Set-shaped steel formwork fine adjustment device for large-field concrete pouring
By using a support structure consisting of fixed piles, sleeves, and connecting rods, and by adjusting the length of the connecting rods using a screw adjuster, the problem of deformation or displacement of the fixed steel formwork is solved. This enables fine-tuning of the fixed steel formwork, and solves the problem of fine-tuning the support angle and position of the fixed steel formwork, thus ensuring the quality and efficiency of concrete construction.
Patent Information
- Application Number
- CN202520084054.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-14
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-01-14
AI Technical Summary
In existing technologies, due to material elasticity, concrete compression, and the potential displacement of supporting piles after prolonged stress, the fixed steel formwork may deform or shift, making it impossible to make fine adjustments to its angle and position, thus affecting the quality and efficiency of concrete construction.
The system employs a combination structure of fixed ground piles, sleeves, connecting rods, and screw adjusters. By rotating the screw adjuster to adjust the length of the connecting rod, a stable triangular support structure is formed, enabling fine-tuning of the angle and position of the shaped steel formwork.
It effectively restores the original position of the fixed steel formwork, ensures the quality and efficiency of concrete pouring construction, and improves the support stability and adjustability of the fixed steel formwork.
Smart Images

Figure CN223688744U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to concrete pouring technical field, concretely is a kind of large field concrete pouring's shaping steel formwork micro-adjustment device. BACKGROUND
[0002] In the large field concrete construction such as road surface or airport, shaping steel formwork needs to be used, and shaping steel formwork is supported and fixed, to control the shape and size after concrete solidification, so that the final construction result is more in line with design requirements, ensure the quality and efficiency of concrete construction, before concrete solidification, shaping steel formwork needs stable support to bear the extrusion force given by concrete, in prior art, due to material elasticity, concrete extrusion, and the support ground pile inserted into ground may be outwardly deviated after long time stress, shaping steel formwork is prone to deformation or displacement, angle and position of shaping steel formwork cannot be finely adjusted, affect the quality and efficiency of concrete construction, therefore, urgently needed is a kind of support device capable of fine adjustment of the position and angle of shaping steel formwork. SUMMARY
[0003] In view of the deficiencies in the prior art, the utility model provides a large field concrete pouring shaping steel formwork micro-adjustment device, which solves the problem that, in the prior art, due to material elasticity, concrete extrusion, and the support ground pile inserted into ground may be outwardly deviated after long time stress, shaping steel formwork is prone to deformation or displacement, angle and position of shaping steel formwork cannot be finely adjusted, affect the quality and efficiency of concrete construction.
[0004] To achieve the above object, the utility model is realized by the following technical scheme: a large field concrete pouring shaping steel formwork micro-adjustment device, comprising shaping steel formwork, a fixed ground pile is arranged on the outer side of the shaping steel formwork, a sleeve is sleeved on the outer wall of the fixed ground pile, a first connecting rod is fixedly connected to the bottom of one side of the sleeve close to the shaping steel formwork, a second connecting rod is rotatably connected to the top of one side of the sleeve close to the shaping steel formwork, a support rod is fixedly connected to the outer wall of one side of the shaping steel formwork close to the fixed ground pile, a third connecting rod is rotatably connected to the bottom of one side of the support rod close to the fixed ground pile, a fourth connecting rod is rotatably connected to the top of one side of the support rod close to the fixed ground pile, the ends of the first connecting rod and the third connecting rod and the second connecting rod and the fourth connecting rod close to each other are all provided with threaded ends, the sides of the first connecting rod and the third connecting rod and the second connecting rod and the fourth connecting rod close to each other are all provided with screw adjusters, and the screw adjusters are in threaded connection with the threaded ends.
[0005] Preferably, an equal number of adjusting insertion holes are formed in the outer wall of the screw adjuster, and an equal number of anti-skid lines are arranged on the outer wall of the screw adjuster.
[0006] Preferably, the sleeve is fixedly connected with an arc-shaped fixing plate at the bottom of the side close to the shaped steel formwork.
[0007] Preferably, the bottom of the arc-shaped fixing plate is fixedly connected with a reinforcing plate, and the reinforcing plate is fixedly connected with the sleeve.
[0008] Preferably, the sleeve is threadedly connected with a fixing bolt at the side away from the shaped steel formwork, and the fixing bolt is in matched connection with the fixed stake.
