Cantilever hanging basket for bridge construction

By symmetrically installing guide rails and reinforcing components, combined with gear transmission and motor drive, the problems of cumbersome installation, difficult disassembly, and poor stability of hanging baskets in existing technologies have been solved, realizing efficient and stable movement of cantilever hanging baskets in bridge construction.

CN223562036UActive Publication Date: 2025-11-18THE FOURTH CIVIL ENG CO LTD OF CREC SHANGHAI GRP +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423161874.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-20
Publication Date
2025-11-18
Estimated Expiration
2034-12-20

AI Technical Summary

Technical Problem

The existing cantilever formwork for bridge construction has complicated guide rail installation, is difficult to disassemble, and the formwork itself is not easy to disassemble, has poor stability, and is easily damaged, resulting in low work efficiency and low practicality.

Method used

The basket body is quickly installed and removed using symmetrically installed guide rails and reinforcement components, combined with gear transmission and motor drive. It utilizes a hexagonal turntable and threaded rod, and improves movement stability by using dual-sided gear synchronous drive.

Benefits of technology

It enables quick installation and disassembly of the hanging basket body, improving work efficiency and enhancing the stability and service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223562036U_ABST
    Figure CN223562036U_ABST
Patent Text Reader

Abstract

The utility model discloses a cantilever hanging basket for bridge construction, which belongs to the technical field of beam cantilever casting and comprises a first pier and a second pier, guide rails are symmetrically mounted between the first pier and the second pier, a first sliding groove is arranged at the top end of each guide rail, a first sliding block is mounted in each first sliding groove in a sliding manner, and a second sliding block is mounted in each first sliding groove. A hanging basket body is fixedly installed at the top ends of the two first sliding blocks jointly, supporting blocks are symmetrically and fixedly installed on the outer side of the hanging basket body, a first rotating shaft is rotatably installed on the sides, away from each other, of the two supporting blocks, a first gear is fixedly installed at one end of the first rotating shaft, and a rack is fixedly installed at the bottom end of a guide rail; according to the device, rapid mounting and dismounting are facilitated, the working efficiency is improved, meanwhile, the hanging basket body is synchronously driven by the two sides to move, the stability is higher, and therefore the service life of the device is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to beam cantilever pouring technical field, specifically, relate to a bridge construction cantilever hanging basket. BACKGROUND

[0002] At present, the hanging basket of beam cantilever pouring can pour the cantilever beam when building the bridge, can accelerate the construction speed of the bridge, can guarantee the quality of bridge construction through the use of hanging basket while improving the speed, and is widely applied.

[0003] In the prior art, the hanging basket for continuous beam cantilever pouring with the application number CN202223322383.3 comprises a first pier and a second pier, the first pier and the second pier are fixedly connected with a first guide rail on one side, the first pier and the second pier are fixedly connected with a second guide rail on the other side, the top of the second guide rail is fixedly connected with a fixed clamping tooth, the inner side of the first guide rail and the second guide rail is movably connected with a movable hanging basket body, the utility model drives the rotating gear to rotate through the output motor, so that the rotating gear can interact and extrude between the fixed clamping tooth, the rotating gear can move on the top of the fixed clamping tooth, the output motor, the first fixed mounting plate and the movable hanging basket body are driven to move, so that the movable hanging basket body can move between the first guide rail and the second guide rail, and can continuously move and adjust when pouring a section, so as to facilitate pouring and use conveniently.

[0004] However, in the above-mentioned prior art, the first guide rail and the second guide rail are relatively cumbersome to install, and the hanging basket body is not easy to disassemble after pouring, which increases the difficulty of work and reduces the efficiency of work, and at the same time, the hanging basket body after pouring is heavy, the stability of the cooperation of the single-side clamping tooth and the rotating gear is poor, and damage is easy to occur, thereby leading to low overall practicability. UTILITY MODEL CONTENTS

[0005] In order to make up for the above shortcomings, the utility model provides a bridge construction cantilever hanging basket, which aims to improve the low work efficiency, and the poor stability of the cooperation of the single-side clamping tooth and the rotating gear, which is easy to damage, thereby leading to low overall practicability.

