Hoop device for positioning embedded sleeve in beam
By using a clamping device with pre-embedded sleeves in the beam for positioning, and by adjusting the position of the PVC pipe using a suspension lifting assembly and a clamping assembly, the problem of difficult sleeve positioning before beam structure pouring was solved, construction efficiency was improved and deviation was prevented.
Patent Information
- Application Number
- CN202520105145.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-12-23
- Estimated Expiration
- 2035-01-16
AI Technical Summary
In building construction, it is difficult to position the pre-embedded sleeves before pouring the beam structure, which can easily lead to misalignment, affecting the structural quality and construction efficiency.
The clamping device, which uses pre-embedded sleeves in the beam for positioning, includes a suspension lifting component and a clamping component. The position of the PVC pipe in the beam reinforcement cage is adjusted by the suspension lifting component, and the clamping component is used to fix it to prevent deviation.
It achieves precise positioning of PVC pipes, improves construction efficiency, and the device is detachable and reusable, avoiding positional deviations and construction waste.
Smart Images

Figure CN223707172U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of building tools, and particularly to a sleeve hoop device for positioning a pre-buried sleeve in a beam. BACKGROUND
[0002] In current housing construction projects, many beams need to be pre-buried with sleeves before pouring, but it is difficult to fix and accurately position the sleeves, and welding or binding is generally used to fix the sleeves on the beam reinforcement. In actual construction process, the pre-buried sleeves are prone to deviation or disturbance due to the subsequent sinking of the beam, which cannot be corrected due to the influence of the reinforcement. After the pouring of the beam slab is completed, the pre-buried sleeves cannot be used due to the deviation of the pre-buried position, and need to be chiseled and processed, which affects the structural quality and construction efficiency. SUMMARY
[0003] In order to overcome the defects of the prior art, the utility model provides a sleeve hoop device for positioning a pre-buried sleeve in a beam, which aims to solve the above technical problems.
[0004] The utility model solves the technical problems by adopting the technical scheme of a sleeve hoop device for positioning a pre-buried sleeve in a beam, which comprises a beam reinforcement framework, a suspension lifting assembly is connected to the upper end of the beam reinforcement framework, a sleeve hoop assembly is detachably installed at the lower end of the suspension lifting assembly, the sleeve hoop assembly is sleeved on the outer wall of a PVC pipe, and the sleeve hoop assembly and the PVC pipe are located in the beam reinforcement framework.
[0005] In the sleeve hoop device for positioning a pre-buried sleeve in a beam, the suspension lifting assembly comprises a first nut, two ends of the first nut are symmetrically provided with horizontal screws, the horizontal screws are arranged on the upper end of the beam reinforcement framework, a vertical screw is threadedly connected in the first nut, the lower end of the vertical screw extends into the beam reinforcement framework, and the lower end of the vertical screw is threadedly connected with the sleeve hoop assembly.
[0006] In the sleeve hoop device for positioning a pre-buried sleeve in a beam, second nuts are threadedly connected to the horizontal screws at both ends, and the second nuts correspond to the inner wall of the beam reinforcement framework.
[0007] In the sleeve hoop device for positioning a pre-buried sleeve in a beam, the sleeve hoop assembly comprises a hoop body, connecting half-seats are arranged at both ends of the hoop body, corresponding connecting through holes are formed at both ends of the connecting half-seats, and the vertical screw is arranged between the connecting half-seats.
[0008] In the sleeve hoop device for positioning a pre-buried sleeve in a beam, half-circular cavities are arranged in the connecting half-seats at both ends, internal threads are arranged on the inner walls of the half-circular cavities, and the vertical screw is connected with the internal threads.
[0009] The utility model discloses a beneficial effect is: the PVC pipe is bound through the hoop assembly, utilizes the suspension lifting assembly and the hoop assembly connection, makes the PVC pipe hang in the beam steel framework inside, then adjusts the height position of hoop assembly in the beam steel framework through the suspension lifting assembly, thereby adjusts the position of PVC pipe, determines the position, can pour in the beam steel framework to the beam steel framework, thereby prevents the position deviation of PVC pipe, and the construction efficiency is high, and the suspension lifting assembly and the hoop assembly between can dismantle, can remove the suspension lifting assembly after pouring to complete, so that the repeated use. BRIEF DESCRIPTION OF DRAWINGS
[0010] Fig. 1 It is the hoop device's three-dimensional structure schematic view of the utility model.
[0011] Fig. 2 It is the connecting structure schematic view of horizontal screw rod and vertical screw rod.
[0012] Fig. 3 It is the three-dimensional structure schematic view of hoop assembly.
[0013] In the drawing: beam steel framework 1, horizontal screw rod 2, first nut 3, vertical screw rod 4, hoop assembly 5, PVC pipe 6, second nut 7, hoop body 8, connecting half seat 9, connecting through-hole 10, semicircular cavity 11. DETAILED DESCRIPTION
[0014] The specific implementation of the utility model is further explained below in combination with the drawings. It needs to be explained here that the explanation of these implementation is used to help understanding the utility model, but does not constitute the limitation to the utility model. In addition, the technical features involved in each embodiment of the utility model described below can be combined with each other as long as they do not conflict with each other.
