Multi-group connection adjustable vertical temporary anchoring structure for bridge horizontal rotation system
By employing multiple sets of adjustable vertical temporary anchoring structures in the bridge's horizontal rotation system, and using adjusting frames and nuts to connect the anchoring bolts, the problem of temporary anchoring failure caused by the yielding of fine-rolled threaded steel was solved, thereby improving the stability and safety of bridge construction.
Patent Information
- Application Number
- CN202423206996.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-11-28
- Estimated Expiration
- 2034-12-25
AI Technical Summary
In existing bridge construction, temporary anchoring measures fail due to the compressive yielding of finely rolled threaded steel bars, affecting the stability and safety of the bridge, and are difficult to remove and repeat.
Design a bridge horizontal rotation system with a multi-set adjustable vertical temporary anchoring structure, including an adjusting frame, nuts and anchor bolts. The multiple sets of anchor bolts are adjustablely connected on the adjusting frame to offset unbalanced moments and can be flexibly adjusted according to actual conditions to adapt to the settlement or changes of the pier cap.
It improves the stability and safety of bridge construction, ensures overall stability and safety during the construction process, reduces the risk of structural failure, and enhances construction efficiency and reliability.
Smart Images

Figure CN223607760U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to bridge construction temporary anchoring technical field, provide a vertical temporary anchoring structure of many groups of connection adjustable for bridge flat -turn system. BACKGROUND
[0002] In the continuous beam cantilever construction, the pier top box girder theoretically adopts symmetrical pouring, but it is difficult to guarantee the weight consistency of the two sides of the box girder in the actual construction process, the box girder will produce unbalanced moment effect, which will affect the internal spherical hinge system and cause hidden trouble for subsequent rotation construction. Therefore, temporary anchoring measures are arranged between the pile caps to eliminate the unbalanced moment of the box girder, so as to ensure the overall stability of the rotation T structure and reduce the construction safety risk. However, in the actual construction, the temporary anchoring measures usually adopt the form of pouring concrete outside the fine rolling threaded steel, and are affected by the gap setting of the supporting legs, the two pile caps are sunk to different degrees, so that the fine rolling threaded steel reinforcement of the pile cap longitudinal anchoring is in compression yielding state, thereby causing the failure of the temporary anchoring measures. At the same time, before the bridge is formally rotated, the temporary anchoring measures need to be easily removed, and after the bridge is rotated, the temporary anchoring measures can be quickly implemented again. Therefore, the temporary anchoring measures can effectively ensure that there is no risk of instability of the whole beam caused by relying on spherical hinge and supporting leg alone in the construction link. It can be seen that the installation and removal of the temporary anchoring measures are extremely important for the construction quality of the rotating bridge. SUMMARY
[0003] Therefore, the purpose of the utility model is to provide a vertical temporary anchoring structure of many groups of connection adjustable for bridge flat -turn system, which is reliable in performance and convenient to construct, so as to solve the problem of failure of temporary anchoring measures caused by compression yielding of fine rolling threaded steel in the prior art.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical scheme:
[0005] The utility model provides a vertical temporary anchoring structure of many groups of connection adjustable for bridge flat -turn system, which is arranged between the upper pile cap and the lower pile cap of the bridge flat -turn system, and one set is arranged relative to each corner of the upper pile cap before rotation, and a single set of temporary anchoring structure comprises an adjusting frame, a nut and an anchoring screw, and the corresponding ends of the anchoring screw anchored with the upper pile cap and the anchoring screw anchored with the lower pile cap are adjustably connected to the adjusting frame through the respective nuts. In this way, the structure can effectively offset the risk caused by unbalanced moment and provide reliable support for subsequent rotation construction, and the temporary anchoring structure can be easily removed before the bridge is rotated, without affecting the flat -turn construction of the bridge.
[0006] Optionally, the single set of temporary anchoring structure is arranged in at least three groups symmetrically relative to the anchoring screw rods on both sides of the adjusting frame.
[0007] Optionally, the adjusting frame is composed of multiple vertical plates, horizontal plates and reinforced plates, each of the adjacent two vertical plates is provided with a horizontal plate at the upper end and the lower end, and the connection between the vertical plate and the horizontal plate is provided with a reinforced plate; the horizontal plate is used for penetrating a single anchoring screw rod and fastening the anchoring screw rod with a nut.
[0008] Optionally, the through hole for penetrating a single anchoring screw rod on the horizontal plate adopts a strip-shaped hole.
[0009] Optionally, the anchoring screw rod is connected with a steel plate at the end away from the adjusting frame.