[0006] The utility model discloses a bridge construction cantilever hanging basket, including first bridge pier and second bridge pier, the symmetry of first bridge pier and second bridge pier between installing guide rail, install reinforcing assembly on the guide rail, the top of guide rail is provided with first sliding slot, the first sliding block is slidably installed in the first sliding slot, two first sliding block top fixed mounting hanging basket body is fixedly installed support block on the outside of hanging basket body, two support block distance relatively far one side rotatory mounting first rotation axis, first rotation axis one end fixed mounting first gear, the rack is fixedly installed at the bottom of guide rail, first gear with rack meshing connection, two first rotation axis passes through gear set transmission connection, and install driving piece on gear set.

[0007] In the preferred technical scheme of the utility model, the first sliding block is T-shaped.

[0008] In the preferred technical scheme of the utility model, the hanging basket body is composed of left half basket and right half basket, the left half basket and the right half basket are same in shape and symmetrically arranged, the left half basket one side fixed mounting has inserted board, the right half basket one side is provided with the first insertion groove matched with the inserted board, the inserted board is L-shaped, the inserted board and the first insertion groove inner wall slide connection, the left half basket and right half basket are fixedly connected with the first sliding block top of adjacent respectively.

[0009] In the preferred technical scheme of the utility model, the reinforcing assembly includes second sliding block, support groove and threaded rod, the first bridge pier and the second bridge pier outside symmetry is provided with the support groove, the support groove inner wall rotatory mounting the threaded rod, the second sliding block is screw mounted on the threaded rod, the third sliding block is fixedly installed at the second sliding block bottom, the plug rod is fixedly installed on the third sliding block one side symmetry, the guide rail both ends are provided with the second insertion groove matched with the plug rod, the second sliding block is T-shaped, the second sliding block and the support groove inner wall slide connection.

[0010] In the preferred technical scheme of the utility model, the threaded rod one end fixed mounting adjustment shaft, the adjustment shaft one end passes through the first bridge pier or the second bridge pier and fixed mounting hexagonal turntable.

[0011] In the preferred technical scheme of the utility model, the gear set includes second rotating shafts and third rotating shafts, the support block bottom end fixed mounting L shaped support, the support inner wall bottom end rotation mounting second rotating shaft, first bevel gear fixed mounting second rotating shaft top, second bevel gear fixed mounting first rotating shaft, first bevel gear and second bevel gear meshing connection, the bracket inner wall rotation mounting third rotating shaft, third rotating shaft one end fixed mounting third bevel gear, fourth bevel gear fixed mounting second rotating shaft, third bevel gear and fourth bevel gear meshing connection, two third rotating shaft other end through bracket and mutually clamping, two second bevel gears are symmetrically arranged, third bevel gear is also symmetrically arranged.

[0012] In the preferred technical scheme of the utility model, one end of one of the third rotating shafts is fixedly installed with a linear plate, and one end of the other third rotating shaft is provided with a linear groove matched with the linear plate, the support plates are symmetrically fixedly installed at the bottom end of the hanging basket body, and the third rotating shafts slide through the adjacent support plates.

[0013] In the preferred technical scheme of the utility model, the driving member includes a motor, a horizontal plate is fixedly installed between the outer side of the left half basket and the bracket, the motor is fixedly installed at the bottom end of the horizontal plate, a fifth bevel gear is fixedly installed at the output end of the motor, a sixth bevel gear is fixedly installed on the third rotating shaft, and the fifth bevel gear and the sixth bevel gear are meshingly connected.

