Bridge diaphragm plate construction hanging basket

By designing a construction formwork for bridge diaphragms, the problem of time-consuming construction of the steel reinforcement skeleton of bridge diaphragms was solved, providing a convenient construction method and improving construction efficiency.

CN223593233UActive Publication Date: 2025-11-25SHAOXING SHANGYU DISTRICT TRANSPORTATION IND DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423181614.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-11-25
Estimated Expiration
2034-12-23

AI Technical Summary

Technical Problem

In existing technologies, scaffolding needs to be erected during the construction of the steel reinforcement cage for bridge diaphragms, which takes a long time.

Method used

Design a construction formwork for bridge diaphragms, including a standing platform, a left hanging frame, a right hanging frame, and a barrier cable. By hanging it on the longitudinal main reinforcement bars of the bridge diaphragm, it provides working space and enables reinforcement binding operations.

Benefits of technology

It simplifies the construction process of the steel reinforcement skeleton of bridge diaphragms, and improves construction efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223593233U_ABST
    Figure CN223593233U_ABST
Patent Text Reader

Abstract

The utility model provides a bridge diaphragm plate construction hanging basket which comprises a person standing platform, a left hanging frame with the lower end connected to the left side of the person standing platform, a right hanging frame with the lower end connected to the right side of the person standing platform and a plurality of arresting cables for connecting the front ends of the left hanging frame and the right hanging frame together, and the arresting cables are distributed in the vertical direction. The front side of the left hanging frame and the front side of the right hanging frame are disconnected to form an operation space, the left hanging frame is hinged to the people standing platform through a left shaft pin, the left shaft pin extends in the front-back direction, the right hanging frame is hinged to the people standing platform through a right shaft pin, the right shaft pin extends in the front-back direction, and the left shaft pin extends in the front-back direction. The length of the arresting cable is larger than the distance between the left hanging frame and the right hanging frame. The utility model aims to provide the hanging basket for construction of the bridge diaphragm plate, which is used for constructing the bridge diaphragm plate and solves the problem that time is wasted when a scaffold is built to construct the bridge diaphragm plate.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to bridge construction equipment, especially a bridge diaphragm construction hanging basket. BACKGROUND

[0002] The T beam comprises an intermediate beam extending along the longitudinal direction of the bridge and a top beam connected to the upper end of the intermediate beam, the top beam outputs the intermediate beam along the lateral direction of the bridge, and the intermediate beam comprises an intermediate beam reinforcement framework and intermediate beam concrete poured into the intermediate beam reinforcement framework. Some T beams are provided with a plurality of transverse diaphragms distributed along the longitudinal direction of the bridge on both sides of the intermediate beam, the transverse diaphragm comprises a transverse diaphragm reinforcement framework and transverse diaphragm concrete poured into the transverse diaphragm reinforcement framework, the transverse diaphragm reinforcement framework is connected with the intermediate beam reinforcement, and the intermediate beam concrete is poured together with the transverse diaphragm concrete. The existing transverse diaphragm reinforcement framework is constructed by erecting a scaffold, which consumes a lot of time. SUMMARY

[0003] The utility model aims at providing a bridge diaphragm construction hanging basket for constructing a bridge diaphragm, which solves the problem of time-consuming construction of the bridge diaphragm by erecting a scaffold.

[0004] In order to achieve the above-mentioned utility model purposes, the utility model adopts the following technology: a bridge diaphragm construction hanging basket, characterized by comprising a standing platform, a left hanging frame connected to the left side of the standing platform at the lower end, a right hanging frame connected to the right side of the standing platform at the lower end, and a plurality of blocking ropes connecting the front ends of the left hanging frame and the right hanging frame together, the blocking ropes are distributed along the up-down direction, the front sides of the left hanging frame and the right hanging frame are disconnected to form a working space, the left hanging frame is hinged to the standing platform through a left shaft pin extending along the front-back direction, the right hanging frame is hinged to the standing platform through a right shaft pin extending along the front-back direction, and the length of the blocking rope is greater than the distance between the left hanging frame and the right hanging frame. In use, the utility model is hung on the longitudinal main reinforcement of the bridge diaphragm, a person stands on the standing platform, the working space faces the intermediate beam of the bridge precast beam, and the steel bar binding operation is performed on the longitudinal main reinforcement of the bridge diaphragm.

[0005] Preferably, the left bracket includes a left front vertical rod, a left rear vertical rod, and several left longitudinal rods connecting the left front and left rear vertical rods. The left longitudinal rods are distributed vertically. The left end of the standing platform is located between the left front and left rear vertical rods, and rests on the lowest left longitudinal rod. The left front vertical rod has a left front elongated hole extending vertically. The left rear vertical rod has a left rear elongated hole extending vertically. There are two left axle pins, which are coaxial and fixed to the front and rear sides of the standing platform, respectively. The front left axle pin passes through the left front elongated hole of the left front vertical rod, and the rear left axle pin passes through the left rear elongated hole of the left rear vertical rod. The right bracket includes a right front vertical rod, a right rear vertical rod, and several right longitudinal rods connecting the right front and right rear vertical rods. The right longitudinal rods are distributed in the vertical direction. The right end of the standing platform is located between the right front and right rear vertical rods. The right end of the standing platform rests on the lowermost right longitudinal rod. The right front vertical rod has a right front elongated hole that extends in the vertical direction. The right rear vertical rod has a right rear elongated hole that extends in the vertical direction. There are two right axle pins. The two right axle pins are coaxial and fixed to the front and rear sides of the standing platform, respectively. The right axle pin located at the front passes through the right front elongated hole of the right front vertical rod, and the right axle pin located at the rear passes through the right rear elongated hole of the right rear vertical rod. When the longitudinal bar and the vertical bar break, the pivot pin can suspend the platform on the suspension frame, thus serving as a safety measure.

