Device for mounting and dismounting embedded component of sheet-pile wall
By designing a device that includes a material storage platform, a load-bearing support, a force-bearing rod, and a motor drive, the problems of difficult concrete pouring for sheet pile walls and troublesome installation and removal of embedded components were solved, enabling convenient installation and removal of embedded components and improving construction efficiency.
Patent Information
- Application Number
- CN202423079287.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-13
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-12-13
AI Technical Summary
The concrete pouring of sheet pile walls is difficult, and the installation and removal of embedded components are troublesome, which affects construction efficiency.
Design a device comprising a storage platform, a load-bearing bracket, a force-bearing rod, a motor, and a traction rope. The motor drives the traction rope to install and remove pre-embedded components, and the movable force-bearing rod and storage platform are used to transport and store the pre-embedded components.
This enables convenient installation and removal of pre-embedded components, reduces the amount of transportation work on the construction site, and improves construction efficiency.
Smart Images

Figure CN223562162U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a device for installing and removing the pre-embedded component of sheet pile wall belongs to the field of building construction auxiliary equipment. BACKGROUND
[0002] The sheet pile wall is a kind of pile-plate combined composite structure, mainly used to resist lateral earth pressure, and is widely applied to water conservancy, highway, municipal and other types of engineering. When the sheet pile wall is constructed, the pile body of supporting pile is constructed, then the construction of corbel beam is carried out, and then the construction of sheet pile wall plate is carried out. Since the construction of corbel beam is completed when the sheet pile wall plate is constructed, it is difficult to pour the sheet pile wall plate concrete. To solve the problem that it is difficult to pour the sheet pile wall plate concrete in the prior art, the present application provides a scheme of arranging a plurality of concrete pouring openings on the corbel beam of the sheet pile wall. The concrete pouring openings arranged on the corbel beam can facilitate the pouring construction of the sheet pile wall plate concrete. When the sheet pile wall corbel beam is constructed, the pre-embedded component of the concrete pouring opening needs to be installed at the corresponding position, and the pre-embedded component needs to be removed later. Since the number of pre-embedded components is relatively large, the installation and removal are relatively troublesome, and the pre-embedded components need to be frequently transported in the construction site, which affects the construction efficiency. SUMMARY
[0003] In view of the above defects in the prior art, the utility model provides a device for installing and removing the pre-embedded component of sheet pile wall, which is simple in structure, convenient to use and easy to install and remove.
[0004] The utility model is realized through the following technical schemes: a device for installing and removing the pre-embedded component of sheet pile wall, characterized by comprising storage platform, bearing support, stress rod, motor, traction rope, the storage platform includes base, the baffle that is fixedly arranged at the upper portion four arounds of base, the mobile wheel is arranged at the lower portion four corner positions of base respectively, the bearing support is fixed at one end of base vertically, a connecting ring is fixed on the upper portion of bearing support, the stress rod movably passes through the connecting ring, the front end of stress rod is provided with pulley, the rear end of stress rod is provided with handle, the motor is fixed on the upper end of bearing support through motor fixed seat, one end of traction rope is connected with motor shaft, the other end of traction rope is connected with lifting hook after passing through the pulley of the front end of stress rod, and the rear portion of stress rod is connected with the detachable stay chain between base.
[0005] The utility model discloses, the storage platform is used for containing pre -buried component, through the mobile wheel of setting down of base, the whole device can move, and it is convenient to carry or transport pre -buried component in the construction site. The one end of traction rope connection lifting hook is used for connecting pre -buried component, and the stressed bar is as the stressed bar piece of hoisting pre -buried component, and the load bearing support is as the support component. When the motor rotates, can release or winding traction rope, thereby can lower or lift pre -buried component to install or disassemble. The stressed bar can move horizontally after being stressed, thereby can move pre -buried component to the storage platform or move pre -buried component from the storage platform to the position to be installed. The handle of the rear end of stressed bar is used for manual operation stressed bar. The inclined pull chain is used for keeping stressed bar balanced.
[0006] Further, for the quick connection of the inclined pull chain, a connecting seat is arranged on the base, and the inclined pull chain is connected with the connecting seat through a connecting pin.