[0014] The utility model discloses an advantageous effect is: the utility model discloses a kind of bridge construction cantilever hanging basket by above-mentioned design, guide rail is placed between first pier and second pier, six-side rotating disc is rotated by spanner tool, six-side rotating disc is rotated by adjusting shaft and drives screw rod rotation, screw rod is moved by second sliding block and drives third sliding block, third sliding block is moved and inserts into the second insertion slot of the both ends of guide rail and is fixed, when installing the guide rail of other side, first insertion slot is inserted into the insertion plate simultaneously, and linear plate is inserted into linear groove, then another guide rail is installed as above-mentioned step, when it needs to move hanging basket body after pouring, motor is started and is driven third rotating shaft rotation by fifth bevel gear and sixth bevel gear cooperation, third rotating shaft is rotated and is driven second rotating shaft rotation by fourth bevel gear and third bevel gear cooperation, second rotating shaft is rotated and is driven both sides first gear synchronous rotation by first bevel gear and second bevel gear cooperation, first gear is driven hanging basket body movement by rack cooperation, when work is completed, it can be disassembled as above-mentioned step, this device is convenient for quick installation and disassembly, improve work efficiency, while hanging basket body is moved by both sides synchronous drive, and stability is higher, so as to improve the service life of equipment. BRIEF DESCRIPTION OF DRAWINGS

[0015] In order to more clearly illustrate the technical scheme of the embodiments of the present application, the drawings used in the embodiments will be briefly introduced as follows. Obviously, the following drawings only show some of the embodiments of the present application, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained without creative labor.

[0016] Figure 1 is a structural schematic view of the bridge construction cantilever hanging basket provided by the embodiments of the present application;

[0017] Figure 2 is a partial structural schematic view of the bridge construction cantilever hanging basket provided by the embodiments of the present application;

[0018] Figure 3 is Figure 2 is an enlarged view of A in the middle;

[0019] Figure 4 is a partial structural side view of the bridge construction cantilever hanging basket provided by the embodiments of the present application;

[0020] Figure 5 is a structural schematic view provided by the embodiments of the present application.

[0021] In the drawings: 110, first pier; 111, second pier; 120, guide rail; 121, first sliding chute; 122, first sliding block; 130, hanging basket body; 1301, left half basket; 1302, right half basket; 1303, plug-in plate; 131, support block; 132, first rotating shaft; 133, first gear; 134, rack; 140, second sliding block; 141, support groove; 142, threaded rod; 143, third sliding block; 144, plug-in rod; 145, adjusting shaft; 146, hexagonal turntable; 150, second rotating shaft; 151, third rotating shaft; 152, support; 153, one-letter plate; 154, motor. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical scheme and advantages of the embodiments of the present application more clear, the technical scheme in the embodiments of the present application will be described clearly and completely in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, and not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0023] Please refer to Figures 1-5The utility model provides technical scheme: a bridge construction cantilever hanging basket, including first bridge pier 110 and second bridge pier 111, first bridge pier 110 and second bridge pier 111 between symmetrical installation has guide rail 120, and guide rail 120 installs reinforcing assembly, and guide rail 120 top end is provided with first sliding slot 121, and first sliding slot 121 inside sliding installation first sliding block 122, and first sliding block 122 is T-shaped setting, and two first sliding block 122 top end common fixed mounting hanging basket body 130, and hanging basket body 130 outside symmetry fixed mounting support block 131, and two support block 131 distance relatively far away one side rotationally installed first rotation axis 132, and first rotation axis 132 one end fixed mounting first gear wheel 133, and guide rail 120 bottom fixed mounting rack 134, and first gear wheel 133 is connected with rack 134 meshing, and two first rotation axis 132 passes through gear set transmission connection, and gear set is installed with driving piece on.

[0024] In some specific embodiments, the hanging basket body 130 is composed of a left half basket 1301 and a right half basket 1302, the left half basket 1301 and the right half basket 1302 are the same shape and are symmetrically arranged, the left half basket 1301 is fixedly installed on one side with a plugboard 1303, the right half basket 1302 is provided on one side with a first insertion groove matched with the plugboard 1303, the plugboard 1303 is L-shaped, and the plugboard 1303 is in sliding connection with the inner wall of the first insertion groove, so that the hanging basket body 130 is conveniently installed and disassembled, and the support and stability of the left half basket 1301 and the right half basket 1302 after being connected are improved by the arrangement of the plugboard 1303 and the first insertion groove.

