Building net for building construction
By flexibly adjusting the support column structure, the problem of fixing the dustproof net on uneven walls and construction sites was solved, achieving better protection and convenient installation and disassembly.
Patent Information
- Application Number
- CN202421703313.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2025-12-05
- Estimated Expiration
- 2034-07-17
AI Technical Summary
Existing dustproof nets are difficult to fix effectively on uneven walls or construction sites, resulting in poor protective performance.
The structure employs an adjustable support column, which combines a fixed cylinder and a fixed rod. The connection between the rod and the cylinder is secured using first and second fixing bolts, and the dustproof net is fixed using a locking assembly, adapting to the curvature of the wall or construction site.
The shape of the dustproof net can be flexibly adjusted, which improves the protection effect on uneven walls and construction sites, and facilitates quick disassembly and installation.
Smart Images

Figure CN223634376U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of building construction, and in particular to a building net for building construction. BACKGROUND
[0002] In recent years, China is developing towards urbanization, but at the same time of the population towards urbanization, the urban housing and transportation also face great pressure, so the housing construction and transportation construction are more and more, at the same time, the building construction site can be seen everywhere, but the building construction site has more dust, in order to avoid the dust floating in the air to cause pollution to the environment, people usually lay dustproof net in the building construction site.
[0003] The dustproof net can block the dust of the building construction site, and prevent the dust from floating to the surrounding environment. In the related art, the dustproof net needs to be fixed by the staff using iron frame, bamboo frame or wooden frame, but since the above supporting structure is difficult to change shape, the protection effect on some uneven wall surface or construction site is poor. CONTENT OF THE UTILITY MODEL
[0004] In order to improve the protection effect of the dustproof net on uneven wall surface or construction site, the present application provides a building net for building construction.
[0005] The building net for building construction provided by the present application adopts the following technical scheme:
[0006] A building net for building construction, comprising a plurality of spaced apart support columns, a dustproof net is arranged between adjacent two support columns, the support column comprises a base, a plurality of fixing cylinders and fixing rods are arranged above the base, the fixing cylinders and the fixing rods are spaced apart, a first fixing member for fixing the fixing rod in the fixing cylinder is arranged on the fixing cylinder, four through holes for inserting the fixing rod are arranged on the upper part of the fixing cylinder, the through holes are arranged around the axis of the fixing cylinder, and the opposite two through holes are located on the same straight line, a second fixing member for fixing the fixing rod on the fixing cylinder is arranged on the fixing cylinder, and a locking assembly for fixing the dustproof net on the fixing cylinder is arranged on the fixing cylinder.
[0007] According to the technical scheme, the number of the fixing rods and the fixing cylinders can be determined according to the wall surface or the construction site to be protected, then the fixing rods at appropriate positions are inserted into the through holes, the fixing rods inserted into the through holes are fixed by the second fixing members, the fixing rods inserted into the fixing cylinders are fixed by the first fixing assembly, the shape of the whole support column is fixed, then the dust screen is arranged between the two support columns, the dust screen is fixed between the two support columns by the control locking assembly, and the shape of the dust screen changes with the position of the fixing cylinder, so that the dust screen can adapt to the curvature of the wall surface or the construction site, and the protection effect of the dust screen is improved.
[0008] Optionally, the first fixing member is a first fixing bolt, the first fixing bolt passes through the side wall of the fixing cylinder and is threadedly connected to the fixing rod.
[0009] According to the technical scheme, the first fixing bolt is rotated to separate the rod part of the first fixing bolt from the fixing rod, so that the fixing cylinder and the fixing rod can be quickly disassembled.
[0010] Optionally, the second fixing member is a second fixing bolt, the second fixing bolt passes through the side wall of the fixing cylinder and is threadedly connected to the fixing rod.
[0011] According to the technical scheme, the second fixing bolt is rotated to separate the rod part of the second fixing bolt from the fixing rod, so that the fixing cylinder and the fixing rod can be quickly disassembled.
[0012] Optionally, the locking assembly comprises a pressing plate, the end of the dust screen is arranged between the pressing plate and the fixing cylinder, a plurality of locking bolts are threadedly connected to the pressing plate, the locking bolts pass through the pressing plate and the dust screen and are threadedly connected to the fixing cylinder.
[0013] According to the technical scheme, the locking bolt is rotated to drive the pressing plate to move and press the end of the dust screen on the side wall of the fixing cylinder through the pressing plate.
[0014] Optionally, the fixing rod is provided with a plurality of threaded holes arranged along the length direction of the fixing rod, the threaded holes are matched with the first fixing bolt and the second fixing bolt.
[0015] According to the technical scheme, the first bolt or the second bolt is threadedly connected to the appropriate threaded hole.
[0016] Optionally, a groove is arranged on the outer wall of the fixing cylinder corresponding to the pressing plate, and the pressing plate is arranged in the groove.
[0017] By adopting the technical scheme, the position of the pressing plate can be limited by the groove, and the stability of the pressing plate on the fixing cylinder is improved.
