Building hanging bracket for fabricated building
By setting positioning through holes and supporting base plates on the hanger, the problem of materials being suspended in the air during the hoisting of prefabricated buildings is solved, and the stable hoisting of materials and prevention of spillage are achieved.
Patent Information
- Application Number
- CN202423054041.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-11
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-12-11
AI Technical Summary
When using common prefabricated building scaffolds to lift prefabricated building materials, the bottom of the materials is suspended in the air, resulting in high pressure on the hooks and easy spillage of small materials.
A hanger was designed with a positioning through hole at the top, through which a connecting screw passes and fixes the support base plate. The bottom is equipped with casters and hooks. The screw is locked with a nut, and the height of the support base plate is adjusted to support the bottom of the material and prevent it from falling.
It effectively supports the bottom of the material, prevents the material from spilling during hoisting, reduces hook pressure, and improves hoisting stability.
Smart Images

Figure CN223561098U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building hanger technical field, concretely is a building hanger for assembly type building. BACKGROUND
[0002] The assembly type building is with the component factory prefabricated production, the scene assembly type installation mode, with the standardization design, the factory production, the assembly construction, the integrated decoration and the information management features, integrates from the research and development design, the production and manufacture, the scene assembly etc. Each business field, realizes the building product energy conservation, the environmental protection, the whole cycle value maximization sustainable development's new type building production mode, its most basic component part is: base, column, beam, floor, stair etc. Several main parts.
[0003] When installing the assembly type building, usually uses the building hanger to hoist, and the building hanger is a kind of equipment for suspending and lifting object, usually by hook, rope or chain and suspension device is formed, and the building hanger is mainly used for hoisting heavy equipment, carrying goods, installing lamps and lanterns etc. It pays more attention to providing the function of suspension and lifting.
[0004] Common building hanger for assembly type building, when hoisting assembly type building material, usually uses hook to hoist building material, but, such hoisting mode, the bottom of building material is suspended, the pressure on hook is larger, and some fine building materials are easy to spill when hoisting, in view of this, the application provides a building hanger for assembly type building. UTILITY MODEL CONTENTS
[0005] In view of the defects of the prior art, the utility model provides a building hanger for assembly type building, which has the advantages of supporting the bottom of building material during hoisting, and solves the problem of common building hanger for assembly type building, which is usually used to hoist building material with hook, but the bottom of building material is suspended, the pressure on hook is larger, and some fine building materials are easy to spill when hoisting.
[0006] To achieve the above object, the utility model provides the following technical scheme: a building hanger for assembly type building, comprising a hanger, positioning through holes are formed at the top of the hanger at four corners, a connecting screw is arranged through the positioning through hole of the hanger, a supporting bottom plate is fixedly installed at the bottom of the connecting screw, a connecting nut is threadedly installed on the surface of the connecting screw, the connecting nut is located at the top of the hanger, and a moving bottom wheel is rotatably installed at the bottom of the supporting bottom plate through a wheel frame at four corners.
[0007] Further, four connecting lifting rings are fixedly installed at the top of the hanger, and a lifting rope is arranged through the connecting lifting ring.
[0008] Further, the top end of the hoisting rope is sleeved with a top lifting ring, and a connecting block is fixedly installed on the top of the top lifting ring.
[0009] Further, the bottom of the lifting frame is fixedly installed with two inner mounting plates, and the bottom of the lifting frame is fixedly installed with two outer mounting plates.
[0010] Further, two sliding rods are fixedly installed between the inner mounting plates and the outer mounting plates, and an adjusting block is slidingly installed on the surface of the sliding rod.
[0011] Further, the bottom of the adjusting block is fixedly installed with a mounting hoisting rope, and a hook is fixedly installed at the bottom end of the mounting hoisting rope.
[0012] Further, an adjusting screw is rotatably installed between the inner mounting plates and the outer mounting plates, the adjusting screw is in threaded connection with the adjusting block, one end of the adjusting screw is fixedly connected with a rotating disc rotatably installed on one side of the outer mounting plate away from the other outer mounting plate, and a crank handle is rotatably installed on one side of the rotating disc.
[0013] Compared with the prior art, the building lifting frame for fabricated buildings has the following beneficial effects:
[0014] The building lifting frame for fabricated buildings has the following beneficial effects: BRIEF DESCRIPTION OF DRAWINGS
[0015] Fig. 1 It is a structural schematic view of the utility model;
[0016] Fig. 2 It is a structural side view of the utility model;
[0017] Fig. 3 It is a structural bottom view of the utility model;
[0018] Fig. 4 It is a three-dimensional view of the support bottom plate of the utility model.
[0019] In the figure: 1, the hanger; 2, positioning through hole; 3, connecting screw; 4, support bottom plate; 5, connecting nut; 6, moving bottom wheel; 7, connecting lifting ring; 8, lifting rope; 9, top lifting ring; 10, connecting block; 11, inner side mounting plate; 12, outer side mounting plate; 13, sliding rod; 14, adjusting block; 15, mounting lifting rope; 16, hook; 17, adjusting screw; 18, turntable; 19, crank handle. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.
[0021] Please refer to Figs. 1 to 4 A building hanger for fabricated building, including hanger 1, the top four corners of hanger 1 are provided with positioning through hole 2, connecting screw 3 is arranged in positioning through hole 2 of hanger 1, support bottom plate 4 is fixedly installed at the bottom of connecting screw 3, connecting nut 5 is screw-mounted on the surface of connecting screw 3, connecting nut 5 is located at the top of hanger 1, and moving bottom wheel 6 is rotatably installed at the bottom four corners of support bottom plate 4 through wheel frame. Through moving bottom wheel 6, support bottom plate 4 is moved below hanger 1, connecting screw 3 is aligned with positioning through hole 2, then hanger 1 is lowered, so that connecting screw 3 passes through positioning through hole 2 and is locked through connecting nut 5.