[0015] Combination Figs. 1 to 3 The utility model discloses a kind of hoop devices for positioning in beam embedded sleeve, including beam steel framework 1, the upper end of beam steel framework 1 is connected with suspension lifting assembly, the lower end of suspension lifting assembly is detachably installed with hoop assembly 5, hoop assembly 5 is sleeved on the outer wall of PVC pipe 6, and hoop assembly 5 and PVC pipe 6 are located in beam steel framework 1;The PVC pipe 6 of the embodiment is bound through hoop assembly 5, utilizes the suspension lifting assembly and hoop assembly 5 connection, makes the PVC pipe 6 hang in the beam steel framework 1 inside, then adjusts the height position of hoop assembly 5 in the beam steel framework 1 through the suspension lifting assembly, thereby adjusts the position of PVC pipe 6, determines the position, can pour in the beam steel framework 1 to the beam steel framework 1, thereby prevents the position deviation of PVC pipe 6, and the construction efficiency is high, and the suspension lifting assembly and hoop assembly 5 between can dismantle, can remove the suspension lifting assembly after pouring to complete, so that the repeated use.
[0016] The hanging and lifting assembly of the embodiment comprises a first nut 3, transverse screw rods 2 are symmetrically arranged at two ends of the first nut 3, the two ends of the transverse screw rods 2 are arranged on the upper end of the beam steel framework 1, a vertical screw rod 4 is threadedly connected in the first nut 3, the lower end of the vertical screw rod 4 extends into the beam steel framework 1, and the lower end of the vertical screw rod 4 is threadedly connected with a sleeve assembly 5; the total length of the transverse screw rods 2 at the two ends of the first nut 3 is greater than the upper end of the beam steel framework 1, so that the transverse screw rods 2 can be clamped on the upper end of the beam steel framework 1, the vertical screw rod 4 is adjusted by rotating in the first nut 3, so as to adjust the depth of the vertical screw rod 4 in the beam steel framework 1, so as to adjust the position of the sleeve assembly 5 and the PVC pipe 6 in the beam steel framework 1.
[0017] It is worth noting that the second nut 7 is threadedly connected on the two ends of the transverse screw rod 2 of the embodiment, and the second nut 7 corresponds to the inner wall of the beam steel framework 1; after the position of the PVC pipe 6 in the beam steel framework 1 is adjusted, the second nut 7 is moved on the transverse screw rod 2, so that the second nuts 7 on the two sides abut against the inner wall of the beam steel framework 1, so that the transverse screw rod 2 is stably arranged on the upper end of the beam steel framework 1, and displacement is prevented.
[0018] The sleeve assembly 5 of the embodiment comprises a sleeve body 8, a connecting half seat 9 is arranged at each end of the sleeve body 8, a connecting through hole 10 is formed at each end of the connecting half seat 9, and the vertical screw rod 4 is arranged between the two connecting half seats 9; the sleeve body 8 is sleeved on the PVC pipe 6, a locking bolt is arranged in the connecting through hole 10, the sleeve body 8 is prevented from being separated, and the vertical screw rod 4 can be connected between the two connecting half seats 9, so that the sleeve body 8 can be lifted and adjusted.
[0019] Specifically, the connecting half seat 9 at each end of the embodiment is provided with a semicircular cavity 11, an inner thread is arranged on the inner wall of the semicircular cavity 11, and the vertical screw rod 4 is connected with the inner thread; after pouring is completed, the vertical screw rod 4 can be separated from the connecting half seat 9 by further rotating the vertical screw rod 4, so that the vertical screw rod 4 can be pulled out, so as to be recycled and reused.
[0020] The embodiments of the utility model are described in detail in combination with the drawings, but the utility model is not limited to the described embodiments. For those skilled in the art, various changes, modifications, replacements and modifications can be made to these embodiments without departing from the principles and spirits of the utility model, and still fall within the protection scope of the utility model.
Claims
1. A device for positioning a sleeve in a pre-buried position in a beam, comprising a beam reinforcement cage (1), characterized in that, The upper end of the beam steel framework (1) is clamped with a suspension lifting assembly, the lower end of the suspension lifting assembly is detachably installed with a sleeve hoop assembly (5), the sleeve hoop assembly (5) is sleeved on the outer wall of a PVC pipe (6), and the sleeve hoop assembly (5) and the PVC pipe (6) are located in the beam steel framework (1).
2. A sleeve device for positioning a pre-embedded sleeve in a beam according to claim 1, characterized in that The suspension lifting assembly comprises a first nut (3), the two ends of the first nut (3) are symmetrically provided with transverse screw rods (2), the two ends of the transverse screw rods (2) are arranged on the upper end of the beam steel framework (1), a vertical screw rod (4) is screw-connected in the first nut (3), the lower end of the vertical screw rod (4) extends into the beam steel framework (1), and the lower end of the vertical screw rod (4) is screw-connected with the sleeve hoop assembly (5).
3. A sleeve device for positioning a pre-embedded sleeve in a beam according to claim 2, characterized in that Second nuts (7) are screw-connected on the two ends of the transverse screw rods (2), and the second nuts (7) correspond to the inner wall of the beam steel framework (1).
4. A sleeve device for positioning a pre-embedded sleeve in a beam according to claim 2, wherein, The sleeve hoop assembly (5) comprises a hoop body (8), the two ends of the hoop body (8) are provided with connecting half seats (9), the two ends of the connecting half seats (9) are provided with corresponding connecting through holes (10), and the vertical screw rod (4) is arranged between the two connecting half seats (9).
5. A sleeve device for positioning a pre-embedded sleeve in a beam according to claim 4, characterized in that Half circular cavities (11) are arranged in the two connecting half seats (9), the inner wall of the half circular cavities (11) is provided with internal threads, and the vertical screw rod (4) is connected with the internal threads.