[0010] The bridge flat rotation system with the multi-group connecting adjustable vertical temporary anchoring structure can effectively solve the imbalance problem caused by the pile cap settlement or other factors, improve the safety and reliability of construction, and has the advantages of high stability, high strength, convenient adjustment, high safety and reliability, and the like.
[0011] The other advantages, objects, and features of the present application will be more clearly understood from the following detailed description taken in conjunction with the accompanying drawings, and will be readily apparent to those skilled in the art and teaching, based on the consideration of the following detailed description, or from the practice of the present application. The objects and other advantages of the present application can be realized and attained by means of the instrumentalities and combinations particularly pointed out in the following description. BRIEF DESCRIPTION OF DRAWINGS
[0012] In order to make the objects, technical solutions and advantages of the present application clearer, the preferred embodiments of the present application will be described in detail below with reference to the drawings, in which:
[0013] Figure 1 is a schematic view of a turntable before the multi-group connecting adjustable vertical temporary anchoring structure for the bridge flat-turning system of the present application;
[0014] Figure 2 is a top view schematic view of the present application; Figure 1
[0015] Figure 3 is an enlarged schematic view of A part in the present application; Figure 1
[0016] Figure 4 is a C-C schematic view in the present application; Figure 3
[0017] Figure 5 is a schematic view of a turntable after the multi-group connecting adjustable vertical temporary anchoring structure for the bridge flat-turning system of the present application;
[0018] Fig. 1 is a temporary anchoring structure, 11 is an adjusting frame, 111 is a vertical plate, 112 is a horizontal plate, 113 is a reinforced plate, 12 is a nut, 13 is an anchoring screw, 14 is a steel plate; 2 is an upper bearing platform; 3 is a lower bearing platform. DETAILED DESCRIPTION
[0019] The present application will be further described below in conjunction with specific embodiments. The drawings are only used for illustrative description, and the representation is only a schematic view, not a physical drawing, and should not be understood as a limitation of the present patent; in order to better illustrate the embodiments of the present application, some components in the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it can be understood that some known structures and their descriptions in the drawings may be omitted.
[0020] As Figures 1-5 As shown, the utility model relates to a kind of multiple groups of connection adjustable vertical temporary anchoring structure for bridge flat rotation system, which is arranged between the upper bearing platform 2 and the lower bearing platform 3 of bridge flat rotation system, and relative to the four corners of the upper bearing platform 2 before rotation body each arrangement has a set, and single set temporary anchoring structure 1 includes adjusting frame 11, nut 12 and anchoring screw rod 13, wherein, adjusting frame 11 is the main support frame of the temporary anchoring structure, provides overall stability and adjustability;And nut 12 is used to connect anchoring screw rod 13 and adjusting frame 11, allow fine tuning in the construction process, to adapt to different stress and settlement situation;And anchoring screw rod 13 is the connecting part between the upper bearing platform 2 and the lower bearing platform 3, responsible for load transfer and ensure the stability of bridge, i.e. in the corresponding end of the anchoring screw rod 13 anchored with the upper bearing platform 2 and the anchoring screw rod 13 anchored with the lower bearing platform 3 face each other by respective nut 12 adjustably connected on adjusting frame 11. In this way, before rotation body, the upper bearing platform 2 and the lower bearing platform 3 are temporarily anchored by the multiple groups of connection adjustable vertical temporary anchoring structure, then the anchoring screw rod 13 arranged in the upper bearing platform 2 and the anchoring screw rod 13 arranged in the lower bearing platform 3 can be separated by adjusting frame 11 to release the temporary anchoring between the upper bearing platform 2 and the lower bearing platform 3, and after the completion of rotation body of bridge flat rotation system, the anchoring screw rod 13 arranged in the upper bearing platform 2 and another corresponding anchoring screw rod 13 arranged in the lower bearing platform 3 are connected again by adjusting frame 11. By adjusting the nut, the above scheme can realize accurate control of the anchoring screw rod, adapt to the settlement or deformation of the bearing that may occur during construction, thereby ensuring the stability of the structure;And the multiple arrangement forms are arranged with a set of temporary anchoring structure at the four corners of the upper bearing platform before rotation body, so that the whole structure is uniformly stressed, and the potential risk caused by local stress concentration is reduced. The temporary anchoring mechanism plays an important role in bridge flat rotation construction, improves the safety and efficiency of construction, and is a reliable and convenient construction solution.
