Pull rod mounting assembly for road construction

The design of the mounting plate, telescopic components, and rotating plate solves the problem of insufficient flexibility of tie rod mounting components in road construction, enabling precise adjustment of tie rod position and angle, and improving construction quality and efficiency.

CN223688752UActive Publication Date: 2025-12-19QINGDAO BAOTIAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520096643.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-15
Publication Date
2025-12-19
Estimated Expiration
2035-01-15

AI Technical Summary

Technical Problem

Existing tie rod installation assemblies lack flexibility in road construction, making it impossible to precisely adjust the tie rod position and axial angle, which affects construction quality and efficiency.

Method used

The structure employs a mounting plate, telescopic components, and a rotating plate, connected by perforations, hinge rods, and hinge cylinders to allow for fine-tuning of the position and angle of the tie rod, while fixing bolts ensure stability.

Benefits of technology

It improves the flexibility and accuracy of tie rod installation, reduces construction errors, enhances the quality and efficiency of road construction, and reduces construction difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223688752U_ABST
    Figure CN223688752U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of road construction and maintenance, in particular to a pull rod mounting assembly for road construction, which comprises a mounting plate, a plurality of through holes are formed in the plate surface in a penetrating manner and used for inserting pull rods, and the through holes are distributed at equal intervals along the length direction of the mounting plate; the telescopic assemblies are arranged corresponding to the penetrating holes and used for adjusting the positions of the penetrating holes in the mounting plate; the rotating plate is vertically arranged on the surface of the mounting plate, the through hole horizontally penetrates through the rotating plate, and rotating pieces are arranged on the top side edge and the bottom side edge of the rotating plate so as to drive the surface of the rotating plate to rotate and adjust the horizontal angle of the through hole. The effects of improving the flexibility of the pull rod mounting assembly and reducing construction errors are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of highway construction and maintenance technology, in particular to a pull rod installation assembly for road construction. BACKGROUND

[0002] The pull rod plays a vital role in the field of road construction, especially in the field of road construction with a larger width. It effectively disperses the load on the road structure through its tensioning effect, reduces stress concentration caused by traffic load, and avoids horizontal displacement of the road precast block.

[0003] The pull rod is usually installed between the longitudinal joints of the road or the joints of the precast road blocks, and the rod body is horizontally inserted into the inside of the road main concrete on both sides of the joint. In the traditional construction process, except for part of the construction method using precast concrete blocks, the pull rod needs to be installed at the preset position and fixed according to the pre-calculated results before the concrete is poured. The pull rod is installed, and then the concrete is poured. This scheme is more efficient than the construction scheme of drilling holes in the corresponding pull rod installation position after the concrete is formed.

[0004] Therefore, the pull rod installation assembly needs to be pre-installed at the longitudinal joint of the road, and the pull rod is fixed through the pull rod installation assembly. The concrete slurry is poured between the two adjacent installation assemblies, and after solidification, it becomes the main part of the concrete road. However, the current pull rod installation assembly has the problem of insufficient flexibility, which cannot fine-tune the accurate position and axial angle of the pull rod, thereby affecting the road construction to some extent. SUMMARY

[0005] In order to improve the flexibility of the pull rod installation assembly and reduce construction errors, the present application provides a pull rod installation assembly for road construction.

[0006] The pull rod installation assembly for road construction provided by the present application adopts the following technical scheme:

[0007] A pull rod installation assembly for road construction comprises:

[0008] An installation plate, a plurality of through holes are provided on the plate surface for inserting the pull rod, and the through holes are distributed at equal intervals along the length direction of the installation plate;

[0009] A telescopic assembly is provided corresponding to each through hole for adjusting the position of the through hole on the installation plate;

[0010] A rotating plate is vertically arranged on the plate surface of the installation plate, the through hole is horizontally provided in the rotating plate, and the top and bottom edges of the rotating plate are provided with rotating members to drive the plate surface of the rotating plate to rotate and adjust the horizontal angle of the through hole.

[0011] By adopting the technical scheme, the installation plate is the main part of the pull rod installation assembly, the pull rod is inserted into the perforation of the rotating plate by the construction personnel, and placement of the pull rod is realized, when the horizontal angle of the pull rod needs to be changed due to bending of the road pouring main part, the rotating plate is rotated to drive the pull rod to rotate in the horizontal plane to adjust the angle, and then the rotating plate is fixed.

[0012] When the position of the perforation in the horizontal plane needs to be changed, the position of the perforation in the length direction of the installation plate is adjusted by the telescopic assembly, and the spacing between the perforations is adjusted.

[0013] Optionally, the installation plate further comprises:

[0014] The hinged rod is vertically arranged and formed at one end of the installation plate.