[0006] Preferably, the left front elongated hole in the left front vertical rod, the left rear elongated hole in the left rear vertical rod, the right front elongated hole in the right front vertical rod, and the right rear elongated hole in the right rear vertical rod are all through holes. This facilitates manufacturing.

[0007] Preferably, the right end of the barrier cable is fixedly connected to the right hanger, and the left end of the barrier cable is detachably connected to the left hanger via a detachable connection structure. This allows the barrier cable to be removed to avoid interfering with passage.

[0008] Preferably, the detachable connection structure includes a connecting block fixed on the left hanger and a pin fixed to the left end of the arresting cable. The connecting block has a vertical pin hole, and the pin is inserted into the pin hole.

[0009] Preferably, the left bracket is provided with several left hooks distributed in the front-to-back direction, and the right bracket is provided with several right hooks distributed in the front-to-back direction. This facilitates connection with the longitudinal main reinforcement bars of the bridge diaphragm.

[0010] Preferably, the left hook bends to the right and the right hook bends to the left. This reduces the impact of this invention on the rebar tying operation.

[0011] Preferably, the standing platform comprises a bracket and a pad plate on the bracket. The comfort during standing can be improved.

[0012] Beneficial effects: the bridge diaphragm can be conveniently hung on the longitudinal main reinforcement of the bridge diaphragm for construction, and the moving, installation and dismounting are convenient. BRIEF DESCRIPTION OF DRAWINGS

[0013] Figure 1 is a front view schematic diagram of the utility model;

[0014] Figure 2 is Figure 1 a local enlarged schematic diagram of A.

[0015] In the figure: standing platform 1, left hanging bracket 2, right hanging bracket 3, blocking cable 4, bracket 5, pad plate 6, detachable connecting structure 7, connecting block 8, bolt 9, left front vertical rod 10, left rear vertical rod 11, left longitudinal rod 12, left longitudinal rod 13 at the lowest, left front vertical rod left front long hole 14, left shaft pin 15, left hook 16, right hook 17, right front vertical rod 18, right rear vertical rod 19, right longitudinal rod 20, right longitudinal rod 21 at the lowest, right front vertical rod right front long hole 22, right shaft pin 23. DETAILED DESCRIPTION

[0016] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0017] Referring to Figure 1 and Figure 2The utility model provides a bridge diaphragm construction hanging basket, including stationing platform 1, left hanging frame 2 of lower end connection in the left side of stationing platform, right hanging frame 3 of lower end connection in the right side of stationing platform and the front end of left hanging frame and right hanging frame is connected together with a plurality of barrier cable 4, and stationing platform includes bracket 5 and the cushion plate 6 on bracket, and barrier cable distributes along the up and down direction, and the right end of barrier cable is fixed together with right hanging frame, and the left end of barrier cable is detachably connected together with left hanging frame through detachable connecting structure 7, and detachable connecting structure includes connecting block 8 fixed on left hanging frame and bolt 9 fixed on the left end of barrier cable, and connecting block is equipped with vertical bolt hole, and bolt is inserted in the bolt hole, and the front side of left hanging frame and right hanging frame is disconnected and forms operation space, and the length of barrier cable is greater than the distance between left hanging frame and right hanging frame, and when using, the utility model is hung on the longitudinal main reinforcement of bridge diaphragm, and the person stands on stationing platform, and operation space is towards the middle beam of bridge precast beam, and carries out the steel bar operation on the longitudinal main reinforcement of bridge diaphragm.