[0025] Please refer to Figure 2 and Figure 3 The reinforcing assembly comprises a second sliding block 140, a support groove 141 and a threaded rod 142, the support groove 141 is symmetrically arranged on the outer side of the first bridge pier 110 and the second bridge pier 111, the threaded rod 142 is rotationally installed on the inner wall of the support groove 141, the second sliding block 140 is threadedly installed on the threaded rod 142, the third sliding block 143 is fixedly installed at the bottom end of the second sliding block 140, the plug rod 144 is symmetrically fixedly installed on one side of the third sliding block 143, the second insertion groove matched with the plug rod 144 is arranged at both ends of the guide rail 120, the second sliding block 140 is T-shaped, and the second sliding block 140 is in sliding connection with the inner wall of the support groove 141.

[0026] In some specific embodiments, the threaded rod 142 is fixedly installed with an adjusting shaft 145 at one end, the adjusting shaft 145 penetrates through the first bridge pier 110 or the second bridge pier 111 and is fixedly installed with a hexagonal turntable 146 at one end, so as to conveniently drive the adjusting shaft 145 to rotate, thereby quickly installing and disassembling the guide rail 120.

[0027] Please refer to Figure 4The gear set comprises the second rotating shaft 150 and the third rotating shaft 151, the L-shaped support 152 is fixedly installed at the bottom end of the supporting block 131, the second rotating shaft 150 is rotatably installed at the bottom end of the inner wall of the support 152, the first bevel gear is fixedly installed at the top end of the second rotating shaft 150, the second bevel gear is fixedly installed on the first rotating shaft 132, the first bevel gear and the second bevel gear are meshingly connected, the third rotating shaft 151 is rotatably installed on the inner side wall of the support 152, the third bevel gear is fixedly installed at one end of the third rotating shaft 151, the fourth bevel gear is fixedly installed on the second rotating shaft 150, the third bevel gear and the fourth bevel gear are meshingly connected, the other ends of the two third rotating shafts 151 penetrate through the support 152 and are clamped to each other, the two second bevel gears are symmetrically arranged, and the third bevel gears are also symmetrically arranged. The driving member comprises the motor 154, the horizontal plate is fixedly installed between the outer side of the left half basket 1301 and the support 152, the motor 154 is fixedly installed at the bottom end of the horizontal plate, the fifth bevel gear is fixedly installed at the output end of the motor 154, the sixth bevel gear is fixedly installed on the third rotating shaft 151, and the fifth bevel gear and the sixth bevel gear are meshingly connected.

[0028] In some specific embodiments, one end of one third rotating shaft 151 is fixedly installed with a strip plate 153, the other end of the other third rotating shaft 151 is provided with a strip groove matched with the strip plate 153, the support plates are symmetrically fixedly installed at the bottom end of the hanging basket body 130, the third rotating shafts 151 slide through the adjacent support plates, and the cooperation of the strip plate 153 and the strip groove enables the two third rotating shafts 151 to synchronously rotate, thereby improving the stability of the hanging basket body 130 during movement.

[0029] Working principle: in use, the guide rail 120 is placed between the first pier 110 and the second pier 111, the six-edge rotating disc 146 is driven to rotate through the wrench tool, the six-edge rotating disc 146 rotates to drive the threaded rod 142 to rotate through the adjusting shaft 145, the threaded rod 142 rotates to drive the third sliding block 143 to move through the second sliding block 140, the third sliding block 143 moves to drive the inserting rod 144 to be inserted into the second inserting groove at the two ends of the guide rail 120 and fixed, when the guide rail 120 on the other side is installed, the inserting plate 1303 is inserted into the first inserting groove and the strip plate 153 is inserted into the strip groove, and then the other guide rail 120 is installed according to the above steps. At this time, when the hanging basket body 130 needs to be moved after pouring, the motor 154 is started to drive the third rotating shaft 151 to rotate through the cooperation of the fifth bevel gear and the sixth bevel gear, the third rotating shaft 151 rotates to drive the second rotating shaft 150 to rotate through the cooperation of the fourth bevel gear and the third bevel gear, the second rotating shaft 150 rotates to drive the two first gears 133 to synchronously rotate through the cooperation of the first bevel gear and the second bevel gear, the first gear 133 and the rack 134 cooperate to drive the hanging basket body 130 to move, and when the work is completed, the disassembly can be performed according to the above steps.