[0015] The hinged barrel is vertically arranged and formed at the other end of the installation plate.

[0016] The inner wall of the hinged barrel is adapted to the hinged rod, so that the hinged rod of one installation plate is inserted into the hinged barrel of another installation plate to connect the two installation plates.

[0017] By adopting the technical scheme, a plurality of installation plates need to be spliced in actual application, that is, the two ends of the plurality of installation plates are spliced end to end, and the connection mode of the hinged rod and the hinged barrel is convenient for the construction personnel to operate, and the construction personnel can directly set the hinged rod and the hinged barrel.

[0018] The hinged mode of the hinged rod and the hinged barrel can realize angle change between the installation plates, and improve flexibility of the installation plates.

[0019] Optionally, the connection ends of the hinged barrel, the hinged rod and the installation plate are different.

[0020] By adopting the technical scheme, after laying of the previous installation plate is completed, the hinged barrel of the next installation plate is directly buckled on the hinged rod, which is convenient for operation and improves connection stability between the installation plates.

[0021] Optionally, the part of the installation plate corresponding to the rotating part of the rotating plate is screw-connected with the first fixing bolt.

[0022] By adopting the technical scheme, when the rotating plate is rotated to a preset angle, the first fixing bolt is tightened, the first fixing bolt abuts against the rotating part, and the rotating plate is fixed at the current angle.

[0023] Optionally, the installation plate further comprises:

[0024] The fixed barrel is horizontally arranged on the part of the rotating plate corresponding to the perforation, the inner barrel diameter of the fixed barrel is equal to the diameter of the perforation, and the second fixing bolt is screw-connected on the barrel wall of the fixed barrel.

[0025] The axial direction of the second fixing bolt is perpendicular to the axial direction of the fixing cylinder.

[0026] By adopting the technical scheme, the fixing cylinder is used for fixing the pull rod inserted in the through hole, a supporting part in the horizontal plane of the pull rod and the second fixing bolt is given, the pull rod is kept horizontal, and the second fixing bolt is tightened to abut against the rod body part of the pull rod.

[0027] Optionally, the mounting plate body part comprises a plurality of splicing plates, the splicing plates correspond to the rotating plates one by one, and the telescopic assembly adjusts the spacing between the plurality of splicing plates.

[0028] The telescopic assembly comprises:

[0029] A stretching plate is formed on one same side of the plurality of splicing plates.

[0030] A stretching groove is formed on the other same side of the plurality of splicing plates, and the stretching plate body part is inserted into the stretching groove.

[0031] By adopting the technical scheme, the telescopic assembly is mainly realized by the stretching plate and the stretching groove, the stretching plate is slidingly connected to the stretching groove, the spacing between the plurality of splicing plates is changed by telescoping in the stretching groove, and the spacing between the through holes is changed.

[0032] Optionally, a hinge structure is vertically arranged on the surface of the stretching plate, so that the surface of the stretching plate is bent.

[0033] By adopting the technical scheme, when the hinge structure of the stretching plate is stretched out of the stretching groove, the angle of the stretching plate in the same mounting plate is changed by bending; when the stretching length of the stretching plate is large, the angle requirement of the road bending is met.

[0034] Optionally, a third fixing bolt vertically arranged is threadedly connected to the top wall of the stretching groove, and the end of the third fixing bolt extends into the stretching groove.

[0035] By adopting the technical scheme, when the stretching plate is stretched out of the stretching groove, the third fixing bolt is tightened, the stretching plate is abutted by the end of the third fixing bolt, and the stretching length of the current stretching plate is fixed.

[0036] In summary, the present application at least has the following beneficial technical effects:

[0037] 1. The pull rod mounting assembly can realize accurate fine adjustment of the position and axial angle of the pull rod, significantly improve the flexibility and quality of road construction, and also help to reduce damage to the pull rod and road quality problems caused by improper installation.

[0038] 2. Through the design of the tension plate, the present invention can adapt to different construction needs and environmental conditions, which not only facilitates transportation and storage, but also allows for rapid assembly and adjustment on site, thereby greatly improving construction efficiency.

[0039] 3. The hinge rod and hinge cylinder structure in this invention allows multiple mounting plates to be easily connected, enhancing the stability and load-bearing capacity of the overall structure, while also facilitating the operation of construction personnel.

[0040] 4. The design of the rotating plate and the fixed cylinder further ensures the stability and accuracy of the tie rod during installation. The tie rod can be firmly fixed through simple operation, which greatly reduces the construction difficulty and cost.

[0041] 5. The tie rod installation assembly of the present invention has the advantages of simple structure, convenient operation and strong applicability, which can effectively improve the quality and efficiency of road construction and provide strong support for modern transportation construction. Attached Figure Description

[0042] Figure 1 This is a schematic diagram of the overall structure of an embodiment of this application.