[0009] The utility model provides a kind of shaped steel formwork micro-adjusting device of large field concrete pouring.It has the following beneficial effects: the shaped steel formwork micro-adjusting device of large field concrete pouring, by the cooperation between fixed stake, sleeve, first connecting rod, second connecting rod, support rod, third connecting rod, fourth connecting rod, threaded end and screw rod adjuster, by screw rod adjuster, first connecting rod and third connecting rod, second connecting rod and fourth connecting rod are connected, can form stable triangle structure between fixed stake and support rod, support shaped steel formwork, when shaped steel formwork is deformed or displacement, by rotating screw rod adjuster, the length of support structure connecting rod can be adjusted, and then the support angle and position of shaped steel formwork are micro-adjusted, shaped steel formwork is restored to original position, which can ensure the construction quality and efficiency of large field concrete pouring.
[0010] By the cooperation between screw rod adjuster, adjusting insertion hole and anti-skid line, by inserting screwdriver etc. Into the inside of adjusting insertion hole, it is convenient to force screw rod adjuster when rotating micro-adjusting, and by setting anti-skid line on the outer wall of screw rod adjuster, increase the friction between hand and screw rod adjuster, when installing and removing support structure, staff can quickly rotate screw rod adjuster with hand, so that shaped steel formwork micro-adjusting device is installed, removed and micro-adjusted. BRIEF DESCRIPTION OF DRAWINGS
[0011] Figure 1 It is structure schematic view of the utility model;
[0012] Figure 2 It is appearance schematic view of sleeve, first connecting rod and arc-shaped fixing plate in the utility model;
[0013] Figure 3 It is appearance schematic view of screw rod adjuster, adjusting insertion hole and anti-skid line in the utility model;
[0014] Figure 4 It is Figure 1 It is local enlarged view of area A in the utility model.
[0015] In the figure: 1, the shaped steel formwork; 2, the fixed ground pile; 3, the sleeve; 4, the first connecting rod; 5, the second connecting rod; 6, the support rod; 7, the third connecting rod; 8, the fourth connecting rod; 9, the threaded end; 10, the screw adjuster; 11, the adjusting socket; 12, the anti-skid pattern; 13, the arc-shaped fixing plate; 14, the reinforcing plate; 15, the fixing bolt. DETAILED DESCRIPTION
[0016] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0017] In the prior art, due to material elasticity, concrete extrusion, and the outward deviation of the inserted ground support pile after long-time stress, the shaped steel formwork is prone to deformation or displacement, the angle and position of the shaped steel formwork cannot be finely adjusted, and the quality and efficiency of concrete construction are affected.
[0018] Therefore, the utility model provides a shaped steel formwork fine adjustment device for large field concrete pouring, which is formed by the cooperation between the fixed ground pile, the sleeve, the first connecting rod, the second connecting rod, the support rod, the third connecting rod, the fourth connecting rod, the threaded end and the screw adjuster. The first connecting rod and the third connecting rod, and the second connecting rod and the fourth connecting rod are connected by the screw adjuster, so that a stable triangular structure is formed between the fixed ground pile and the support rod, the shaped steel formwork is supported, when the shaped steel formwork is deformed or displaced, the length of the support structure connecting rod is adjusted by rotating the screw adjuster, the support angle and position of the shaped steel formwork are finely adjusted, the shaped steel formwork is restored to the original position, and the construction quality and efficiency of concrete pouring are ensured.
[0019] By those skilled in the art, all electrical components in the case are connected to the power supply through wires, and appropriate controllers and encoders should be selected according to actual conditions to meet the control requirements. The specific connection and control sequence should be completed according to the working order between the electrical components in the working principle described below. The detailed connection means is a common technology in the art. The working principle and process are mainly introduced below, and the electrical control is not described.