[0007] The utility model discloses the beneficial effect is: the utility model discloses simple structure, and it utilizes motor, traction rope, and can conveniently install and disassemble pre -buried component of sheet pile wall, saves time and energy, and simple operation, convenient, utilizes the stressed bar of movable, and can conveniently move pre -buried component to store on the storage platform or move pre -buried component on the storage platform to the position to be installed, through the movable storage platform, can transport multiple pre -buried components to the construction site once, or store the pre -buried component of dismantling on the storage platform, and the storage and transportation of pre -buried component in the construction site can be reduced, and the transportation or the work load of carrying in the field can be reduced. BRIEF DESCRIPTION OF DRAWINGS
[0008] Figure 1 It is the three-dimensional structure schematic diagram of the utility model discloses;
[0009] Figure 2 It is the side view schematic diagram of the utility model discloses;
[0010] Figure 3 It is the structure schematic diagram of the load bearing support in the utility model discloses;
[0011] Figure 4 It is Figure 2 the enlarged schematic diagram of A part in
[0012] Figure 5 It is the structure schematic diagram of pre -buried component;
[0013] In the drawing, 1, mobile wheel, 2, base, 3, baffle, 4, pre -buried component, 5, lifting hook, 6, traction rope, 7, pulley, 8, stressed bar, 9, motor, 10, motor fixed seat, 11, handle, 12, inclined pull chain, 13, connecting seat, 14, load bearing support, 15, connecting ring, 16, the cover plate of pre -buried component, 17, release agent. DETAILED DESCRIPTION
[0014] The utility model is further explained below through non-restrictive examples and in connection with the drawings:
[0015] As shown in the drawings, a device for installing and removing pre-embedded components of sheet pile walls comprises a storage platform, a load-bearing support 14, a force rod 8, a motor 9 and a traction rope 6. The storage platform comprises a base 2 and a baffle 3 fixed around the upper part of the base 2. The base 2 is made of steel plate and section steel, and the baffle 3 can be made of thin steel plate. Mobile wheels 1 are arranged at the lower corners of the base 2. The mobile wheels 1 are used for walking and are prior art. The load-bearing support 14 is vertically fixed at one end of the base 2. A connecting ring 15 is fixed at the upper part of the load-bearing support 14. The force rod 8 movably passes through the connecting ring 15. The load-bearing support 14 is a load-bearing support structure. Its structural strength needs to meet the construction requirements. The load-bearing support 14 is made of steel pipe and / or section steel. Reinforcing diagonal braces can be arranged. The connecting ring 15 is a ring-shaped steel component. It can be welded with the load-bearing support 14. The inner diameter of the connecting ring 15 is larger than the outer diameter of the force rod 8. A pulley 7 is arranged at the front end of the force rod 8. A handle 11 is arranged at the rear end of the force rod 8. The motor 9 is fixed at the upper end of the load-bearing support 14 through a motor fixing seat 10. One end of the traction rope 6 is connected with the motor shaft of the motor 9. The other end of the traction rope 6 is connected with a lifting hook 5 after passing through the pulley 7 at the front end of the force rod 8. The lifting hook 5 is a professional lifting hook with a safety ring. A detachable diagonal pull chain 12 is connected between the rear part of the force rod 8 and the base 2. In order to facilitate the quick connection of the diagonal pull chain 12, a connecting seat 13 is arranged on the base 2 in this embodiment. The diagonal pull chain 12 is connected with the connecting seat 13 through a connecting pin.
[0016] When the device works, the pre-embedded component 4 to be installed is placed on the storage platform. The device as a whole can be pushed to the pre-embedded component installation position at the construction site by manual operation. When the pre-embedded component is installed, the position of the force rod 8 is adjusted manually. The hook 5 of the traction rope 6 is connected with the pre-embedded component 4 to be installed on the storage platform. The motor 9 is started to wind the traction rope 6 to lift the pre-embedded component 4. Then the motor 9 is reversed to release the traction rope 6. The pre-embedded component 4 is hoisted to the installation position of the pre-embedded component by manual operation to cooperate with the pushing of the force rod 8 to install the pre-embedded component. When the pre-embedded component 4 is removed, the position of the force rod 8 is adjusted so that the hook 5 of the traction rope is located above the pre-embedded component 4 to be removed. The hook 5 is connected with the pre-embedded component 4 to be removed. The motor 9 is started to wind the traction rope 6 to remove the pre-embedded component 4 from the embedded position. In order to ensure the smooth removal of the pre-embedded component 4, the outer surface of the pre-embedded component 4 needs to be coated with a release agent 17 before installation. During the construction process, when the position of the force rod does not need to be adjusted, the force rod 8 can be kept balanced by connecting the force rod 8 and the base 2 through the diagonal pull chain 12.
[0017] The utility model discloses simple structure, convenient operation can conveniently install and remove the pre -buried component of sheet pile wall of it, and the pre -buried component of installation and the pre -buried component of removal can all be held on the storage platform and transport, can reduce the on -the -spot transport and transportation, and the construction is convenient.
[0018] Other parts in the embodiment are prior art and will not be described here.
Claims
1. A device for mounting and dismounting a pre-embedded member of a sheet pile wall, characterized in that: The utility model relates to a material storage platform, load bearing support (14), force bar (8), motor (9), traction rope (6), the material storage platform includes base (2), the baffle (3) fixed setting in the upper portion four around of base (2), the lower portion four corner position of base (2) is provided with mobile wheel (1) respectively, load bearing support (14) vertical fixed in one end of base (2), the upper portion of load bearing support (14) is fixed with a connecting ring (15), force bar (8) movably passes through connecting ring (15), the front end of force bar (8) is provided with pulley (7), the rear end of force bar (8) is provided with handle (11), motor (9) is fixed in the upper end of load bearing support (14) through motor fixed seat, one end of traction rope (6) is connected with motor shaft of motor (9), the other end of traction rope (6) is connected with lifting hook after passing through pulley (7) of the front end of force bar (8), the rear portion of force bar (8) is connected with the detachable cable-stayed padlock (12) between base (2).
2. The device for mounting and dismounting the embedded member of sheet pile wall according to claim 1, characterized in that: Base (2) is provided with connecting seat (13), and cable-stayed padlock (12) is connected with connecting seat (13) through connecting pin.