[0043] Figure 2 This is a structural schematic diagram of the embodiment of this application, made to highlight the stretching plate.

[0044] Figure 3 This is a structural schematic diagram in the embodiments of this application, made to highlight the rotation of the stretching plate.

[0045] Figure 4 This is a structural schematic diagram in an embodiment of this application to highlight the rotating plate.

[0046] Explanation of reference numerals in the attached drawings: 1. Tie rod; 2. Mounting plate; 21. Splicing plate; 22. Tension groove; 23. Tension plate; 24. Third fixing bolt; 25. Rotating plate; 251. Rotating pin; 252. Fixing cylinder; 253. Through hole; 254. Second fixing bolt; 255. First fixing bolt; 26. Hinge rod; 27. Hinge cylinder. Detailed Implementation

[0047] The following is in conjunction with the appendix Figures 1-4 This application will be described in further detail.

[0048] This application discloses a tie rod mounting assembly for road construction. (Refer to...) Figure 1 and Figure 2The utility model provides a kind of pull rod installation assembly for road construction, including installation plate 2, installation plate 2 is rectangular plate shape of length greater than width, installation plate 2 is made of multiple spliced plates 21, multiple spliced plates 21 are sequentially connected to form spliced plate 21 along length direction. Stretching slot 22 is set on one side of each spliced plate 21, and stretching plate 23 suitable for stretching slot 22 is fixedly connected on the other side, the spacing between multiple spliced plates 21 is adjusted by the insertion of stretching slot 22 and stretching plate 23, to change the length of installation plate 2.

[0049] With reference to Figure 1 With Figure 2 The third fixing bolt 24 is threadedly connected and provided through the top wall of the stretching slot 22, the third fixing bolt 24 is vertically arranged on the top wall of the stretching slot 22, the bottom end of the third fixing bolt 24 penetrates through the top wall of the stretching slot 22 and extends into the stretching slot 22 to abut against the stretching plate 23, and when the stretching plate 23 is stretched out of the stretching slot 22 by a predetermined distance, the third fixing bolt 24 is tightened by the worker to fix the stretching plate 23 by the end abutment.

[0050] With reference to Figure 2 With Figure 3 The middle part of the stretching plate 23 is vertically provided with a hinged structure, specifically, the plate body part of the stretching plate 23 is hingedly connected by two vertically arranged hinged plates, and the hinged side is a vertical side, so that when the stretching plate 23 is stretched out of the stretching slot 22, the stretching plate 23 can be bent around the hinged structure itself to change the bending angle to adapt to the curved part of the road after the third fixing bolt 24 is tightened while keeping the stretching plate 23 and the spliced plate 21 vertical, as shown in Figure 3 .

[0051] Looking back Figure 1 The above-mentioned stretching plate 23 is used for connecting the spliced plates 21 inside the installation plate 2, the installation plate 2 is provided with a connecting structure between the installation plates 2 at both ends, one end of the installation plate 2, i.e. the bottom side of one vertical side edge of the spliced plate 21 at one end of the installation plate 2 is formed with a hinged rod 26, the hinged rod 26 is vertically arranged, and the top side of one vertical side edge of the spliced plate 21 at the other end of the installation plate 2 is formed with a hinged cylinder 27, the hinged cylinder 27 is vertically arranged, and the hinged cylinder 27 is a cylindrical structure, which is inserted with the hinged rod 26 on the other installation plate 2 to complete the connection between the installation plates 2. In the embodiment, the connecting end of the hinged rod 26 and the hinged cylinder 27 with the spliced plate 21 should be different to avoid stress concentration in the connecting part.

[0052] With reference to Figure 1 With Figure 4Each splicing plate 21 is rotationally connected with a rotating plate 25, the rotating plate 25 is vertically arranged, and a rotating pin 251 is vertically formed in the middle part of the top and bottom two side edges of the rotating plate 25, the rotating pin 251 is a rod-shaped structure, the splicing plate 21 is provided with a round hole corresponding to the two rotating pins 251, the rotating pin 251 is inserted into the round hole, the rotating plate 25 is flexibly rotated around the rotating pin 251, and the rotating plate 25 remains in a vertical state in the rotating process. A through hole 253 is horizontally arranged on the rotating plate 25, the through hole 253 is used for inserting the pull rod 1, and the horizontal angle of the rod body of the pull rod 1 is adjusted by rotating the rotating plate 25. In order to realize the stable fixing of the pull rod 1, a fixing cylinder 252 is formed on one side surface of the rotating plate 25 corresponding to the through hole 253, the inner diameter of the fixing cylinder 252 and the hole diameter of the through hole 253 are matched with the rod diameter of the pull rod 1, the second fixing bolt 254 is threadedly connected to the cylinder wall of the fixing cylinder 252, the axial direction of the second fixing bolt 254 is perpendicular to the axial direction of the fixing cylinder 252, and the second fixing bolt 254 is tightened to abut against the pull rod 1, so that the fixing is realized.

