Municipal engineering drainage open channel construction fixing device
By designing a fixed device for the construction of drainage open channels in municipal engineering, and utilizing a combination of movable clamps and ground-inserting drill bits, the problem of inconvenient pipe fixing was solved, achieving rapid positioning and stabilization, and improving construction efficiency and stability.
Patent Information
- Application Number
- CN202423180589.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-12-09
- Estimated Expiration
- 2034-12-23
AI Technical Summary
When constructing drainage open channels in existing municipal engineering projects, it is inconvenient to fix the pipes and difficult to quickly position them, resulting in installation deviation, which makes the construction difficult and inefficient.
A construction fixing device for municipal engineering drainage open channel was designed, which includes a construction platform, reinforcement components and clamping structure. The pipe is clamped by the cooperation of movable clamps and fixed clamps, and the device is stabilized in the construction position by a ground-inserting drill bit.
It enables convenient fixing and stable positioning of pipelines, improves construction efficiency, prevents pipeline deviation, and enhances the stability and flexibility of construction.
Smart Images

Figure CN223647173U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to municipal engineering technical field more specifically, it relates to a municipal engineering drainage open channel construction fixing device. BACKGROUND
[0002] The open channel is a kind of channel with free surface (surface each point is acted on by atmospheric pressure) water flow. According to its formation, it can be divided into natural open channel and artificial open channel. The former is like natural river channel, and the latter is like artificial water delivery channel, canal and pipe not filled with water flow etc. When municipal engineering drainage open channel is constructed, the pipe needs to be installed. When the existing municipal engineering drainage open channel is constructed, it is difficult to quickly fix the position of the pipe, so that positioning is difficult during installation, and deviation is prone to occur, so that the construction difficulty is great, and the working efficiency is low, and the existing pipe fixing device is inconvenient when fixing the pipe. In order to solve the above problems, the following device is proposed. UTILITY MODEL CONTENTS
[0003] (1) technical problem to be solved
[0004] In view of the deficiencies in the prior art, the utility model aims at providing a municipal engineering drainage open channel construction fixing device, which has the characteristics of facilitating pipe movement and fixing pipe during pipe construction.
[0005] (2) technical scheme
[0006] In order to achieve the above-mentioned purpose, the utility model provides a municipal engineering drainage open channel construction fixing device, which comprises a construction table, further comprises a reinforcing assembly, an adjusting groove is formed in the construction table, a movable table is slidably sleeved in the adjusting groove, a movable clamp is fixedly arranged above the movable table, a fixed clamp is arranged on the other side of the movable clamp on the construction table, the movable clamp and the fixed clamp are both arc-shaped structures and are symmetrically arranged, a bearing is fixedly sleeved in the surface of the construction table and penetrates the adjusting groove, a rotating shaft is arranged in the bearing, a second handle is fixedly connected to the outer end of the rotating shaft, a second screw rod is fixedly connected to the inner end of the rotating shaft, a screw pipe is threadedly sleeved with the front end of the second screw rod, and the front end of the screw pipe is fixedly connected to the surface of the movable table.
[0007] Further, the reinforcing assembly comprises an extension table fixedly arranged on the side edge of the construction table, a nut is vertically and perpendicularly sleeved on the extension table, a first screw rod is threadedly sleeved in the nut, a first handle is fixedly connected to the upper end of the first screw rod, and a ground drill bit is fixedly connected to the lower end of the first screw rod.
[0008] Further, the reinforcing assembly has four groups, and is symmetrically distributed in the form of rectangle on the two sides of the construction table.
[0009] Further, two symmetrical grooves are arranged in the adjusting groove, and sliding blocks are fixedly arranged on two sides of the movable table and are slidingly connected in the grooves.
[0010] Further, four moving wheels are arranged in a rectangular shape below the construction table, and brake pads are arranged on the moving wheels.
[0011] (3) Beneficial effects
[0012] In summary, the utility model has the following beneficial effects:
[0013] 1. The municipal engineering drainage open channel construction fixing device, by setting up second screw rod, screw pipe and movable table, when needing to support and fix the pipeline, only need to place the pipeline between the movable clamp and the fixed clamp, then rotate the second handle, thereby driving the second screw rod to rotate, under the cooperation of the second screw rod and the screw pipe, thereby driving the movable table and the movable clamp to move inward, when the movable clamp and the fixed clamp are close to the pipeline, can clamp and fix the pipeline through the two clamps, and because the position of the movable clamp can be adjusted, the device can support and fix the pipeline, improve the versatility of the device when in use.
