Hydraulic engineering construction protection slope

By designing lightweight slope protection blocks and fixing structures, the problems of difficult transportation and installation of existing water conservancy project slope protection have been solved, achieving convenient construction and efficient fixing.

CN223660769UActive Publication Date: 2025-12-12于淑荣
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520260679.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-19
Publication Date
2025-12-12
Estimated Expiration
2035-02-19

AI Technical Summary

Technical Problem

Existing water conservancy projects have fixed slope protection structures that are large in size and heavy in weight, making transportation and installation time-consuming and labor-intensive, thus prolonging the construction period.

Method used

The design incorporates a combination of slope protection blocks, connecting blocks, installation grooves, and threaded soil-breaking cones. The slope protection blocks are small in size and lightweight, and are fixed to the riverbank by connecting blocks and threaded soil-breaking cones, simplifying the construction process.

Benefits of technology

It enables convenient transportation and rapid installation of slope protection blocks, adapts to different riverbank shapes, reduces construction time, and improves slope protection effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223660769U_ABST
    Figure CN223660769U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of hydraulic engineering construction, and discloses a hydraulic engineering construction protection slope which comprises a protection slope block, water guide grooves are formed in the two sides of the top of the protection slope block, an installation groove is formed in the outer side of the top of the protection slope block, an arc-shaped groove is formed in the bottom of the installation groove, and a connecting block is clamped in the installation groove. A fixing groove is formed in the top of the connecting block, a threaded hole is formed in the bottom of the connecting block, a threaded soil breaking cone is in threaded connection with the interior of the threaded hole, a rotary knob is fixedly connected to the top of the threaded soil breaking cone, and a handle is fixedly connected to the top of the rotary knob. The slope protection blocks are small in size, light in weight and convenient to carry, and the multiple slope protection blocks can be spliced and fixed together by clamping the connecting blocks into the corresponding mounting grooves, so that the slope protection blocks can adapt to river banks of different shapes, workers can conveniently conduct construction and mounting, and the construction period is greatly shortened.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to water conservancy construction slope protection technical field, concretely is a water conservancy construction slope protection. BACKGROUND

[0002] Water conservancy construction is the engineering for eliminating water damage and developing and utilizing water resources, and the slope protection refers to the various paving and planting on the slope surface to prevent the slope from being eroded, the concave bank of the river section at the bridge site, which receives the water flow year by year, will make the river bank collapse continuously, and the protective building must be built on the concave bank to protect the safety of the bridge and the embankment.

[0003] The existing water conservancy construction slope protection is usually fixed in structure, large in volume and high in weight, and needs the staff to move the slope protection to the river bank, so that the construction installation can be carried out, which greatly prolongs the construction period and is inconvenient for the staff to use. UTILITY MODEL CONTENT

[0004] In view of the defects of the prior art, the utility model provides a water conservancy construction slope protection to solve the problems that the existing water conservancy construction slope protection is usually fixed in structure, large in volume and high in weight, needs the staff to move the slope protection to the river bank, so that the construction installation can be carried out, which greatly prolongs the construction period and is inconvenient for the staff to use.

[0005] To achieve the above purpose, the utility model provides the following technical scheme: a water conservancy construction slope protection, including the slope protection block, the surface middle part of the slope protection block is equipped with the planting groove, the both sides of the top of the slope protection block are equipped with the water guide groove, the outside of the top of the slope protection block is equipped with the installation groove, the bottom of the installation groove is equipped with the arc groove, the inside of the installation groove is connected with the connecting block, the top of the connecting block is equipped with the fixed groove, the bottom of the connecting block is equipped with the threaded hole, the inside screw thread of the threaded hole is connected with the threaded soil breaking cone, the top of the threaded soil breaking cone is fixedly connected with the knob, the top of the knob is fixedly connected with the handle.

[0006] Preferably, the number of the installation grooves is several, the several installation grooves are arranged in the annular array on the top surface of the slope protection block with the planting groove as the center, and the spacing of the several installation grooves is the same.

[0007] Preferably, the shape and size of the connecting block are matched with the shape and size of the installation groove, and the connecting block is tightly combined with the inner wall of the installation groove.

[0008] By means of the technical scheme, the connecting block is clamped into the corresponding installation slot, so that two slope protection blocks are spliced and fixed together, thereby the riverbank of different shapes can be adapted, the staff can conveniently perform construction and installation, and the construction period is greatly reduced.