[0053] With reference to Figure 1 With Figure 4 The top side of each splicing plate 21 is threadedly connected with a first fixing bolt 255 corresponding to the part of the rotating pin 251 on the rotating plate 25, the end of the first fixing bolt 255 abuts against the top side of the rotating pin 251, and the construction personnel fixes the rotating plate 25 at the current angle by tightening the first fixing bolt 255.

[0054] The implementation principle of the pull rod installation assembly for road construction in the embodiment of the application is as follows: before construction, the construction personnel can directly use the installation plate 2 to fix the pull rod 1 in the three through holes 253 on the installation plate 2, and tighten the second fixing bolt 254 to fix the pull rod 1. When the position of the pull rod 1 needs to be adjusted, the construction personnel pulls out the stretching plate 23 from the stretching groove 22, and then tightens the third fixing bolt 24 to fix the extension length of the stretching plate 23 after the installation plate 2 is extended to the required length.

[0055] The construction personnel can also adjust the angle of the rotating plate 25, and then tighten the first fixing bolt 255 to fix the fixed plate at the current angle.

[0056] The above are preferred embodiments of the application, and do not limit the protection scope of the application, so that: equivalent changes made according to the structure, shape and principle of the application should be covered in the protection scope of the application.

Claims

1. A tie rod mounting assembly for road construction, characterised in that, The utility model relates to a kind of installation plate and its connecting structure, including: Mounting plate (2), multiple perforations (253) are arranged on the plate surface, for inserting pull rod (1), the perforation (253) is equidistantly distributed along the length direction of the mounting plate (2); Telescopic assembly is set for each the perforation (253), for adjusting the position of the perforation (253) on the mounting plate (2); Rotary plate (25) is vertically arranged on the plate surface of the mounting plate (2), the perforation (253) is horizontally arranged in the rotary plate (25), and the top and bottom side edges of the rotary plate (25) are provided with rotating parts to drive the rotary plate (25) plate surface to rotate, and the horizontal angle of the perforation (253) is adjusted.

2. A tie rod mounting assembly for road construction as claimed in claim 1 wherein, Also including: Hinged rod (26) is vertically arranged and formed in one end of the mounting plate (2); Hinged cylinder (27) is vertically arranged and formed in the other end of the mounting plate (2); The inner wall size of the hinged cylinder (27) is matched with the hinged rod (26), so that the hinged rod (26) of one mounting plate (2) is inserted into the hinged cylinder (27) of the other mounting plate (2), and two mounting plates (2) are connected.

3. A tie rod mounting assembly for road construction as claimed in claim 2 wherein: The connection end of the hinged cylinder (27), the hinged rod (26) and the mounting plate (2) is different.

4. A tie rod mounting assembly for road construction as claimed in claim 1, wherein: The mounting plate (2) is screw-connected with the first fixing bolt (255) corresponding to the rotating part of the rotary plate (25).

5. A tie rod mounting assembly for road construction as defined in claim 1, wherein, Also including; Fixed cylinder (252) is horizontally arranged on the plate surface of one side of the rotary plate (25) corresponding to the perforation (253), and the inner cylinder size of the fixed cylinder (252) is equal to the size of the perforation (253), and the second fixing bolt (254) is screw-connected on the cylinder wall of the fixed cylinder (252); The axial direction of the second fixing bolt (254) is perpendicular to the axial direction of the fixed cylinder (252).

6. A tie rod mounting assembly for road construction as defined in claim 1, wherein: The main part of the mounting plate (2) includes a plurality of splicing plates (21), and the splicing plate (21) is one-to-one corresponding to the rotary plate (25), and the telescopic assembly adjusts the spacing between a plurality of splicing plates (21); The telescopic assembly includes: Stretching plate (23) is formed on one side of a plurality of splicing plates (21); Stretching groove (22) is formed on the other side of a plurality of splicing plates (21), and the plate body part of the stretching plate (23) is inserted into the stretching groove (22).

7. A tie rod mounting assembly for road construction as claimed in claim 6 wherein: Hinged structure is vertically arranged on the plate surface of the stretching plate (23), so that the plate surface of the stretching plate (23) is bent.

8. A tie rod mounting assembly for road construction as claimed in claim 7 wherein: The top wall of the stretching groove (22) is screw-connected with the third fixing bolt (24) arranged vertically, and the third fixing bolt (24) extends into the stretching groove (22).