[0018] Optionally, two sides of the groove are provided with a dismounting groove, the dismounting groove is opened along the direction parallel to the axis of the fixing cylinder, and the dismounting groove is communicated with the groove.
[0019] By adopting the technical scheme, when the locking bolt is separated from the pressing plate, the pressing plate can be pushed in the dismounting groove, and the pressing plate is separated from the dismounting groove.
[0020] Optionally, a drainage groove is opened on the fixing cylinder, one end of the drainage groove is communicated with the bottom of the fixing cylinder, and the other end of the drainage groove is communicated with the groove.
[0021] By adopting the technical scheme, the accumulated water flow in the groove can be drained through the drainage groove, and the situation that the water flow is accumulated in the groove is reduced.
[0022] In summary, the present application has at least one of the following beneficial technical effects:
[0023] 1. The shape of the dust screen changes with the position of the fixing cylinder, so that the curvature of the wall surface or the construction site can be adapted, and the protection effect of the dust screen is improved;
[0024] 2. The locking bolt can be rotated to drive the pressing plate to move and press the end of the dust screen on the side wall of the fixing cylinder through the pressing plate;
[0025] 3. The accumulated water flow in the groove can be drained through the drainage groove, and the situation that the water flow is accumulated in the groove is reduced. BRIEF DESCRIPTION OF DRAWINGS
[0026] Figure 1 is a schematic diagram of the overall structure of the embodiment of the present application;
[0027] Figure 2 is Figure 1 is a local enlarged schematic diagram of part A in
[0028] Figure 3 is a schematic diagram of the structure of the groove of the embodiment of the present application.
[0029] In the figure, 1 is a support column, 11 is a base, 12 is a fixing rod, 121 is a threaded hole, 13 is a fixing cylinder, 131 is a first fixing part, 132 is a through hole, 133 is a second fixing part, 134 is a groove, 135 is a dismounting groove, 136 is a drainage groove, 2 is a dust screen, 3 is a locking assembly, 31 is a pressing plate, and 32 is a locking bolt. DETAILED DESCRIPTION
[0030] The following will be described in combination with the drawingsFigure 1 -attached Figure 3 , the present application is further described in detail.
[0031] Embodiments of the present application are: a building net for building construction, referring to Figure 1 , comprising a plurality of spaced support columns 1, which are provided as two in this embodiment. Between the two support columns 1, the same dustproof net 2 is provided.
[0032] Referring to Figure 1 and Figure 2 , the support column 1 comprises a base 11, which is placed on the ground. A plurality of fixing cylinders 13 and fixing rods 12 are provided above the base 11. The fixing cylinders 13 and the fixing rods 12 are spaced apart. Some of the fixing rods 12 are slidingly inserted into the fixing cylinders 13, and the length direction of the fixing rods 12 is parallel to the axis direction of the fixing cylinders 13. The fixing cylinder 13 is provided with a first fixing member 131 for fixing the fixing rod 12 slidingly inserted into the fixing cylinder 13 in the fixing cylinder 13.
[0033] In this embodiment, the first fixing member 131 is provided as a first fixing bolt. A plurality of threaded holes are provided on the side wall of the fixing rod 12, which are equidistantly arranged along the length direction of the fixing rod 12. The rod portion of the first fixing bolt passes through the side wall of the fixing cylinder 13 and is threadedly connected into one of the plurality of threaded holes 121.
[0034] The cross section of the fixing cylinder 13 is provided as a cuboid. The upper part of the fixing cylinder 13 is provided with four through holes 132 for inserting the fixing rod 12. The through holes 132 are provided on each side wall of the fixing cylinder 13, and the opposite two through holes 132 are located on the same straight line. The fixing cylinder 13 is provided with a second fixing member 133 for fixing the fixing rod 12 inserted into the through hole 132 on the fixing cylinder 13. The length direction of the fixing rod 12 inserted into the through hole 132 is perpendicular to the length direction of the fixing cylinder 13.
[0035] In this embodiment, the second fixing member 133 is provided as a second fixing bolt. The second fixing bolt passes through the side wall of the fixing cylinder 13 and is threadedly connected into one of the plurality of threaded holes 121 on the fixing rod 12.
[0036] Referring to Figure 1 , Figure 2 and Figure 3The fixing cylinder 13 is provided with a locking assembly 3 for fixing the dustproof net 2 on the fixing cylinder 13. The locking assembly 3 comprises a pressing plate 31, and a groove 134 is formed on the outer wall of the fixing cylinder 13 corresponding to the pressing plate 31, and the pressing plate 31 is arranged in the groove 134. The end of the dustproof net 2 is arranged between the pressing plate 31 and the fixing cylinder 13, and the pressing plate 31 presses the dustproof net 2 in the groove 134. Two locking bolts 32 are threadedly connected to the pressing plate 31, and the locking bolts 32 pass through the pressing plate 31 and the dustproof net 2 and are threadedly connected to the fixing cylinder 13.
