Maintenance structure for pipe gallery foundation pit excavation

The design of the ring positioning column for the arc-shaped maintenance plate and connecting plate solves the problem of the difficulty in combining existing steel sheet piles in the arc-shaped pipe gallery environment, and achieves flexible connection and stable effect.

CN223660848UActive Publication Date: 2025-12-12ZHENTIAN CONSTR GRP CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423150472.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-12-12
Estimated Expiration
2034-12-19

AI Technical Summary

Technical Problem

Existing sheet pile cladding structures are not suitable for curved pipe gallery environments and are difficult to combine and connect flexibly.

Method used

It adopts an arc-shaped maintenance plate and connecting plate design, and achieves flexible angle adjustment through collars and positioning columns, and is reinforced with connecting ropes to form a straight or closed circular tube structure.

Benefits of technology

It enables flexible combination and use in different construction environments, improving connection stability and practicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223660848U_ABST
    Figure CN223660848U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of steel sheet piles, in particular to a maintenance structure for excavation of a pipe gallery foundation pit. The maintenance structure for excavation of the pipe gallery foundation pit is convenient to flexibly combine and use. The device comprises a maintenance plate, connecting sleeves, connecting ropes, adjusting pieces and the like, the connecting sleeves are arranged on the inner side of the connecting plate in a vertically symmetrical mode, the connecting ropes are arranged on the connecting sleeves in a penetrating mode, and the adjusting pieces which can be connected and combined with each other are arranged between the maintenance plate and the connecting plate. Through a connecting structure formed by combining lantern rings and positioning columns arranged between the connecting plates and the connecting sleeves, the purpose of flexibly adjusting the angle of the connecting plates and the connecting sleeves which are connected with each other can be achieved, then flexible and convenient use according to the environment of a construction site is facilitated, and practicability is high; and through series combination of the connecting ropes and the lantern rings, the connecting plates and the connecting sleeves which are connected with each other can be reinforced, and then the stability of connection and combination of the connecting plates and the connecting sleeves can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to steel sheet pile technical field, concretely is a kind of maintenance structure of pipe gallery foundation pit excavation. BACKGROUND

[0002] In the process of foundation pit excavation, in order to ensure the stability of foundation pit slope and construction safety, the support maintenance structure for providing security needs to be taken. The selection of maintenance structure should be considered comprehensively according to the factors such as foundation pit excavation depth, geological conditions, surrounding environment. Common support structure includes bench excavation, soil nailing wall enclosure, Larsen steel sheet pile enclosure, bored pile enclosure, etc.

[0003] Through retrieval, a kind of authorized announcement number for CN219343142U utility model patent, its authorized announcement date is July 14, 2023, discloses a combined steel sheet pile enclosure structure, including steel sheet, the side outer wall of the steel sheet is fixedly connected with mounting box, the side outer wall of the steel sheet is fixedly connected with multiple positioning pins, the side outer wall of the steel sheet away from positioning pin is equipped with connecting groove, the specification of connecting groove and the specification of mounting box are matched, the both sides inner walls of connecting groove are all equipped with limiting slot, the side outer wall of the steel sheet is equipped with multiple positioning slots, and the specification of positioning slot and the specification of positioning pin are matched. Although the device is connected by the cooperation of steel sheet, mounting box and positioning pin, multiple steel sheets are horizontally combined, but since the device can only be connected horizontally, it is not suitable for use in arc-shaped pipe gallery environment, and has certain limitations.

[0004] In view of this, a kind of maintenance structure of pipe gallery foundation pit excavation is proposed, which is convenient to flexibly combine, to solve the above technical problems. UTILITY MODEL CONTENTS

[0005] In order to overcome the shortcomings of the existing steel sheet pile maintenance structure, which is relatively simple and not convenient for flexible connection and combination, the technical problem to be solved by the utility model is to provide a maintenance structure of pipe gallery foundation pit excavation, which is convenient to flexibly combine.

[0006] A kind of maintenance structure of pipe gallery foundation pit excavation, including maintenance plate and connecting plate, the side of the maintenance plate is provided with connecting plate, further including connecting sleeve, connecting rope and adjusting part, the inside of the connecting plate is symmetrically provided with connecting sleeve up and down, the connecting sleeve is provided with connecting rope, the adjusting part that can be connected and combined with each other is provided between the maintenance plate and the connecting plate, the adjusting part includes sleeve ring and positioning column, the side of the connecting plate is equipped with accommodating groove, the sleeve ring is provided in the accommodating groove, the other side of the maintenance plate is provided with positioning column, and the sleeve ring can be sleeved on the corresponding positioning column, so that different groups of the maintenance plate and connecting plate can be connected and combined with each other.

[0007] Further, the maintenance plate is designed in an arc structure.

[0008] Further, each of the maintenance plate and the connecting plate can be combined into a character-shaped structure.

[0009] Further, each of the maintenance plate and the connecting plate can be combined into a closed circular pipe-shaped structure.

[0010] Further, the sleeve ring is designed in a flat circular pipe structure.

[0011] Further, the other side of the maintenance plate is provided with a groove capable of accommodating the sleeve ring.

