will hinder normal conveying and affect the building material unloading efficiency, the conveyor belt 4 needs to be cleaned, with the continuous movement of the conveyor belt 4, the nylon brush 74 brushes off the impurities remaining on the conveyor belt 4, when the nylon brush 74 contacts the limiting strip on the conveyor belt 4, the limiting strip will extrude the nylon brush 74, so that the nylon brush 74 rotates, when the limiting strip passes through the nylon brush 74, under the action of the torsional spring, the nylon brush 74 resets, thereby continuing to clean the conveyor belt 4, the impurities or parts after brushing will fall into the material extraction frame 75 for collection, the filter plate 81 filters the impurities and parts, so that the parts seep out, the impurities fall to the bottom of the material extraction frame 75, and then the material extraction frame 75 is pulled out, and the filter plate 81 is taken out upwardly by the inward handle 82, so as to collect the impurities and parts.
[0022] The above is only a specific embodiment of the present application, but the protection scope of the present application is not limited thereto, any skilled person in the art can easily think of changes or replacements within the technical range disclosed by the present application, which should be covered within the protection scope of the present application. Therefore, the protection scope of the present application should be subject to the protection scope of the claims.
Claims
1. A building material unloading device for a building construction, characterized by, Including installation plate (2), the installation plate (2) has 2, the left part of installation plate (2) is connected with installation base (6), the installation base (6) supports adjacent installation plate (2), the right part of rear installation plate (2) places electric push rod (5), the telescopic end of electric push rod (5) is rotatably connected with the right part of rear installation plate (2), the right part of front installation plate (2) is connected with guide rod (9), the left side of installation plate (2) places mounting seat (1), drive assembly (3) is installed between mounting seat (1) and installation plate (2), drive assembly (3) is sleeved with conveying belt (4), the lower part between two installation plate (2) is provided with cleaning mechanism (7), cleaning mechanism (7) includes material collecting box (71), the right lower side of conveying belt (4) places material collecting box (71), the front and rear sides of material collecting box (71) are connected with first mounting piece (72), the second mounting piece (73) is connected on first mounting piece (72), torsional spring is connected on second mounting piece (73), nylon brush (74) is rotatably connected between two second mounting pieces (73), material collecting box (71) is slidably connected with material extracting frame (75), two guide grooves are formed in the left and right sides of material extracting frame (75).
2. A building material unloading device for a building construction according to claim 1, characterized in that, It also includes filter mechanism (8), the filter mechanism (8) includes filter plate (81), the filter plate (81) is slidably connected on material extracting frame (75), the left and right sides of filter plate (81) are provided with inward handle (82), the left and right sides of filter plate (81) are connected with two protrusions (83), the protrusions (83) are slidably connected with corresponding guide grooves.
3. A building material unloading device for a building construction according to claim 1, characterized in that, The electric push rod (5) can drive the right part of adjacent installation plate (2) to lift up.
4. A building material unloading device for a building construction according to claim 1, characterized in that, The left part of mounting seat (1) is inclined surface structure, which facilitates the building materials to be put on the conveying belt (4).
5. A building material unloading device for a building construction according to claim 1, wherein The conveying belt (4) is connected with a plurality of limiting strips.
6. A building material unloading device for a building construction according to claim 1, wherein The handle is provided on the material extracting frame (75), and the anti-skid sleeve is provided on the handle.