[0030] The above merely describes preferred embodiments of the present application and is not intended to limit the present application. For those skilled in the art, the present application can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A bridge construction cantilever basket, comprising a first pier and a second pier, characterized in that, The first pier and the second pier are symmetrically provided with guide rails, the guide rails are provided with reinforcing assemblies, the top ends of the guide rails are provided with first sliding grooves, first sliding blocks are slidably arranged in the first sliding grooves, the top ends of the two first sliding blocks are fixedly connected with a hanging basket body, support blocks are symmetrically fixedly arranged outside the hanging basket body, the two support blocks are rotatably arranged on the sides away from each other, first shafts are fixedly arranged at one end of the first shafts, first gears are fixedly arranged at one end of the first shafts, a rack is fixedly arranged at the bottom end of the guide rail, the first gears are in meshing connection with the rack, the two first shafts are in transmission connection through a gear set, and a driving member is arranged on the gear set.

2. The cantilevered hanging basket for bridge construction of claim 1, wherein, The first sliding block is T-shaped.

3. The cantilevered hanging basket for bridge construction of claim 1, wherein, The hanging basket body is composed of a left half basket and a right half basket, the left half basket and the right half basket are symmetrically arranged and have the same shape, a plug-in plate is fixedly arranged on one side of the left half basket, and a first plug-in groove matched with the plug-in plate is arranged on one side of the right half basket.

4. The cantilevered hanging basket for bridge construction of claim 1, wherein, The reinforcing assembly comprises second sliding blocks, support grooves and threaded rods, the support grooves are symmetrically arranged outside the first pier and the second pier, the threaded rods are rotatably arranged on the inner walls of the support grooves, the second sliding blocks are threadedly arranged on the threaded rods, third sliding blocks are fixedly arranged at the bottom ends of the second sliding blocks, plug-in rods are symmetrically fixedly arranged on one side of the third sliding blocks, and second plug-in grooves matched with the plug-in rods are arranged at the two ends of the guide rail.

5. The cantilevered hanging basket for bridge construction of claim 4, wherein, One end of the threaded rod is fixedly arranged with an adjusting shaft, and the adjusting shaft penetrates through the first pier or the second pier and is fixedly arranged with a hexagonal turntable at one end.

6. The cantilevered hanging basket for bridge construction of claim 3, wherein, The gear set comprises second shafts and third shafts, L-shaped supports are fixedly arranged at the bottom ends of the support blocks, the second shafts are rotatably arranged on the bottom ends of the inner walls of the supports, first bevel gears are fixedly arranged at the top ends of the second shafts, second bevel gears are fixedly arranged on the first shafts, the first bevel gears are in meshing connection with the second bevel gears, the third shafts are rotatably arranged on the inner side walls of the supports, third bevel gears are fixedly arranged at one end of the third shafts, fourth bevel gears are fixedly arranged on the second shafts, the third bevel gears are in meshing connection with the fourth bevel gears, and the other ends of the two third shafts penetrate through the support and are clamped with each other.

7. The cantilevered hanging basket for bridge construction of claim 6, wherein, One end of one of the third shafts is fixedly arranged with a strip-shaped plate, and one end of the other third shaft is provided with a strip-shaped groove matched with the strip-shaped plate.

8. The cantilevered hanging basket for bridge construction of claim 6, wherein, The driving member comprises a motor, a horizontal plate is fixedly arranged between the outer side of the left half basket and the support, the motor is fixedly arranged at the bottom end of the horizontal plate, a fifth bevel gear is fixedly arranged at the output end of the motor, a sixth bevel gear is fixedly arranged on the third shaft, and the fifth bevel gear is in meshing connection with the sixth bevel gear.

Citation Information

Patent Citations

  • Hanging basket for continuous beam cantilever pouring

    CN219386044U