[0037] Further, the locking bolt 32 can be rotated to make the rod of the locking bolt 32 out of the groove 134, and then the pressing plate 31 is removed from the groove 134, so that the fixing of the dustproof net 2 on the fixing cylinder 13 is cancelled. At the same time, in order to facilitate the pressing plate 31 to be removed from the groove 134,
[0038] The two sides of the groove 134 are provided with dismounting grooves 135, the dismounting grooves 135 are formed along the direction parallel to the axis of the fixing cylinder 13, and the dismounting grooves 135 are communicated with the groove 134. In order to reduce the accumulation of water flow in the groove 134, a drainage groove 136 is formed on the fixing cylinder 13, the drainage groove 136 is provided in two, one end of the drainage groove 136 is communicated with the bottom of the fixing cylinder 13, and the other end of the drainage groove 136 is communicated with the groove 134 and the dismounting grooves 135.
[0039] The implementation principle of the embodiment of the application is that the number of the fixing rods 12 and the fixing cylinders 13 is determined according to the wall surface or the construction site that needs to be protected, and then the fixing rod 12 at a proper position is inserted into the through hole 132 or the fixing rod 12 at a proper position is inserted into the fixing cylinder 13 according to the curvature of the wall surface or the situation of the construction site.
[0040] Then, the fixing rod 12 inserted into the fixing cylinder 13 is fixed by the first fixing bolt, and the fixing rod 12 inserted into the through hole 132 is fixed by the second fixing bolt, so that the shape of the whole support column 1 is fixed. Then, the dustproof net 2 is arranged between the two support columns 1, and the end of the dustproof net 2 is arranged in the groove 134. Then, the pressing plate 31 is fixed by the locking bolt 32, so that the end of the dustproof net 2 is pressed in the groove 134 by the pressing plate 31, and the dustproof net 2 is fixed between the two support columns 1.
[0041] The embodiments of the specific embodiment are the preferred embodiments of the application, and are not limited to the protection scope of the application, wherein the same parts are indicated by the same reference numerals. Therefore, any equivalent changes made according to the structure, shape and principle of the application should be covered in the protection scope of the application.
Claims
1. A construction net for use in construction work, characterized in that The utility model provides a dust screen, including a plurality of interval arrangement support column (1), be equipped with dust screen (2) between two adjacent support column (1), support column (1) includes base (11), a plurality of fixed cylinder (13) and fixed rod (12) are equipped on the top of base (11), fixed cylinder (13) and fixed rod (12) interval arrangement, be equipped with first fixed part (131) for the fixed rod (12) is fixed in the fixed cylinder (13) on fixed cylinder (13), the upper portion of fixed cylinder (13) is provided with four through -hole (132) for the fixed rod (12) is inserted, the through -hole (132) is around the axis of fixed cylinder (13) setting, and opposite two through -hole (132) are on the same straight line, be equipped with second fixed part (133) for the fixed rod (12) is fixed on the fixed cylinder (13) on the through -hole (132) at fixed cylinder (13), be equipped with locking assembly (3) for dust screen (2) is fixed on the fixed cylinder (13) on fixed cylinder (13).
2. The construction net according to claim 1, wherein The first fixed part (131) is set as a first fixed bolt, the first fixed bolt passes through the side wall of the fixed cylinder (13) and is threadedly connected on the fixed rod (12).
3. The construction net according to claim 2, wherein The second fixed part (133) is set as a second fixed bolt, the second fixed bolt passes through the side wall of the fixed cylinder (13) and is threadedly connected on the fixed rod (12).
4. The construction net according to claim 3, wherein The locking assembly (3) includes a pressing plate (31), the end of the dust screen (2) is arranged between the pressing plate (31) and the fixed cylinder (13), a plurality of locking bolts (32) are threadedly connected on the pressing plate (31), the locking bolts (32) pass through the pressing plate (31) and the dust screen (2) and are threadedly connected on the fixed cylinder (13).
5. The construction net according to claim 4, wherein The fixed rod (12) is provided with a plurality of threaded holes (121) arranged along the length direction of the fixed rod (12), and the threaded holes (121) are matched with the first fixed bolt and the second fixed bolt.
6. The construction net according to claim 4, wherein The outer wall of the fixed cylinder (13) opposite to the pressing plate (31) is provided with a groove (134), and the pressing plate (31) is arranged in the groove (134).
7. The construction net according to claim 6, wherein The two sides of the groove (134) are provided with dismounting grooves (135), the dismounting grooves (135) are arranged along the direction parallel to the axis of the fixed cylinder (13), and the dismounting grooves (135) are communicated with the groove (134).
8. The construction net according to claim 7, wherein The fixed cylinder (13) is provided with a drainage groove (136), one end of the drainage groove (136) is communicated with the bottom of the fixed cylinder (13), and the other end of the drainage groove (136) is communicated with the groove (134).