[0021] In the present embodiment, the anchoring screw rods 13 on both sides of the adjusting frame 11 in the single set temporary anchoring structure 1 are arranged as at least three groups in symmetrical arrangement. In this way, through symmetrical design, the unbalanced moment caused by external force can be effectively offset, the overturning resistance of the bridge during construction is improved, and the construction safety is ensured. The arrangement of at least three groups of anchoring screw rods means that the structure has a certain redundancy, and if one group fails, the other groups can still provide necessary support to ensure the safety of the overall structure.
[0022] In the embodiment, the adjusting frame 11 is composed of multiple vertical plates 111, horizontal plates 112 and reinforced plates 113. The vertical plates 111 serve as the main supporting elements of the adjusting frame 11, providing vertical supporting force for the adjusting frame 11. The height and number of the vertical plates 111 can be adjusted according to actual construction requirements to adapt to different types of bridge designs. A horizontal plate 112 is arranged at the upper and lower ends between two adjacent vertical plates 111. The horizontal plate 112 is arranged between adjacent vertical plates 111 to provide connection and stability, providing lateral stiffness to the adjusting frame 11. The horizontal plate 112 is used for single anchoring screw rod 13 to pass through and cooperate with the nut 12 to fasten the anchoring screw rod 13, providing support for the penetration and fixation of the anchoring screw rod 13. Reinforced plates 113 are arranged at the connection between the vertical plates 111 and the horizontal plates 112, which helps to further enhance the strength and stiffness of the connection between the horizontal plates 112 and the vertical plates 111, preventing deformation or damage caused by uneven stress during construction. This design not only enhances the stability and load-bearing capacity of the adjusting frame structure, but also facilitates construction operations, providing reliable technical support for bridge construction.
[0023] In the embodiment, the through hole for single anchoring screw rod 13 penetration on the horizontal plate 112 adopts a strip-shaped hole. This design can provide more adjustment space for the anchoring screw rod, making it more flexible during installation and adjustment. That is, during construction, due to possible changes in the pile cap settlement or other changes, the strip-shaped hole design allows construction personnel to conveniently adjust and reposition the anchoring screw rod without disassembling the entire frame.
[0024] In the embodiment, the anchoring screw rod 13 is connected with a steel plate 14 at the end away from the adjusting frame 11, forming a larger stress surface. This design not only improves the connection strength between the anchoring screw rod and the upper or lower pile cap, but also effectively disperses the load applied on the screw rod, reducing the risk during construction and ensuring the smooth progress of bridge construction.
[0025] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application and are not limiting. Although the present application has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present application can be modified or replaced by equivalents without departing from the spirit and scope of the present application. They should all be included in the scope of the claims of the present application.
Claims
1. A multi-group connecting adjustable vertical temporary anchoring structure for a bridge flat-rotation system, characterized by, The temporary anchoring structure (1) is arranged between the upper bearing platform (2) and the lower bearing platform (3) of the bridge rotating system, and is arranged with a set of temporary anchoring structures (1) at each of the four corners of the upper bearing platform (2) before the rotating body, and each set of temporary anchoring structures (1) comprises an adjusting frame (11), a nut (12) and an anchoring screw (13), and the anchoring screw (13) anchored with the upper bearing platform (2) and the anchoring screw (13) anchored with the lower bearing platform (3) are adjustably connected to the adjusting frame (11) through the nut (12) at the corresponding end.
2. The multi-group connecting adjustable vertical temporary anchoring structure for the bridge flat-rotation system according to claim 1, characterized in that, The anchoring screws (13) on both sides of the adjusting frame (11) in each set of temporary anchoring structures (1) are arranged in at least three symmetrical groups.
3. The multi-group connecting adjustable vertical temporary anchoring structure for the bridge flat-rotation system according to claim 2, characterized in that, The adjusting frame (11) is composed of a plurality of vertical plates (111), horizontal plates (112) and reinforced plates (113), one horizontal plate (112) is arranged at the upper and lower ends between two adjacent vertical plates (111), and the reinforced plate (113) is arranged at the connection between the vertical plate (111) and the horizontal plate (112); the horizontal plate (112) is used for penetrating a single anchoring screw (13) and fastening the anchoring screw (13) with the nut (12).
4. The multi-group connecting adjustable vertical temporary anchoring structure for the bridge flat-rotation system according to claim 3, characterized in that, The through hole for penetrating a single anchoring screw (13) on the horizontal plate (112) is a strip-shaped hole.
5. The multi-group connection adjustable vertical temporary anchoring structure for the flat-rotation system of a bridge according to any one of claims 1-4, characterized in that, The anchoring screw (13) is connected with a steel plate (14) at the end away from the adjusting frame (11).