[0014] 2. The municipal engineering drainage open channel construction fixing device, by setting up the reinforcing assembly, in the process of pipeline construction, the worker can rotate the first handle, thereby driving the first screw rod to rotate, under the cooperation of the first screw rod and the nut, thereby driving the earth boring bit to rotate and move downward at the same time, thereby inserting the earth boring bit into the ground, and then stably fixing the device at the construction position through the earth boring bit, effectively preventing the pipeline from deviating. BRIEF DESCRIPTION OF DRAWINGS
[0015] In order to more clearly illustrate the specific embodiments of the utility model or the technical solutions in the prior art, the following will briefly introduce the drawings needed to be used in the description of the specific embodiments or the prior art. Obviously, the drawings in the following description are only one embodiment of the utility model, and those skilled in the art can obtain other drawings according to these drawings without creative labor.
[0016] Fig. 1 It is a partial sectional view of the utility model structure schematic diagram;
[0017] Fig. 2 It is a whole structure schematic diagram of the utility model;
[0018] Fig. 3 It is a reinforcing assembly structure schematic diagram of the utility model.
[0019] The marks in the drawings are:
[0020] 1, construction platform; 2, reinforcing assembly; 201, extension platform; 202, nut; 203, first screw rod; 204, first handle; 205, ground drill; 3, adjusting groove; 4, movable platform; 5, movable clamp; 6, fixed clamp; 7, bearing; 8, rotating shaft; 9, second handle; 10, second screw rod; 11, screw pipe; 12, sliding block; 13, sliding groove; 14, moving wheel; 15, brake pad. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, purposes and effects of the utility model easy to understand, the technical solutions in the specific embodiments of the utility model are described clearly and completely below to further illustrate the utility model. Obviously, the described specific embodiments are only a part of the embodiments of the utility model, not all.
[0022] Embodiment:
[0023] The following will be combined with the drawings Figs. 1-3 The utility model is further described in detail.
[0024] Please refer to Figs. 1-3 The utility model provides a kind of technical scheme: a municipal engineering drainage open channel construction fixing device, including construction platform 1, still including reinforcing assembly 2, one adjusting groove 3 is opened in construction platform 1, movable platform 4 is slidably fitted in adjusting groove 3, the upper portion of movable platform 4 is fixedly provided with movable clamp 5, fixed clamp 6 is provided on the other side of movable clamp 5 of construction platform 1, movable clamp 5 and fixed clamp 6 are arc structure and symmetrically arranged, bearing 7 is fixedly fitted on the surface of construction platform 1 in adjusting groove 3, rotating shaft 8 is arranged in bearing 7, second handle 9 is fixedly connected to the outer end of rotating shaft 8, second screw rod 10 is fixedly connected to the inner end of rotating shaft 8, screw pipe 11 is threadedly fitted in the front end of second screw rod 10, and the front end of screw pipe 11 is fixedly connected to the surface of movable platform 4.
[0025] By adopting the above technical scheme, when the pipe needs to be supported and fixed, the pipe is only needed to be placed between movable clamp 5 and fixed clamp 6, then second handle 9 is rotated, thereby driving second screw rod 10 to rotate, under the cooperation of second screw rod 10 and screw pipe 11, movable platform 4 and movable clamp 5 are driven to move inward, when movable clamp 5 and fixed clamp 6 are tightly attached to the pipe, the pipe can be clamped and fixed by the two clamps, and since the position of movable clamp 5 can be adjusted, the device can support and fix the pipe, improving the versatility of the device when used.
[0026] Specifically, the reinforcing assembly 2 comprises an extension table 201 fixedly arranged at the side of the construction table 1, a screw nut 202 vertically penetrates the extension table 201, a first screw rod 203 is threadedly sleeved in the screw nut 202, the upper end of the first screw rod 203 is fixedly connected with a first handle 204, and the lower end of the first screw rod 203 is fixedly connected with a ground drill bit 205.