[0020] By Figures 1-4It can be known that a kind of large field concrete pouring of shaping steel formwork micro-adjusting device, including shaping steel formwork 1, shaping steel formwork 1 is the shaping formwork of concrete pouring, after concrete solidification, it is removed, can be repeatedly used, the outside of shaping steel formwork 1 is provided with fixed ground pile 2, fixed ground pile 2 is knocked into the ground outside shaping steel formwork 1 by tool, for supporting and fixing steel formwork support structure, the outer wall of fixed ground pile 2 is sleeved with sleeve pipe 3, first connecting rod 4 is fixedly connected at the bottom of the side of sleeve pipe 3 close to shaping steel formwork 1, second connecting rod 5 is rotatably connected at the top of the side of sleeve pipe 3 close to shaping steel formwork 1, the outer wall of shaping steel formwork 1 close to the side of fixed ground pile 2 is fixedly connected with support rod 6, third connecting rod 7 is rotatably connected at the bottom of the side of support rod 6 close to fixed ground pile 2, fourth connecting rod 8 is rotatably connected at the top of the side of support rod 6 close to fixed ground pile 2, the end of first connecting rod 4 and third connecting rod 7, second connecting rod 5 and fourth connecting rod 8 close to each other is provided with threaded end 9, the side of first connecting rod 4 and third connecting rod 7, second connecting rod 5 and fourth connecting rod 8 close to each other is provided with screw adjuster 10, screw adjuster 10 is threadedly connected with threaded end 9;
[0021] In the implementation process, it is worth pointing out that the steel formwork 1 is a formwork for concrete pouring, which is removed after the concrete solidifies and can be repeatedly used. The fixed pile 2 is knocked into the ground outside the steel formwork 1 by a tool, which is used to support and fix the steel formwork support structure. The first connecting rod 4 and the third connecting rod 7, and the second connecting rod 5 and the fourth connecting rod 8 are connected through the screw adjuster 10, which is composed of two connecting rods of the support structure. The screw threads of the first connecting rod 4 and the third connecting rod 7, and the second connecting rod 5 and the fourth connecting rod 8 are in opposite directions. When connected with the screw adjuster 10, the screw threads at both ends of the screw adjuster 10 are rotated in or out synchronously by rotating the screw adjuster 10, thereby adjusting the length of the connecting rod. The fixed pile 2, the sleeve pipe 3, the first connecting rod 4, the second connecting rod 5, the support rod 6, the third connecting rod 7, the fourth connecting rod 8, the screw thread 9 and the screw adjuster 10 are cooperated to form the support structure of the steel formwork 1. The first connecting rod 4 and the third connecting rod 7, and the second connecting rod 5 and the fourth connecting rod 8 are connected through the screw adjuster 10, and the length of the connecting rod of the support structure is adjusted by rotating the screw adjuster 10, so that a stable triangular structure is formed between the fixed pile 2 and the support rod 6, which ensures that the support rod 6 stably supports the steel formwork 1. The fixed pile 2, the sleeve pipe 3, the first connecting rod 4, the second connecting rod 5, the support rod 6, the third connecting rod 7, the fourth connecting rod 8, the screw thread 9 and the screw adjuster 10 are cooperated, and the first connecting rod 4 and the third connecting rod 7, and the second connecting rod 5 and the fourth connecting rod 8 are connected through the screw adjuster 10, so that a stable triangular structure is formed between the fixed pile 2 and the support rod 6, which supports the steel formwork 1. When the steel formwork 1 deforms or displaces, the length of the connecting rod of the support structure is adjusted by rotating the screw adjuster 10, the support angle and position of the steel formwork 1 are fine-tuned, the steel formwork 1 is restored to the original position, and the construction quality and efficiency of the concrete pouring are ensured;
[0022] Further, the outer wall of the screw adjuster 10 is equidistantly provided with an adjusting hole 11, and the outer wall of the screw adjuster 10 is equidistantly provided with an anti-skid line 12;
[0023] In the implementation process, it is worth pointing out that, by adjusting the cooperation between the screw rod adjuster 10, the adjusting hole 11 and the anti-skid pattern 12, by inserting a tool such as a screwdriver into the inside of the adjusting hole 11, the screw rod adjuster 10 is facilitated to force in rotation fine adjustment, and by setting the anti-skid pattern 12 on the outer wall of the screw rod adjuster 10, the worker can quickly rotate the screw rod adjuster 10 with his hand when installing and removing the support structure, increase the friction between the hand and the screw rod adjuster 10, and improve the convenience of the micro-adjustment device installation, removal and fine adjustment;
[0024] Further, the sleeve 3 is fixedly connected with the arc-shaped fixed plate 13 at the bottom of the side close to the shaped steel formwork 1, and the arc-shaped fixed plate 13 is fixedly connected with the first connecting rod 4;
[0025] In the implementation process, it is worth pointing out that, by adjusting the cooperation between the screw rod adjuster 10, the adjusting hole 11 and the anti-skid pattern 12, by inserting a tool such as a screwdriver into the inside of the adjusting hole 11, the screw rod adjuster 10 is facilitated to force in rotation fine adjustment, and by setting the anti-skid pattern 12 on the outer wall of the screw rod adjuster 10, the worker can quickly rotate the screw rod adjuster 10 with his hand when installing and removing the support structure, increase the friction between the hand and the screw rod adjuster 10, and improve the convenience of the micro-adjustment device installation, removal and fine adjustment;