[0009] Preferably, the diameter of the thread soil breaking cone is matched with the length of the arc-shaped slot, and the thread soil breaking cone penetrates through the arc-shaped slot and extends to the back side of the bottom of the slope protection block.

[0010] By means of the technical scheme, the thread soil breaking cone is penetrated through the threaded hole and the arc-shaped slot, and is screwed into the deep soil layer of the riverbank by means of the knob, so that the slope protection block is firmly fixed on the surface of the riverbank without the aid of tools, the slope protection effect is improved, and the slope protection block is convenient to use.

[0011] Preferably, the diameter of the knob is matched with the diameter of the fixing slot, and the knob is tightly combined with the inside of the fixing slot.

[0012] Preferably, the slope protection block is made of corrosion-resistant engineering plastic.

[0013] By means of the technical scheme, the slope protection block is made of corrosion-resistant engineering plastic, has small volume and light weight, and is convenient for the staff to carry and use.

[0014] Compared with the prior art, the slope protection block has the following beneficial effects:

[0015] 1. The slope protection block for water conservancy construction is convenient to carry and use, and can be spliced and fixed together with other slope protection blocks, thereby the riverbank of different shapes can be adapted, the staff can conveniently perform construction and installation, and the construction period is greatly reduced.

[0016] 2. The slope protection block for water conservancy construction is convenient to use, and can be firmly fixed on the surface of the riverbank without the aid of tools, thereby the slope protection effect is improved. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 is a front view structural schematic diagram of the utility model;

[0018] Figure 2 is a slope protection block splicing structural schematic diagram of the utility model;

[0019] Figure 3 It is the utility model connecting block structure schematic diagram.

[0020] Figure 4 It is the utility model connecting block structure schematic diagram.

[0021] Figure 5 It is the utility model connecting block structure schematic diagram.

[0022] In the figure: 1, the slope protection block;2, planting groove;3, water guide groove;4, installation groove;5, arc groove;6, connecting block;7, thread hole;8, fixed groove;9, thread soil breaking cone;10, knob;11, handle. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the utility model will be described clearly and completely below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0024] Embodiment 1:

[0025] Please refer to Figs. 1-4, a water conservancy construction slope protection, including slope protection block 1, the surface of slope protection block 1 middle is provided with planting groove 2, slope protection block 1 is made of corrosion-resistant engineering plastic, the top of slope protection block 1 both sides is provided with water guide groove 3, the top of slope protection block 1 outside is provided with installation groove 4, the number of installation groove 4 is several, several installation groove 4 is arranged in the top surface of slope protection block 1 with planting groove 2 as the center, and is annular array, and the spacing of several installation groove 4 is same, the bottom of installation groove 4 is provided with arc groove 5, the inside of installation groove 4 is connected with connecting block 6, the shape and size of connecting block 6 are matched with the shape and size of installation groove 4, and connecting block 6 and the inner wall of installation groove 4 are closely combined, the top of connecting block 6 is provided with fixed groove 8, the bottom of connecting block 6 is provided with thread hole 7, the inside of thread hole 7 is connected with thread soil breaking cone 9, the top of thread soil breaking cone 9 is fixedly connected with knob 10, the top of knob 10 is fixedly connected with handle 11.

[0026] Principle: when using, the worker carries the revetment block 1 to the riverbank to be laid, at this time the worker aligns multiple revetment blocks 1 with each other and sequentially adheres to the riverbank surface, and makes the water guide layer of the revetment block 1 upward, so that the riverbank of different shapes can be adjusted, at this time the worker sequentially clamps the connecting block 6 into the mounting groove 4 on the surface of the two adjacent revetment blocks 1, so as to splice multiple revetment blocks 1 into a whole, at this time the worker sequentially passes the screw earth breaking cone 9 through the threaded hole 7 on the connecting block 6 and the arc-shaped groove 5 on the revetment block 1, and rotates the knob 10 through the handle 11, so as to rotate the screw earth breaking cone 9 into the soil layer of the riverbank, and make the knob 10 clamp into the fixing groove 8, so as to firmly fix the revetment block 1 on the surface of the riverbank, without the aid of tools, improve the revetment effect, and facilitate the worker to use.