[0012] The utility model discloses the beneficial effects: through the sleeve ring and the positioning column combination of each group connecting plate and connecting sleeve between the setting connecting structure, can play the purpose of flexible adjustment angle to the connecting plate and connecting sleeve connected with each other, and further be favorable to the flexible convenient use according to the environment of construction site, and practicality is strong, through the series combination of connecting rope and sleeve ring, can play the reinforcing effect to the connecting plate and connecting sleeve connected with each other, and further be favorable to the stability of the connecting plate and connecting sleeve connection combination of improving. BRIEF DESCRIPTION OF DRAWINGS

[0013] Figure 1 It is the annular combination state diagram of the utility model.

[0014] Figure 2 It is the top view of the utility model.

[0015] Figure 3 It is the horizontal development state diagram of the utility model.

[0016] Figure 4 It is the partial three-dimensional structure schematic diagram of the utility model.

[0017] Figure 5 It is the structure separation diagram of the utility model.

[0018] The drawing reference: 1_maintenance plate, 2_connecting plate, 3_connecting sleeve, 4_connecting rope, 5_accommodate groove, 6_sleeve ring, 7_positioning column, 8_groove. DETAILED DESCRIPTION

[0019] The utility model is further explained in connection with the drawings and examples.

[0020] Example: the utility model provides a kind of maintenance structure for pipe gallery foundation pit excavation, as shown in Figures 1-5As shown, including maintenance plate 1, connecting plate 2, connecting sleeve 3, connecting rope 4 and adjusting member, one side of maintenance plate 1 is provided with connecting plate 2, maintenance plate 1 is arc structure design, which is beneficial to the mutual connection of maintenance plate 1 combined into different shape structure; each maintenance plate 1 and connecting plate 2 can be combined into a character structure, and each maintenance plate 1 and connecting plate 2 can be combined into a closed circular tube structure, which is suitable for flexible combination in different construction environment; the inner side of connecting plate 2 is provided with connecting sleeve 3 symmetrically, connecting sleeve 3 is provided with connecting rope 4, and maintenance plate 1 and connecting plate 2 are provided with adjusting member which can be connected and combined, adjusting member includes sleeve ring 6 and positioning column 7, the side of connecting plate 2 is provided with accommodating groove 5, sleeve ring 6 is arranged in accommodating groove 5, sleeve ring 6 is flat circular tube structure design, which is convenient for flexible adjustment of connecting angle; the other side of maintenance plate 1 is provided with positioning column 7, and sleeve ring 6 can be sleeved on the corresponding positioning column 7, so that different groups of maintenance plate 1 and connecting plate 2 can be connected and combined, the other side of maintenance plate 1 is provided with groove 8 which can accommodate sleeve ring 6, which can tightly connect the connecting part between each maintenance plate 1.

[0021] In the construction process, according to the actual situation, each maintenance plate 1 and connecting plate 2 can be connected and combined into the required shape structure, because each group of maintenance plate 1 and connecting plate 2 is connected through sleeve ring 6 and positioning column 7 which can adjust the angle flexibly, so as to adjust the angle of each group of maintenance plate 1 and connecting plate 2 flexibly, which is beneficial to flexible and variable combination according to the construction environment, and has high practicability; when each group of maintenance plate 1 and connecting plate 2 is combined, connecting rope 4 is sequentially arranged in each connecting sleeve 3 and tightened, so as to reinforce the connected maintenance plate 1 and connecting plate 2, so that each maintenance plate 1 and connecting plate 2 can be connected stably.

[0022] The above examples are provided for those skilled in the art to realize or use the present application, those skilled in the art can make various modifications or changes to the above examples without departing from the practical idea of the present application, therefore the protection scope of the present application is not limited by the above examples, but should be the maximum range of the innovative features mentioned in the claims.

Claims

1. A maintenance structure for excavating a pipe gallery foundation pit, comprising a maintenance plate (1) and a connecting plate (2), wherein the connecting plate (2) is provided on one side of the maintenance plate (1), characterized in that: It also includes a connecting sleeve (3), a connecting rope (4) and an adjusting component. The connecting sleeve (3) is symmetrically arranged on the inner side of the connecting plate (2). The connecting rope (4) is threaded through the connecting sleeve (3). An adjusting component that can be connected and combined between the maintenance plate (1) and the connecting plate (2) is provided. The adjusting component includes a collar (6) and a positioning post (7). A receiving groove (5) is opened on the side of the connecting plate (2). A collar (6) is provided in the receiving groove (5). A positioning post (7) is provided on the other side of the maintenance plate (1). The collar (6) can be sleeved on the corresponding positioning post (7) so that the maintenance plates (1) and connecting plates (2) of different sets can be connected and combined.

2. The maintenance structure for excavation of a utility tunnel foundation pit according to claim 1, characterized in that: The maintenance plate (1) has an arc-shaped structure design.

3. The maintenance structure for excavation of a pipe gallery foundation pit according to claim 2, characterized in that: The maintenance plate (1) and the connecting plate (2) can be combined into a straight line structure.

4. A maintenance structure for excavation of a pipe gallery foundation pit according to claim 2, characterized in that: The maintenance plate (1) and the connecting plate (2) can be combined to form a closed cylindrical structure.

5. A maintenance structure for excavation of a utility tunnel foundation pit according to claim 1, characterized in that: The collar (6) is designed as a flat circular tube.

6. A maintenance structure for excavation of a utility tunnel foundation pit according to claim 1, characterized in that: The other side of the maintenance plate (1) is provided with a groove (8) that can accommodate the collar (6).

Citation Information

Patent Citations

  • Combined steel sheet pile enclosure structure

    CN219343142U