[0026] Further, the bottom of the arc-shaped fixed plate 13 is fixedly connected with the reinforcing plate 14, and the reinforcing plate 14 is fixedly connected with the sleeve 3;
[0027] In the implementation process, it is worth pointing out that, by adjusting the cooperation between the screw rod adjuster 10, the adjusting hole 11 and the anti-skid pattern 12, by inserting a tool such as a screwdriver into the inside of the adjusting hole 11, the screw rod adjuster 10 is facilitated to force in rotation fine adjustment, and by setting the anti-skid pattern 12 on the outer wall of the screw rod adjuster 10, the worker can quickly rotate the screw rod adjuster 10 with his hand when installing and removing the support structure, increase the friction between the hand and the screw rod adjuster 10, and improve the convenience of the micro-adjustment device installation, removal and fine adjustment;
[0028] Further, the bottom of the arc-shaped fixed plate 13 is fixedly connected with the reinforcing plate 14, and the reinforcing plate 14 is fixedly connected with the sleeve 3;
[0029] In the implementation process, it is worth pointing out that, by adjusting the cooperation between the screw rod adjuster 10, the adjusting hole 11 and the anti-skid pattern 12, by inserting a tool such as a screwdriver into the inside of the adjusting hole 11, the screw rod adjuster 10 is facilitated to force in rotation fine adjustment, and by setting the anti-skid pattern 12 on the outer wall of the screw rod adjuster 10, the worker can quickly rotate the screw rod adjuster 10 with his hand when installing and removing the support structure, increase the friction between the hand and the screw rod adjuster 10, and improve the convenience of the micro-adjustment device installation, removal and fine adjustment;
[0030] It is to be noted that, in the present document, relational terms such as first and second and the like can be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus. An element proceeded by "comprises a... " does not, without more constraints, preclude the existence of additional identical elements in the process, method, article, or apparatus that comprises the element.
[0031] In the present application, unless otherwise explicitly specified and limited, the terms "mounting", "setting", "connecting", "fixing", "screw connecting" and the like should be understood in a broad sense, for example, can be fixed connection, can also be detachable connection, or integrated; can be mechanical connection, can also be electrical connection; can be directly connected, can also be indirectly connected through an intermediate medium, can be the internal communication of two elements or the interaction relationship of two elements, unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in the present application according to the specific circumstances.
[0032] Although the embodiments of the present application have been shown and described, those skilled in the art can understand that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and spirits of the present application, the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A micro-adjustment device for large field concrete pouring formwork, comprising a formwork (1), characterized in that: The outside of the shaped steel formwork (1) is provided with a fixed pile (2), the outer wall of the fixed pile (2) is sleeved with a sleeve (3), the first connecting rod (4) is fixedly connected to the bottom of the side of the sleeve (3) close to the shaped steel formwork (1), the second connecting rod (5) is rotatably connected to the top of the side of the sleeve (3) close to the shaped steel formwork (1), the support rod (6) is fixedly connected to the outer wall of the side of the shaped steel formwork (1) close to the fixed pile (2), the third connecting rod (7) is rotatably connected to the bottom of the side of the support rod (6) close to the fixed pile (2), the fourth connecting rod (8) is rotatably connected to the top of the side of the support rod (6) close to the fixed pile (2), the first connecting rod (4) and the third connecting rod (7), the second connecting rod (5) and the fourth connecting rod (8) are provided with threaded ends (9) at the ends close to each other, the first connecting rod (4) and the third connecting rod (7), the second connecting rod (5) and the fourth connecting rod (8) are provided with screw adjusters (10) on the sides close to each other, and the screw adjusters (10) are threadedly connected with the threaded ends (9).
2. The micro-adjustment device for large field concrete pouring formwork according to claim 1, characterized in that: The outer wall of the screw adjuster (10) is equidistantly provided with adjusting insertion holes (11), and the outer wall of the screw adjuster (10) is equidistantly provided with anti-skid lines (12).
3. The micro-adjustment device for large field concrete pouring formwork according to claim 1, characterized in that: The bottom of the side of the sleeve (3) close to the shaped steel formwork (1) is fixedly connected with an arc-shaped fixing plate (13), and the arc-shaped fixing plate (13) is fixedly connected with the first connecting rod (4).
4. The micro-adjustment device for large field concrete pouring formwork according to claim 3, characterized in that: The bottom of the arc-shaped fixing plate (13) is fixedly connected with a reinforcing plate (14), and the reinforcing plate (14) is fixedly connected with the sleeve (3).
5. The device according to claim 1, wherein the device is characterized in that: The side of the sleeve (3) away from the shaped steel formwork (1) is threadedly connected with a fixing bolt (15), and the fixing bolt (15) is connected with the fixed pile (2).