[0027] Compared with the related art, the water conservancy construction revetment provided by the utility model has the following beneficial effects: through cooperation of the revetment block 1, the connecting block 6 and the mounting groove 4, the revetment block 1 is small in size and light in weight, convenient to carry, multiple revetment blocks 1 can be spliced and fixed together by clamping the connecting block 6 into the corresponding mounting groove 4, so as to adapt to riverbanks of different shapes, facilitate the worker to construct and install, and greatly reduce the construction period.

[0028] Embodiment 2:

[0029] Please refer to Figs. 1-5, the top outer side of the revetment block 1 is provided with the mounting groove 4, the bottom of the mounting groove 4 is provided with the arc-shaped groove 5, the inside of the mounting groove 4 is clamped with the connecting block 6, the bottom of the connecting block 6 is provided with the threaded hole 7, the inside of the threaded hole 7 is threadedly connected with the screw earth breaking cone 9, the diameter of the screw earth breaking cone 9 is adapted to the length of the arc-shaped groove 5, and the screw earth breaking cone 9 penetrates the arc-shaped groove 5 and extends to the bottom rear side of the revetment block 1, the top of the screw earth breaking cone 9 is fixedly connected with the knob 10, the diameter of the knob 10 is adapted to the diameter of the fixing groove 8, and the knob 10 is tightly adhered to the inside of the fixing groove 8, and the top of the knob 10 is fixedly connected with the handle 11.

[0030] Principle: when using, the worker rotates the knob 10 through holding the handle 11, so as to rotate the screw earth breaking cone 9 into the soil layer of the riverbank, and make the knob 10 clamp into the fixing groove 8, so as to firmly fix the revetment block 1 on the surface of the riverbank, without the aid of tools, improve the revetment effect, and facilitate the worker to use.

[0031] Compared with the prior art, the utility model provides a kind of water conservancy project construction revetment with following beneficial effects: by being used with thread hole 7 in the cooperation of thread soil breaking cone 9, arc-shaped groove 5 etc., thread soil breaking cone 9 is passed through thread hole 7 and arc-shaped groove 5, and thread soil breaking cone 9 is screwed into the soil layer deep place of river bank by knob 10, without the aid of tool, revetment block 1 can be firmly fixed on the surface of river bank, improve the revetment effect, it is convenient to use.

[0032] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A hydraulic construction slope protection comprising slope protection blocks (1), characterized in that: The surface of the slope protection block (1) is provided with a planting groove (2), the top of the slope protection block (1) is provided with a water guide groove (3) on both sides, the top of the slope protection block (1) is provided with a mounting groove (4) on the outside, the bottom of the mounting groove (4) is provided with an arc-shaped groove (5), the inside of the mounting groove (4) is connected with a connecting block (6), the top of the connecting block (6) is provided with a fixing groove (8), the bottom of the connecting block (6) is provided with a threaded hole (7), the inside of the threaded hole (7) is connected with a threaded soil breaking cone (9), the top of the threaded soil breaking cone (9) is fixedly connected with a knob (10), and the top of the knob (10) is fixedly connected with a handle (11).

2. The hydraulic engineering construction slope protection according to claim 1, characterized in that: The number of the mounting grooves (4) is several, the several mounting grooves (4) are arranged in a ring array on the top surface of the slope protection block (1) with the planting groove (2) as the center, and the spacing of the several mounting grooves (4) is the same.

3. The hydraulic engineering construction slope protection according to claim 1, characterized in that: The shape and size of the connecting block (6) are matched with those of the mounting groove (4), and the connecting block (6) is tightly attached to the inner wall of the mounting groove (4).

4. The hydraulic engineering construction slope protection according to claim 1, characterized in that: The diameter of the threaded soil breaking cone (9) is matched with the length of the arc-shaped groove (5), and the threaded soil breaking cone (9) penetrates through the arc-shaped groove (5) and extends to the bottom rear side of the slope protection block (1).

5. The hydraulic engineering construction slope protection according to claim 1, characterized in that: The diameter of the knob (10) is matched with the diameter of the fixing groove (8), and the knob (10) is tightly attached to the inside of the fixing groove (8).

6. The hydraulic engineering construction slope protection according to claim 1, characterized in that: The slope protection block (1) is made of corrosion-resistant engineering plastic.