[0018] Left hanging frame includes left front vertical pole 10, left rear vertical pole 11 and a plurality of left longitudinal pole 12 of left front vertical pole and left rear vertical pole are connected together, and left longitudinal pole distributes along the up and down direction, and the left end of stationing platform is located between left front vertical pole and left rear vertical pole, and the left end of stationing platform is rested on the leftmost lower left longitudinal pole 13, and left front vertical pole is equipped with left front vertical pole part left front long slot 14, and left front vertical pole part left front long slot extends along the up and down direction, and left rear vertical pole is equipped with left rear vertical pole part left rear long slot, and left rear vertical pole part left rear long slot extends along the up and down direction, and left shaft pin 15 has two, and two left shaft pins are coaxial and are fixed on the front side and rear side of stationing platform respectively, and the left front vertical pole part left front long slot is passed in, and the left rear vertical pole part left rear long slot is passed in, and the structure of right hanging frame and the connecting mode same stationing platform with left hanging frame, namely: right hanging frame includes right front vertical pole 18, right rear vertical pole 19 and a plurality of right longitudinal pole 20 of right front vertical pole and right rear vertical pole are connected together, and right longitudinal pole distributes along the up and down direction, and the right end of stationing platform is located between right front vertical pole and right rear vertical pole, and the right end of stationing platform is rested on the rightmost lower right longitudinal pole 21, and right front vertical pole is equipped with right front vertical pole part right front long slot 22, and right front vertical pole part right front long slot extends along the up and down direction, and right rear vertical pole is equipped with right rear vertical pole part right rear long slot, and right rear vertical pole part right rear long slot extends along the up and down direction, and right shaft pin 23 has two, and two right shaft pins are coaxial and are fixed on the front side and rear side of stationing platform respectively, and the right front vertical pole part right front long slot is passed in, and the right rear vertical pole part right rear long slot is passed in, and left front vertical pole part left front long slot, left rear vertical pole part left rear long slot, right front vertical pole part right front long slot and right rear vertical pole part right rear long slot are all through -hole.

[0019] The left hanging hooks 16 are curved to the right, and the right hanging hooks 17 are curved to the left.

[0020] It is to be noted that the relational terms herein, such as first and second, and the like, are used solely to distinguish one from another entity or action without necessarily requiring or implying any actual relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can also include other elements not expressly listed or inherent to such process, method, article, or apparatus. An element proceeded by "comprises... a" does not, without more constraints, exclude the existence of additional identical elements in the process, method, article, or apparatus that comprises the element.

[0021] While the embodiments of the present application have been illustrated and described, it will be understood by those skilled in the art that various changes, modifications, substitutions, and alterations can be made therein without departing from the spirit and scope of the present application, which is defined by the appended claims and their equivalents.

Claims

1. A bridge diaphragm construction basket, characterized by, The left hanging frame is connected with the left end of the standing platform through a left shaft pin, and the right hanging frame is connected with the right end of the standing platform through a right shaft pin.

2. The construction hanging basket of a bridge diaphragm according to claim 1, characterized in that, The left hanging frame comprises a left front vertical rod, a left rear vertical rod and a plurality of left vertical rods connecting the left front vertical rod and the left rear vertical rod together, the left vertical rods are distributed along the up-down direction, the left end of the standing platform is located between the left front vertical rod and the left rear vertical rod, and the left end of the standing platform is placed on the left vertical rod at the lowermost position.

3. The construction hanging basket of a bridge diaphragm according to claim 2, characterized in that, The left front vertical rod is provided with a left front vertical rod part left front long slot hole extending along the up-down direction, the left rear vertical rod is provided with a left rear vertical rod part left rear long slot hole extending along the up-down direction, the left shaft pin has two coaxial left shaft pins fixed on the front side and the rear side of the standing platform respectively, the left shaft pin in front is arranged in the left front vertical rod part left front long slot hole, and the left shaft pin at the rear is arranged in the left rear vertical rod part left rear long slot hole.

4. The construction hanging basket of a bridge diaphragm according to claim 1 or 2 or 3, characterized in that, The right hanging frame comprises a right front vertical rod, a right rear vertical rod and a plurality of right vertical rods connecting the right front vertical rod and the right rear vertical rod together, the right vertical rods are distributed along the up-down direction, the right end of the standing platform is located between the right front vertical rod and the right rear vertical rod, and the right end of the standing platform is placed on the right vertical rod at the lowermost position.

5. The construction basket for bridge diaphragm according to claim 4, characterized in that, The right front vertical rod is provided with a right front vertical rod part right front long slot hole extending along the up-down direction, the right rear vertical rod is provided with a right rear vertical rod part right rear long slot hole extending along the up-down direction, the right shaft pin has two coaxial right shaft pins fixed on the front side and the rear side of the standing platform respectively, the right shaft pin in front is arranged in the right front vertical rod part right front long slot hole, and the right shaft pin at the rear is arranged in the right rear vertical rod part right rear long slot hole.

6. The construction hanging basket of a bridge diaphragm according to claim 1 or 2 or 3, characterized in that, The left front vertical rod part left front long slot hole, the left rear vertical rod part left rear long slot hole, the right front vertical rod part right front long slot hole and the right rear vertical rod part right rear long slot hole are all through holes.

7. The construction basket for bridge diaphragm according to claim 6, characterized in that, The right end of the blocking rope is fixedly connected with the right hanging frame, and the left end of the blocking rope is detachably connected with the left hanging frame through a detachable connecting structure.

8. The construction hanging basket of a bridge diaphragm according to claim 1 or 2 or 3, characterized in that, The detachable connecting structure comprises a connecting block fixed on the left hanging frame and a bolt fixedly connected with the left end of the blocking rope, the connecting block is provided with a vertical bolt hole, and the bolt is inserted into the bolt hole. The left hanging frame is provided with a plurality of left hooks distributed along the front-rear direction, and the right hanging frame is provided with a plurality of right hooks distributed along the front-rear direction. The left hooks are curved to the right, and the right hooks are curved to the left. The standing platform comprises a bracket and a pad plate on the bracket.