[0027] By adopting the above technical scheme, in the process of pipeline construction, the worker rotates the first handle 204 to drive the first screw rod 203 to rotate, under the cooperation of the first screw rod 203 and the screw nut 202, the ground drill bit 205 is driven to rotate and move downward at the same time, the ground drill bit 205 is inserted into the ground, and then the device is stably fixed at the construction position through the ground drill bit 205, so that the pipeline is effectively prevented from deviating.
[0028] Specifically, the four reinforcing assemblies 2 are symmetrically distributed in a rectangular shape at the two sides of the construction table 1, and the four reinforcing assemblies 2 provide reinforcing effect around the construction table 1, further improving the stability of the device and the pipeline.
[0029] Specifically, two sliding grooves 13 are symmetrically arranged in the adjusting groove 3, and sliding blocks 12 are fixedly arranged at the two sides of the movable table 4 and slidably connected in the sliding grooves 13, so that the movable table 4 can stably move in a direction.
[0030] Specifically, four moving wheels 14 are arranged in a rectangular shape at the lower side of the construction table 1, and brake blocks 15 are arranged on the moving wheels 14, so that the device can be easily pushed to move with the pipeline, improving the flexibility of the pipeline during transfer.
[0031] The working principle of the device is as follows: first, the pipeline is placed between the movable clamp 5 and the fixed clamp 6, then the second handle 9 is rotated to drive the second screw rod 10 to rotate, under the cooperation of the second screw rod 10 and the screw pipe 11, the movable table 4 and the movable clamp 5 are driven to move inward, when the movable clamp 5 and the fixed clamp 6 are tightly attached to the pipeline, the two clamps can clamp and fix the pipeline, then the device is pushed to move with the pipeline to the construction site through the moving wheels 14, and the pipeline is aligned with the construction position, then the four first handles 204 are rotated by the worker to drive the first screw rod 203 to rotate, under the cooperation of the first screw rod 203 and the screw nut 202, the ground drill bit 205 is driven to rotate and move downward at the same time, the ground drill bit 205 is inserted into the ground, and then the device is stably fixed at the construction position through the ground drill bit 205, effectively preventing the pipeline from deviating, and then the pipeline can be stably constructed.
[0032] The specific embodiment is only an explanation of the utility model, and is not a limitation of the utility model, and a modification without creative contribution can be made to the embodiment according to needs by a person skilled in the art after reading the specification, but as long as the modification is within the scope of the claims of the utility model, the utility model is protected by the patent law.
Claims
1. A kind of municipal engineering drainage channel construction fixing device, including construction platform (1), it is characterized by: Also include reinforcement components (2), the construction platform (1) is provided with an adjusting groove (3), the adjusting groove (3) is slidably sleeved with a movable platform (4), the movable platform (4) is fixedly provided with a movable clamp (5) above, the construction platform (1) is provided with a fixed clamp (6) on the other side of the movable clamp (5), the movable clamp (5) and the fixed clamp (6) are arc-shaped structure and symmetrically arranged, the surface of the construction platform (1) is fixedly sleeved with a bearing (7) through the adjusting groove (3), the bearing (7) is provided with a rotating shaft (8), the outer end of the rotating shaft (8) is fixedly connected with a second handle (9), the inner end of the rotating shaft (8) is fixedly connected with a second screw (10), the front end of the second screw (10) is threadedly sleeved with a screw pipe (11), the front end of the screw pipe (11) is fixedly connected with the surface of the movable platform (4).
2. The municipal engineering drainage channel construction fixing device according to claim 1, characterized in that: The reinforcement components (2) include an extension platform (201) fixedly arranged on the side of the construction platform (1), a nut (202) is vertically sleeved on the extension platform (201), a first screw (203) is threadedly sleeved in the nut (202), a first handle (204) is fixedly connected with the upper end of the first screw (203), and a ground drilling bit (205) is fixedly connected with the lower end of the first screw (203).
3. The municipal engineering drainage channel construction fixing device according to claim 2, characterized in that: The reinforcement components (2) are four groups in total and are symmetrically distributed in a rectangular shape on both sides of the construction platform (1).
4. The municipal engineering drainage channel construction fixing device according to claim 1, characterized in that: Two symmetrical sliding grooves (13) are formed in the adjusting groove (3), and sliding blocks (12) are fixedly arranged on both sides of the movable platform (4) and slidably connected in the sliding grooves (13).