[0022] Meanwhile, four connecting lifting rings 7 are fixedly installed at the top of hanger 1, and lifting rope 8 is arranged in connecting lifting ring 7.
[0023] The top end of lifting rope 8 is sleeved with top lifting ring 9, and connecting block 10 is fixedly installed at the top of top lifting ring 9. The connecting block 10 is lifted and lowered by hoisting equipment, hanger 1 is lifted and lowered through lifting rope 8, and lifting rope 8 is connected through connecting lifting ring 7 and top lifting ring 9 at both ends.
[0024] Meanwhile, two inner side mounting plates 11 are fixedly installed at the bottom of hanger 1, and two outer side mounting plates 12 are fixedly installed at the bottom of hanger 1.
[0025] The two sliding rods 13 are fixedly installed between inner side mounting plate 11 and outer side mounting plate 12, and the adjusting block 14 is slidingly installed on the surface of sliding rod 13.
[0026] Secondly, the bottom of the adjusting block 14 is fixedly installed with the installation lifting rope 15, and the bottom end of the installation lifting rope 15 is fixedly installed with the hook 16. The adjusting block 14 moves on the surface of the sliding rod 13, drives the installation lifting rope 15 to move, drives the hook 16 to move, adjusts the position of the hook 16, and connects the building materials of the fabricated building through the hook 16, and hoists the building materials of the building through the hoisting equipment.
[0027] Finally, the adjusting screw 17 is rotatably installed between the inner mounting plate 11 and the outer mounting plate 12, the adjusting screw 17 is in threaded connection with the adjusting block 14, the two outer mounting plates 12 are rotatably installed with the turntable 18 on the sides away from each other, the turntable 18 is fixedly connected with one end of the adjusting screw 17, and the turntable 18 is rotatably installed with the crank 19 on one side. When hoisting, the crank 19 is used to control the rotation of the turntable 18, the rotation of the adjusting screw 17, the movement of the adjusting block 14, the movement of the hook 16, and the adjustment of the position of the hook 16, so that different materials are hoisted conveniently.
[0028] In use, the crank 19 is used to control the rotation of the turntable 18, the rotation of the adjusting screw 17, the movement of the adjusting block 14, the movement of the hook 16, the adjustment of the hook 16 to the appropriate position, the hoisting and lowering of the connecting block 10 through the hoisting equipment, the hoisting and lowering of the lifting frame 1 through the lifting rope 8, the hoisting and lowering of the materials through the hook 16, the movement of the supporting bottom plate 4 to the position below the lifting frame 1 through the movement of the bottom wheel 6 after the materials are hoisted, the alignment of the connecting screw 3 with the positioning through hole 2, and then the lowering of the lifting frame 1, so that the connecting screw 3 passes through the positioning through hole 2, the bottom of the materials is in contact with the supporting bottom plate 4, the connecting nut 5 is locked, the supporting bottom plate 4 supports the bottom of the materials, the materials are protected during hoisting, and the materials are prevented from falling.
[0029] It should be noted that, in the present document, the terms such as first and second, etc. are merely used to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "contain" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements not only includes those elements, but also includes other elements not explicitly listed or inherent to such process, method, article or equipment. Without more limitations, the element defined by the statement "including a" does not exclude the presence of other identical elements in the process, method, article or equipment including the element.
[0030] Although the embodiments of the present application have been shown and described, it is to be understood that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present application, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A building hanger for prefabricated buildings, comprising a hanger (1), characterized in that: The top four corners of the hanger (1) are provided with positioning through holes (2), and connecting screws (3) are inserted through the positioning through holes (2) of the hanger (1). A support base plate (4) is fixedly installed at the bottom of the connecting screw (3). A connecting nut (5) is threaded on the surface of the connecting screw (3). The connecting nut (5) is located at the top of the hanger (1). The bottom four corners of the support base plate (4) are all equipped with movable bottom wheels (6) through wheel frames.
2. The prefabricated building hanging frame according to claim 1, characterized in that: The top of the hanger (1) is fixedly equipped with four connecting rings (7), and a lifting rope (8) is threaded through the inside of the connecting rings (7).
3. A prefabricated building scaffolding according to claim 2, characterized in that: The top end of the lifting rope (8) is fitted with a top lifting ring (9), and a connecting block (10) is fixedly installed on the top of the top lifting ring (9).
4. A prefabricated building scaffolding according to claim 1, characterized in that: The bottom of the hanger (1) is fixedly equipped with two inner mounting plates (11) and two outer mounting plates (12).
5. A prefabricated building hanging frame according to claim 4, characterized in that: Two slide rods (13) are fixedly installed between the inner mounting plate (11) and the outer mounting plate (12), and an adjusting block (14) is slidably installed on the surface of the slide rods (13).
6. A prefabricated building hanging frame according to claim 5, characterized in that: The bottom of the adjusting block (14) is fixedly equipped with a lifting rope (15), and the bottom end of the lifting rope (15) is fixedly equipped with a hook (16).
7. A prefabricated building hanging frame according to claim 5, characterized in that: An adjusting screw (17) is rotatably installed between the inner mounting plate (11) and the outer mounting plate (12). The adjusting screw (17) is threadedly connected to the adjusting block (14). A turntable (18) is rotatably installed on the side of the two outer mounting plates (12) that are far apart from each other. The turntable (18) is fixedly connected to one end of the adjusting screw (17). A crank handle (19) is rotatably installed on one side of the turntable (18).